| 1 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and backfilling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 2 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11KV DP including conveyance of materials. |
| 3 | Transporting poles by hired vehicle to a distance up to 5km and carrying up to 4 numbers of poles excluding loading & unloading charges. |
| 4 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 5 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. |
| 6 | Fitting one Additional 75x40mm, 1.8m channel cross arm in existing single pole including conveyance of materials |
| 7 | Fitting one Additional V cross arm in existing single pole including conveyance of materials. |
| 8 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 9 | Fitting and erecting one HT A type single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 10 | Fitting and providing one HT stay for 11KV pole including digging and back filling pit in ordinary soil. |
| 11 | Additional rate for refitting/redoing one Shackle set, including reshackling one span while renewing any type of LT pole. |
| 12 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 13 | Drilling hole of various sizes on existing Channel/Cross arm |
| 14 | Fitting one No. section fuse on LT line with dropping cables, crimping sockets, connections with bolt & nut etc. |
| 15 | Fitting one set (3 No) 11 KV LA and giving connections excluding earthing |
| 16 | Dismantling ( without damage) one LT PSC/RCC pole after disconnecting stays, strut, etc.attached thereon and stacking the same |
| 17 | Stringing of one km 3 PH 11KV line with XLPE Insulated ACSR Raccoon or equivalent (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cuttng and removing tree branches wherever necessary excluding cut point works. |
| 18 | Providing concrete muffing of size 0.45x0.45x1.5m ( 0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, plastering (1:3) 12mm 0.45x0.45mx5sides |
| 19 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. |
| 20 | Pole numbering using printed Aluminium sheets of 22 SWG having size 20x12 cm or Painting the surface of line supports where numbers are to be inscribed, Pole nubers shall be painted in circular / rectangular background, using approved quality anti algal yellow paint in two coat after scraping and cleaning the surface at a height of 2.5 metre above ground level. The nuber and letters should be at least 2cm in heght x 1.5cm in width. including cost of paint. |
| 21 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc.attached thereon and stacking the same. |
| 22 | Fitting and erecting one HT Double pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 23 | Transferring LT Single phase 2/3 OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 24 | Fitting and providing one HT Fly stay for 11KV pole using HT PSC pole including digging and backfilling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 25 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 26 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 27 | Providing bridging at Cut points for 3 PH 11KV line with XLPE Insulated ACSR Raccoon or equivalent (1 conductors) using IPC and respective conductors. |
| 28 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 29 | Providing one coil earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 30 | Fitting and providing one strut using HT PSC pole including digging and backfilling pit in ordinary soil. |
| 31 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 32 | Insertion one HT PSC pole in existing OH line including digging & backfilling pit in ordinary soi, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). Please Enable Macros to View BoQ information |