| 1 | Providing one Coil Earth using No8 GI earth wire (50 mm dia,115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling |
| 2 | Reshackling one span LT single phase 2 wire OH line including pin binding, jumpering,replacing insulators/cross arms/shackle,tightening stay, cutting tree branches etc wherever necessary including conveyance of all materials. |
| 3 | Reshackling one span LT three phase 4 wire OH line including pin binding, jumpering, replacing insulators/cross arms/shackle,tightening stay, cutting tree branches etc.wherever necessary including conveyance of all materials. |
| 4 | Providing one Earth using GI earth pipe of size 38.1mm dia2.5m length including digging separate pit (0.45 x 0.45 x 2.5 m) at a minimum distance of 1.5 m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil and backfilling |
| 5 | Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11KV DP incl. conveyance of materials. |
| 6 | Transporting poles by hired vehicle to a distance up to 5km and carrying up to 4 poles excluding loading & unloading |
| 7 | Transporting LT ABC by hired vehicle to a distance up to 5km and carrying up to 2 drum including loading & unloading using crane |
| 8 | Installing one DTR Meter with box (normal size 40x25x100cm) on existing poles including fixing of 3 CTs on bus bar, laying and termination of control cable using proper lugs, fixing of meters, capacitors, control fuses and giving the complete connections including conveyance of materials. |
| 9 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 10 | Fitting and erecting one HT A type pole in position incl. fitting cross arm,digging & back filling pit in ordinary soil(as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision of earthing) |
| 11 | Fitting and erecting one HT PSC type pole in position incl. fitting cross arm, digging & back filling pit in ordinary soil(as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision of earthing),drawing earth leads |
| 12 | Providing concrete muffing (0.45x0.45x1.5m) ( 0.5m above GL and 1m below GL).Excavation 0.45x0.45x1m concrete (1:3:6 20mm) 0.45x0.45x1.5m.Plastering (1:3) 12mm 0.45mx0.45mx 5 sides |
| 13 | Fitting and erecting one HT Double pole structure using A type pole in position incl. fitting 2 No channel cross arm,digging & back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing |
| 14 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 15 | Dismantling (without damage) one LTPSC/RCC Strut pole including removal of clamps and stacking |
| 16 | Fitting one set AB switch on existing DP giving connection and drawing sufficient length of GI earthing leads to the grounf for earthing excluding provision for earthing |
| 17 | Drilling hole of various sizes on existing Channel/Cross arm |
| 18 | Fitting and providing one Strut using 'A' type pole, including digging and back filling pit in ordinary soil. |
| 19 | Fitting and providing one HT Fly stay for 11KV Pole using HT PSC pole incl. digging and back filling pit in ordinary soil drawing sufficient length of GI earth leads to the ground for earthing (excluding provision for earthing) |
| 20 | Fitting and providing one strut using HT PSC pole incl. digging and back filling pit in ordinary soil |
| 21 | Disconnecting and lowering down the Single phase WP service connection with guy wire from the OH line incl. reconnecting the same after completing the line work |
| 22 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line incl. reconnecting the same after completing the line work |
| 23 | Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames of size ISA 50x50x6mm for outer frame, 2 runs of 40 x 6 MS flat for horizontal bracing and grills with MS rods 8 mm Dia @10cm c/c for verticals, providing gate with locking arrangements, providing danger board & name board, embeding the legs in cement concrete 1:2:4, footing of size 30cmx30cmx50cm, painting with synthetic enamel paint two coats over one coat of iron primer etc complete, incl cost of transportation |
| 24 | Cleaning and levelling of transformeryard/RMU, spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc. |
| 25 | Dismantling one damaged 11 kV PSC/RCC pole after disconnecting stays, strut, etc. attached thereon and stacking the same |
| 26 | Dismantling (without damage) one AB switch from existing structure and bringing back to section store. |
| 27 | Dismantling one ordinary street light /CFL/LED fitting from the existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires |
| 28 | Dismantling ( without damage) one LT PSC/RCC pole after disconnecting stays, strut, etc. and stacking the same |
| 29 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays,strut etc and stacking the same |
| 30 | Cutting trees having girth beyond 30cm but upto and including 60cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No. |
| 31 | Dismantling (without damage) one Channel cross arm from existing DP structure and bringing back to section store. |
| 32 | Providing WP support with PSC poleincluding digging & back filling pit in ordinary soil. excluding transportation of poles. |
| 33 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 34 | Erection of suspension clamp for 11KV ABC of any size |
| 35 | Fiting One no MVT on existing cross armexcluding termination work (for One phase) of any rating for 11 kV AB Cable |
| 36 | Dismantling one Transformer (upto andincluding 160kVA) from existing structure and loading to any vehicle directly, including disconnecting HT/LT/Earth connections. |
| 37 | Fitting one Additional 75x40mm, 1.8mChannel cross arm in existing single pole including conveyance of materials. |
| 38 | Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm and connecting to existing MVT or otherterminals,using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 39 | Dismantling (without damage) one km LTthree phase 4 wire OH line conductor bydismantling cross arms, insulators andstacking the conductors in rolls properly. |
| 40 | Dismantling (without damage) one km LTadditional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly |
| 41 | Stringing, shackling, fitting cross arms,insulators and binding, giving jumperconnection etc. using ACSR Rabbit, for one km LT 3ph 5 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place |
| 42 | Transferring LT 3 phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding ete complete |
| 43 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding ete complete |
| 44 | Fitting 6 channel cross arms, AB switch,DO fuse,Station class LA,HT & LT connections upto OH lines etc on existing DP structure,Fixing distribution box/provision for one set (3 No) of LT fuses,drawing sufficient lemgth of GI earthing leadsto the groubd for earthing excluding provision for earthing and mounting of transformer on poles |
| 45 | Erecting one 100 kVA Transformer to existing DP and giving connections including loading from TMR/SRS/other stacking places & unloading at site but excluding cost for transporting transformer |
| 46 | Dismantling transformer station withtransformer erected in DP structure bydismantling HT Double Pole Structure using PSC pole after disconnecting stay wires, 10 channel cross arms,AB switch, DO fuse, LA, GI earthing leads, DTR meter with box with metering equipment, CTs, Distribution Box, statutory display boards etc. but excluding the rate of dismantling transformer, earthing, staysets & fencing. |
| 47 | Stringing of 11 kV Aerial bunched cable of size 3 x 150 + 1 x 120 sqmm withbare/insulated Messenger through existing poles |
| 48 | Providing Cable Tie |
| 49 | Additional rate for excavation of one Earth Pit(2.5m depth) in Laterite. |
| 50 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. |
| 51 | Additional rate for excavation of one Pit for HT pole/ HT stay in hard laterite |
| 52 | Additional rate for excavation of one Pit for HT pole/ HT stay in soft rock |
| 53 | Additional rate for excavation of Pit for A type pole in hard Laterite |
| 54 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets,connecting with bolt & nut etc. |
| 55 | Dismantling one section fuse from structure and bringing back to section store Please Enable Macros to View BoQ information |