| 1 | SSR Item No.-2.5(C) -Dismantling of RCC conc. In canal bed. Side lining, beam, haunch portion & damaged construction joint. (Base rate adopted SOR of MPRRDA w.e.f. 01.01.2024) |
| 2 | UCSR Item No.-2.07.1-Earthwork for embankment (hearting/casing) using selected soil from approved barrow areas in layers of 250 to 300mm (before compaction) i/c cost of all materials, machinery, labour and dressing all other operation such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges/sides, watering, compaction to achieve maximum dry density using sheep foot roller/vibratory compaction etc. complete. (Lead more than 1 Km. but up to 2.00 Km. as per Annexure-II of SOR serial no.7 ) |
| 3 | UCSR Item No.-5.02-Providing & laying M-10 grade plane cement conc. Design mix using 40 mm graded aggregate, clean, hard for foundation filling i/c cost of all materials, machinery, labour, formwork, cleaning batching, mixing, placing in position, leveling, vibrating, finishing, curing, packing joints of shuttering etc. complete. |
| 4 | UCSR Item No.-3.13-Providing, fabricating and placing in position steel reinforcement steel bars for reinforced cement conc. / plain cement conc. Structures i/c cost of all material, machinery, labour, cleaning, straightening, cutting, bending, hooking, lapping/welding joints wherever required, tying with 1.25 mm diameter soft annealed steel wire etc. complete. |
| 5 | UCSR Item No.-5.05.2-Providing & laying M-20 grade reinforced cement conc. Design mix using graded aggregate clean, hard superstructure i/c cost of all materials. (excluding cost of providing and placing reinforcement steel/bars), machinery, labour, formwork, scaffolding, cleaning batching, mixing, placing position, leveling, vibrating, finishing, curing, packing joints of shuttering etc. complete. Using graded aggregate of 20 mm. Please Enable Macros to View BoQ information |