Power Government Departments Closing in 0 days TDR #55275096

Tender For Tender For providing & Erection For Proposed 11/0.4Kv 63Kva S/Stn At Village Lower Kangar & For providing & Erection 11 Kv Ht Line To Proposed 11/0.4Kv 63 Kva S/Stn At Village Lower Kangar & For providing & Erection 3Ph Lt Line Extension F

Issued by Government Departments · Haroli, Himachal Pradesh
Tender Value
9.56 Lakhs
Estimated cost
Bid Submission
06 May 2026
0 days left
EMD
9564
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Haroli → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Tender For providing & Erection For Proposed 11/0.4Kv 63Kva S/Stn At Village Lower Kangar & For providing & Erection 11 Kv Ht Line To Proposed 11/0.4Kv 63 Kva S/Stn At Village Lower Kangar & For providing & Erection 3Ph Lt Line Extension For Interlinking Of Newly Proposed 11/0.4Kv 63Kva S/Stn With Existing Dtr To Improve The Voltage In Village Lower Kangar& For providing & Erection For Proposed 11/0.4Kv 63Kva S/Stn At Village Lower Badhera & For providing & Erection 3Ph Lt Line Extension & Augmentation Of 1Ph To 3Ph Line From New 11/0.4Kv 63Kva Dtr In (E)Section Badhera Uesd Hpsebl Haroli (Due To Lt To Ht Metering Of Iph /Jsv Deptt.)

BOQ

Name of Work:- Tender for prov. & erection for proposed 11/0.4kv 63kva s/stn at village lower kangar & for prov. & erection 11 KV ht Line to proposed 11/0.4kv 63 Kva s/stn at village lower kangar & for prov. & erection 3ph LT line extension for interlinking of newly proposed 11/0.4kv 63kva s/stn with existing DTR to improve the voltage in village lower Kangar& for prov. & erection for proposed 11/0.4kv 63kva s/stn at village lower Badhera & for prov. & erection 3ph LT line extension & augmentation of 1ph to 3ph line from new 11/0.4kv 63kva DTR in (E)section Badhera UESD HPSEBL Haroli (due to LT to HT Metering of IPH /JSV Deptt.)
Sl. No. Item Description
1Erection Part of 11/0.4 KV, 63 KVA Transformer (T.S no299 /2025-26)
2Erection of S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. ( 63 KVA Transformer)
3Transportation and Loading of materials sub-station materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage.
4Erection Part of 11 KV HT Line T. Sno.298/2025-26
5Erection of S.T Single Pole 9 Mtr. Long :- Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
6Erection of Tapping Structure S.T Double Pole 9 Mtr. Long - Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
7Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
8Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
9Stringing and sagging conductor:- Laying of conductor (AAAC 7/3.81 mm 80 mm²) stringing and sagging, binding with insulator complete in all respect.
10Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.
11Fixing jumper complete in all respect.
12Erection of GO switch complete in all respect.
13Erection of DO Fuse complete in all respect.
14Transportation and Loading of materials HT lines materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage.
15Erection Part of 3Ph LT Line (T.s NO :-297/2025-26)
16Erection of LT line.Digging of pit of stay, Erection of ST Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
17Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
18Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
19Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 3-Ph. L.T Line complete in all respect.
20G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
21Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work.
22Erection Part of 11/0.4 KV, 63 KVA Transformer (T.S no333 /2025-26)
23Erection of S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. ( 63 KVA Transformer)
24Transportation and Loading of materials sub-station materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage.
25Erection Part of 3Ph LT Line& aug 1ph to 3ph (T.s NO :-332/2025-26)
26Erection of LT line.Digging of pit of stay, Erection of ST Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
27Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
28Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
29Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 3-Ph. L.T Line 0.960km augmentation 1-ph to 3ph lt line =500complete in all respect.
30G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
31Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work.
32Supply Part of 11/0.4 KV, 63 KVA Transformer(T.S no299 /2025-26)
33Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 63 KVA(Supply by HPSEBL 1nos)
34Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) (Supply by HPSEBL 2nos)
35Prov. RCC Muff
36Prov. concrete filling in RCC muff
37Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
38Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA.
39Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
40Transformer Belting & Knee Bracing
41Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed]
42Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer]
43Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
44Prov. MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos
45Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing)
46Transformer L.T Distribution Box and GO Switch fixing Assembly
47Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
48Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No.
49Prov. GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm
50Prov. GO AB Switch Unit (11kV, 400A, 100 KA) Tripple Pole O/d Type
51Prov. D.O Fuse Unit
52Prov. Surge Arrester, 9 kV Station Class (Porcelain Type)
53Prov. Discs insulator (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) CD- 400mm
54Prov. Stay set complete
55Prov. Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set)
56Prov. Pipe Earthing Set
57Prov. 6 SWG GI wire For Earthing
58Prov. LT Distribution Panel Box with MS Sheet of 1.6 mm ( 900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm)inside .painted /powder coated after primar coating MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp for 63 KVA DTR
59Prov. Half Clamp (M.S. Flat 50X6 mm)
60Prov. Full Clamp (M.S. Flat 50X6 mm)
61Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
62Prov. Aluminium Thimble
63Prov. Copper Thimble 200 Amp
64Prov. Danger Plate
65Prov. Barbed Wire
66Prov. LT Cable 3.5 X 120 mm² 1.1 kV XLPE Cable Unarmoured (Supply by HPSEBL 30 mtr.)
67Prov. Aluminium Paint.
68Prov. Red Oxide
69Chain Link fencing , Angle Iron ,Gate etc for transformer fencing complete in all respect.
70Supply Part of 11 KV HT Line T.S No298/2025-26
71Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) with Steel cap & Base Plate)Provided by HPSEBL 8Nos)
72Prov. RCC Muff
73Prov. concrete filling in RCC muff
74Prov. (AAAC 7/3.81 mm 80 mm²) mm Conductor(Prov.by HPSEBL 1.515 Kms.)
75Run Through Str. ( ∆) Formation on Singlr Pole Str.
76Prov. Cross Arm (Channel Iron (100x50x6) Length 1270 mm for single pole
77Prov. Angle Iron (50x50x6mm) Leggth 750 mmx 2*2 nos structure
78Prov. Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm
79Prov.11kv Pin Insulator with pin complete in all respect
80HT Stay /Guy Arrangement
81Prov.11kv Stay set complete in all respect
82Prov. Stay Wire HT (10 kg. per Stay Set)
83Earthing
84Prov.11kv Earthing set complete in all respect.
85Prov.G.I.Wire No. 8 SWG in mtr.
86Prov.Eye/Earth Hook
87Prov.M.S Channel Iron :50x50x6,length:2800mm for road crossing
88Prov.MS Half Clamp
89Prov.MS Full Clamp/stay
90Prov.11kv Danger Plate (250x200x1.6 mm) (supply by HPSEBL 8 No.)
91Prov.Nuts and Bolts of Various Sizes
92Prov.Barbed Wire
93Prov. Red Oxide
94Prov. Aluminium Paint.
95Tapping Str. Supply Material
96Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) with Steel cap & Base PlateProvided by HPSEBL 2Nos)
