| 1 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5mrespectively ) |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. |
| 3 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:(1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 5 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge:1:3:6 or richer mix (i/c equivalent design mix) |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 8 | Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand |
| 9 | Unloading sand/earth filled bags from boats Placing in Water |
| 10 | Supply of Sand |
| 11 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. |
| 12 | Clearance of sump tank with the aid of bucketing by engaging 15 labour for 04 days |
| 13 | Supply of E . C. Bags |
| 14 | Dismantling of E.C Bags filled with sands by engaging 3 labour for 2 days |
| 15 | Slip Clearance : - In ordinary soils disposal lead upto 50 m and lift upto 1.5m |
| 16 | Slip Clearance : - In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. |
| 17 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns etc for mass concrete |
| 18 | Carriage of sand and bajri(20mm) on an avg distance of 10 km by MT and 200 m by HL Please Enable Macros to View BoQ information |