|
| 1 | Providing Manpower through Contracting agency for Supervision / Execution / Operation of various Electromechanical Installations. (one shift of 8 working Hrs per day ) on basis of minimum wages + VDA order Dt. 28.03.2025 Ministry of Labour and Employement Govt. of India |
| 2 | Wireman, Electrician, Welder, Lineman, AC Mechanic, Fireman, , Supervisor, ELV technician or equivalent professional with ITI or Equivalent course and Experience of 2 years in relevant field ) |
| 3 | Technical Helper Having basic Knowledge of E&M Services |
| 4 | Rewinding of ceiling fan motor (starting and running winding) including all necessary material. The motor is to be wound taking no. of coils, turns and pitch as it was originally wound with required size super enamelled wire with 'E' class insulation material and making connections etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. (New model ceiling fan) |
| 5 | 900/1200 mm sweep (New model ceiling fan) |
| 6 | 1400 mm sweep (New model ceiling fan) |
| 7 | All sizes (Old model ceiling fan) |
| 8 | Labour charges for removing and refixing of Ceiling fan/ Exhaust fan from site |
| 9 | Charges for oiling, overhauling of ceiling fan, table fan, pedestal fan irrespect to the size of fan including removing,refixing of fan from site and testing etc. as required. |
| 10 | Fans w/o Removing & Refixing |
| 11 | Fans with Removing & Refixing at Suitable Location |
| 12 | Providing and Replacement of ball bearing of ceiling/ exhaust fan and refixing the same at suitable location as requiredand as per OEM recommendations. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material shall be retained by the contractor. |
| 13 | Provinding & Replacement of M.S. Shaft of ceiling fan. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 14 | Providing and Replacement of Gun metal bush of ceiling/exhaust/cooler fan/ as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 15 | P & F 3 Speed rotary switch for Desert Cooler complete with testing etc as required. |
| 16 | P & Replacement of M.S. Shaft of fan motor for Desert Cooler/ exhaust fan. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 17 | P & replacement of supporting legs(4 no.) of vertical pump of desert cooler as required for Desert Cooler/ exhaust fan. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 18 | P & F of ISI marked vertical pump suitable for 20\\" desert cooler including making connection testing etc. as required. |
| 19 | ISI marked vertical pump |
| 20 | P & F of submercible pump set suitable for 18/24 \\"Desert coolers. |
| 21 | P & F of submercible pump set suitable for 36 \\"Desert coolers. |
| 22 | Rewinding of Heavy duty Exhaust fan motor including all necessary material,The motor is to be wound taking no. of coils,turns and pitch as it was originally wound with required size super enamelled wire with 'E' class insulation material and making connections etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 23 | 300/ 380 mm sweep |
| 24 | 450 mm sweep |
| 25 | Rewinding of motor of desert cooler fan with super enamelled copper wire, 'E ' class insulation material including removing,refixing,testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 26 | S & F of capacitor of 230V/ 275V, 50Hz rating of plastic casing and terminals -Lugs or copper wire. |
| 27 | Running capacitor |
| 28 | 2.5/3.15 micro farad |
| 29 | Rewinding of single phase/3phase submersible motor including all necessary material and of the same characteristics as original with required size of super enamelled wire 'E' class insulation material and testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 30 | Above 3.0 HP to 5.0 HP |
| 31 | From7. 5 HP to 10.0 HP |
| 32 | Repairing of submersible pump of with replacement of broken impellers ,diffuser,bush/bearing set , oil seal complete with testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 33 | Above 3.0 HP to 5.0 HP |
| 34 | From7. 5 HP to 10.0 HP |
| 35 | Providing & Fixing of BEE Star rated copper wounded with class of Insulation 'F', double ball bearing capacitor start, aluminium body & aluminium blade ceiling fan conforming to all the performance requirements laid down in IS 374:2019 with down rod up to 30 cm with secondary support safety cable ( steel rope) , cotter pin, shackle kit with 3 x 1.5 sq.mm pvc insulated flexible copper conductor and making connection testing etc. as required. |
| 36 | 1200 mm Sweep BEE 1 Star rated (service value >=4.0 to < 4.5 ) |
| 37 | Providing & Fixing of of M.S. J- hook of standard design made out of 16 mm dia. M.S. round bar and fixed with cement concrete mortar with required support as required. |
| 38 | Providing & Fixing of Heavy duty capacitor start, copper wound Double ball bearing 900/1400 RPM single phase Exhaust fan conforming to IS:2312 marked in existing opening including making connections testing etc. as required. |
| 39 | 300 mm sweep(900 RPM) |
| 40 | Labour charges for installation of submersible motor pump set including lowering/ delowering of pipes, cables, accessories etc. in tube-well/ open well complete including T&P, transportation of tripod, chain pulley block & any other material required for this purpose complete in all respect. |
| 41 | Delowering and Lowering |
| 42 | SITC of Dewatering Submersible Motor Pump set, motor should be IP68/F class/IE3class suitable to handle raw sewage suitable for Minimum 25 mm solid and CI Impellor, CI body & housing ( as per IS-210 standard) and SS shaft, Double mechanical seal etc. as required. Pump shall have following HP Rating, phase, Head, minimum Discharge respectively 10 Mtr cable length etc. complete in all respect. The submersible pumpset shall be suspended with chain for ease of connection and disconnection from discharge pipe assembly. |
| 43 | 2.0 HP, 3-Ø, (8 - 15)Mtr, (480 - 50) LPM |
| 44 | Providing & Laying XLPE insulated & P.V.C. sheathed Armoured Aluminium cable confirming to IS :7098 P - I of 1.1 KV with H4- Grade electrolytic aluminium conductor confirming to IS 8130 of purity >99.6 %, round / flat strip armouring of cables, Inner / outer sheath confirming to IS:5831 in existing RCC / Hume / Stoneware / PVC pipe/ open duct/cable trench / Cable tray(with cable tie) including testing commissioning etc. as required of following size. |
| 45 | 50.0 Sq. mm |
| 46 | 3.5 core Please Enable Macros to View BoQ information |