| 1 | Part A |
| 2 | Providing and laying Vitrified tiles in floor in differentsizes (thickness to be specified by the manufacturer) withwater absorption less than 0.08% andconforming to IS:15622, of approved brand &manufacturer, in all colours and shade, laid on 20 mmthick cement mortar 1:4 (1 cement: 4 coarse sand) jointingwith grey cement slurry @3.3 kg/sqm including groutingthe joints with white cement and matching pigments etc.The tiles must be cut with the zero chipping diamondcutter only . Laying of tiles will be done with the notchtrowel, plier, wedge, clips of required thickness, levelingsystem and rubber mallet for placing the tiles gently andeasily. Glazed Vitrified tiles Matt/Antiskid finish of sizeof Tile 800 x 1200 mm. As per DSR item no 11.41A.3.4 |
| 3 | Clearing jungle including uprooting of rank getation,grass, brush wood, trees and saplings of girth up to 30 cmmeasured at a Height of 1 m above ground level andremoval of rubbish up to a distance of 50 m outside theperiphery of the area cleared. (As per DSR item no-2.31) |
| 4 | \\"Earth work in excavation by mechanical means(Hydraulic excavator)/ manual means over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10sqm on plan) including getting out and disposal ofexcavated earth lead upto 50 m and lift upto 1.5 m, asdirected by Engineer-incharge.All kinds of soil (As perDSR itemn no-2.6.1)\\" |
| 5 | Providing and fixing in position LDPE film of 150 micron(0.15 mm) IS mark of Grade 231 for bed and sides ofcanal including cost of all materials, labour, laying,joining as per specifications etc., complete. As perMPWRD SOR Item no 4.06 |
| 6 | \\"Providing and laying in position cement concrete ofspecified grade excluding the cost of centering andshuttering - All work up to plinth level 1:2:4 (1 cement : 2coarse sand (zone-III) derived from natural sources : 4graded stone aggregate 20 mm nominal size derived fromnatural sources)as per CPWD SOR Item no 4.1.3\\" |
| 7 | Kota stone slab flooring over 20 mm (average) thick baselaid over and jointed with grey cement slurry mixed withpigment to match the shade of the slab, including rubbingand polishing complete with base of cement mortar 1 : 4(1 cement : 4 coarse sand) 25 mm thick. As per DSR itemno 11.26.1 |
| 8 | Grassing with selection No. 1 doob grass includingwatering and maintenance of the lawn for 30 days or moretill the grass forms a thick lawn, free from weeds and fitfor mowing including supplying good earth, if needed (thegrass and good earth shall be paid for separately). In rows5 cm apart in both directions. As per CPWD SOR(Horiticulture and Landscaping) item no 2.10.1 |
| 9 | Supplying and stacking of good earth at site includingroyalty and carriage upto 5 km lead complete (earthmeasured in stacks will be reduced by 20% for payment)..As per CPWD SOR (Horiticulture and Landscaping) itemno 2.2 |
| 10 | Supplying & Stacking of Selection No.1 doob grass turf atsite fresh & free from weeds having proper roots in greenincluding loading, unloading, carriage and all taxes paidetc.and as per direction of officer in charge. . As perCPWD SOR (Horiticulture and Landscaping) item no2.25 |
| 11 | Demolishing R.C.C. work manually/ by mechanicalmeans including stacking of steel bars and disposal ofunserviceable material within 50 metres lead as perdirection of Engineer - in- charge.as per CPWD SOR Itemno 15.30 @ 3551.25/Cum. |
| 12 | Add 18% GST on item Sr. no. 4 Please Enable Macros to View BoQ information |