|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil |
| 2 | CARRIAGE OF MATERIALS Carriage of material by Mechanical Transport including loading, unloading and stackingEarth Lead - 1 Km |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 4 | Brick work with FALG bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 5 | Supplying and filling in plinth with brickbats under floors, including watering, ramming, consolidating and dressing complete. |
| 6 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 7 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density in accordance to Table No. 400-12, 400-13 and as per clause of section 406 of specifications. |
| 8 | Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment). Black cotton soil |
| 9 | Supplying & Stacking of Selection No.1 doob grass turf at site fresh & free from weeds having proper roots in green including loading, unloading, carriage and all taxes paid etc.and as per direction of officer in charge. Grassing with selection No. 1 Doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and good earth shall be paid for separately). In rows 5 cm apart in both directions |
| 10 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shapedwashers etc. complete. Hot finished welded type tubes |
| 11 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work |
| 12 | 2 manpower per day for preparation of Turf Pitch materials ( Earth, brick bats, Concrete,WMM, Sand as per requirement) by Carriage ramming, Seiving, Compacting etc all complete job as per instruction of Engineer in charge. |
| 13 | 1 manpower per day for maintenance of pitch by ramming of earth/ground, grass cutting, surface dressing, rolling, watering etc. all complete job as per instruction of EIC |
| 14 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |