| 1 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge. |
| 2 | Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead |
| 3 | Filling in foundatin and plinth with sand watered and rammed etc including all cost conveyance roalty ,labour and T&P etc. complete as directed by the Engineer - in Charge |
| 4 | Cement concrete (1:3:6)with 4cm size hard granite metal per 1cum |
| 5 | R.C.C. work of M-20 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including hoisting and laying |
| 6 | Rigid and smooth centering and shuttering for R.C.C. works including cost of materials (R.C.C. foundation, plinth band and footings bases of columns mass concrete pre-cast slabs) |
| 7 | Rigid and smooth centering and shuttering for R.C.C. works including cost of materials (R.C.C.beams,column,grider and bressmer, etc) |
| 8 | Supplying ,fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. |
| 9 | Brick work with Fly ash bricks of 23 Cm. x 11 Cm. x 8 Cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in foundation and plinth per cum. |
| 10 | 16 mm. thick cement plaster (1 :6) over brick or stone masonry per 1Sqm. |
| 11 | 6 mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chiping and slury treatment. Per 1 Sqm |
| 12 | Iron work for door, window, grills, welding, Labour, carrrage placing in position etc complete . |
| 13 | Painting two coats with enamel paints over one coat of primer with approved quality paints & primer to Wood/Iron work including cost of paints & primer,T&P and labour charges etc complete. |
| 14 | Finishing wall surface with weather coat paint of approved shade on new work of two coats over one coat of primer including cost of paints & primer and labour charges etc complete. |
| 15 | Removing the Dismantling materials and excavated earth upto 5 Km from the site quantity as per item No.1 & 2 |
| 16 | Add for Transparancy board ,Taking photograph and Signage |
| 17 | Supply, Fitting and Fixing of 3D letter Led light sign board in Odia with English letter Please Enable Macros to View BoQ information |