97Prov. RCC Muff
98Prov. concrete filling in RCC muff
99Prov.Belt set -MS Angle Iron 50x50x6,Length 1800mm x2No.
100Prov.X-Bracing set -MS Angle iron 50x50x6,length 2125mmx2no
101Prov.X-Arm (Horizontal )Ms Channel (100x50x6,Length 2340x2mm2no formation
102Prov.11kv Earthing set complete in all respect.
103Prov. GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length: 460 mm
104Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
105Prov. GO AB Switch Unit (11kV, 400A, 25 KA) Tripple pole O/D type
106Prov. D.O Fuse Unit
107Prov. Stay set complete
108Prov. Stay Wire HT (10.0 kg Per Stay Set)
109Prov.Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Disc Polymeric,TC, 90 KN ) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)complete for double pole str in all respect.
110Prov. Half Clamp (M.S. Flat 50X6 mm)
111Prov. Full Clamp (M.S. Flat 50X6 mm)
112Supply Part of 3-Phase LT Line(T.s NO :-297/2025-26)
113Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage}(Prov.by HPSEBL Supply by HPSEBL 1.960)
114Prov. ST Pole 8 mtr.long .(Supply by HPSEBL 7NOS)
115Prov. RCC Muff
116Prov. concrete filling in RCC muff
117Prov. Channel iron (75x40x5) Length 1.5 mtr. + 0.2 mtr.
118Prov. Shackle Insulator (16 Kn) M.s D-Iron with nuts and bolts.
119Prov. Earth Hook
120Prov. LT Stay Set Stay Wire(i/c Stay Clamp)
121Prov. stay wire (7/3.15 mm) (6.0 kg Per Stay Set)complete in all respect.
122Prov.Half Clamp
123Prov. Full Clamps [ 1 No for Stay Set]
124Prov. Earthing Set complete
125Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m
126Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
127Prov. Red Oxide
128Prov. Aluminium Paint.
129Prov. Spiral PVC Spacer
130Supply Part of 11/0.4 KV, 63 KVA Transformer(T.S no333 /2025-26)
131Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 63 KVA(Supply by HPSEBL 1nos)
132Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) (Supply by HPSEBL 2nos)
133Prov. RCC Muff
134Prov. concrete filling in RCC muff
135Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
136Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA.
137Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
138Transformer Belting & Knee Bracing
139Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed]
140Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer]
141Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
142Prov. MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos
143Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing)
144Transformer L.T Distribution Box and GO Switch fixing Assembly
145Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
146Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No.
147Prov. GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm
148Prov. GO AB Switch Unit (11kV, 400A, 100 KA) Tripple Pole O/d Type
149Prov. D.O Fuse Unit
150Prov. Surge Arrester, 9 kV Station Class (Porcelain Type)
151Prov. Discs insulator (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) CD- 400mm
152Prov. Stay set complete
153Prov. Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set)
154Prov. Pipe Earthing Set
155Prov. 6 SWG GI wire For Earthing
156Prov. LT Distribution Panel Box with MS Sheet of 1.6 mm ( 900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm)inside .painted /powder coated after primar coating MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp for 63 KVA DTR
157Prov. Half Clamp (M.S. Flat 50X6 mm)
158Prov. Full Clamp (M.S. Flat 50X6 mm)
159Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
160Prov. Aluminium Thimble
161Prov. Copper Thimble 200 Amp
162Prov. Danger Plate( Supply by HPSEBL2nos)
163Prov. Barbed Wire
164Prov. LT Cable 3.5 X 120 mm² 1.1 kV XLPE Cable Unarmoured (Supply by HPSEBL 30 mtr.)
165Prov. Aluminium Paint.
166Prov. Red Oxide
167Chain Link fencing , Angle Iron ,Gate etc for transformer fencing complete in all respect.
168Supply Part of 3-Phase LT Line &aug 1ph to 3ph (T.s NO :-332/2025-26)
169Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage}(Prov.by HPSEBL Supply by HPSEBL 1.460)
170Prov. ST Pole 8 mtr.long .(Supply by HPSEBL 4NOS)
171Prov. RCC Muff
172Prov. concrete filling in RCC muff
173Prov. Channel iron (75x40x5) Length 1.5 mtr. + 0.2 mtr.
174Prov. Shackle Insulator (16 Kn) M.s D-Iron with nuts and bolts.
175Prov. Earth Hook
176Prov. LT Stay Set Stay Wire(i/c Stay Clamp)
177Prov. stay wire (7/3.15 mm) (6.0 kg Per Stay Set)complete in all respect.
178Prov.Half Clamp
179Prov. Full Clamps [ 1 No for Stay Set]
180Prov. Earthing Set complete
181Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m
182Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
183Prov. Red Oxide
184Prov. Aluminium Paint.
185Prov. Spiral PVC Spacer Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 55275096
AUTHORITY Government Departments
TENDER VALUE 9.56 Lakhs
LAST DATE 06-05-2026
Authority
Authority Name Himachal Pradesh State Electricity Board
Work Description Tender for Tender For providing & Erection For Proposed 11/0.4Kv 63Kva S/Stn At Village Lower Kangar & For providing & Erection 11 Kv Ht Line To Proposed 11/0.4Kv 63 Kva S/Stn At Village Lower Kangar & For providing & Erection 3Ph Lt Line Extension For Interlinking Of Newly Proposed 11/0.4Kv 63Kva S/Stn With Existing Dtr To Improve The Voltage In Village Lower Kangar& For providing & Erection For Proposed 11/0.4Kv 63Kva S/Stn At Village Lower Badhera & For providing & Erection 3Ph Lt Line Extension & Augmentation Of 1Ph To 3Ph Line From New 11/0.4Kv 63Kva Dtr In (E)Section Badhera Uesd Hpsebl Haroli (Due To Lt To Ht Metering Of Iph /Jsv Deptt.)
Basic Detail
Tender No NO/HED-10/2026-27
Bidding Type Tender
Location
City Haroli
State Himachal Pradesh
Key Dates
Publish Date 29 Apr 2026
Submission Date 06 May 2026
Open Date 06 May 2026
Finance
Tender Value 9.56 Lakhs
Tender Fee 590
EMD 9564
Exemption Not Available
Document List
Tendernotice_1.pdf
termandcondition.pdf
3fbad534-5058-42aa-84f3-492be01fb45f.html
additionaltermandcondition.pdf
BOQ_200357.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Apr 29, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
May 06, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
May 06, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_1.pdf

pdf

termandcondition.pdf

html

3fbad534-5058-42aa-84f3-492be01fb45f.html

pdf

additionaltermandcondition.pdf

xls

BOQ_200357.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders