| 1 | Providing, supplying, erection, testing and commissioning cast iron manually operated sluice gates of size 450mmWx300mmD at receiving chamber complete in all respect as per IS 13349:1992 |
| 2 | Providing, supplying, erection, testing and commissioning Manual Coarse Bar screen Channel Width: 900 mm, Channel Depth: 1200mm, Water Depth : 900 mm, Bar Spacing : 20 mm, Bar Thickness: 10x50mm, Angle of Inclination: 60 Degree MOC : SS-304. Complete in all respect |
| 3 | Providing and insertion of 219.10mm O/D, 6.3mm thick MS casing pipe ( Fe- 330 grade ) fabricated as per IS:3589 of 2001 from steel plates confirming to IS:2062 including cutting , beveling, grinding and jointing with radio graphically welding of pipe as per IS:1182 and testing complete in all respect. (Make: Jindal, Electrosteel, TATA) (For 219.10mm O/D, 6.3mm thick M.S pipe as per IS code) |
| 4 | Labour Rates for Horizontal boring for crossing casing pipe of size 323.90 mm o/d by jack pushing/horizontal direction drilling method trenchless technology complete in all respect under Highway. (For 323.90mm o/d dia 7.1mm thick M.S pipe as per IS code) |
| 5 | Labour Rates for Horizontal boring for crossing casing pipe of size 610 mm o/d by jack pushing/horizontal direction drilling method trenchless technology complete in all respect under Highway. (For 610mm O/D,12.5mm thick M.S pipe as per IS code) |
| 6 | Supplying, erection testing and commissioning of submersible pumping sets as per BIS Specification No.8034-1989 (as amended up to date for pumps) and IS. 9283-1979 (as amended up to date for motor) the pump motor sets should be capable of pumping clear fresh cold water having Characteristics as specified in Clause-4 of IS. 8034/1989 and Clause 4.1 of IS 9283/1979. (400 LPM - 200m Head - 30BHP) |
| 7 | Gaseous Chlorination System comprising Vacuum Chlorinators (2 Nos., 1W plus 1S), 0-5 kg/hr Capacity), Water Feed Pumps (2 Nos.: 1W plus 1S), Interconnecting Piping and Appurtenances, Chlorine Gas Detector, Empty Chlorine Tonners (Suitable for 30 days’ Storage) with Trunions, Lifting Device and Suspended Weighing Scale, Residual Chlorine Test Kit, first aid kit, Safety equipment (e.g. Exhaust Fan, Canisters, Gasmasks etc.), Mandatory Spares, Chlorine Leak Detection and Chlorine Leak Absorption System including FRP Half Hoods, Caustic Solution Tank, Caustic Recirculation Pump, Centrifugal Fan, Interconnecting Piping and Ducts and other required ancillary components complete in all respect. |
| 8 | Providing, supplying, erection, testing and commissioning Manual Coarse Bar screen Channel Width: 900 mm, Channel Depth: 1200mm, Water Depth : 600 mm, Bar Spacing : 20 mm, Bar Thickness: 10x50mm, Angle of Inclination: 60 Degree MOC : SS-304. Complete in all respect |
| 9 | Providing, lowering, cutting, jointing and testing RCC pipe class NP3, cast by vibrated method conforming to IS:458:2021, with spigot and socketed joints manufactured with ISI marked sulphate-resistant cement conforming to IS:12330 and concrete design mix minimum M-40 grade. Each pipe shall be lined internally with HDPE lining of uniform 2.5 mm thickness, fusion bonded or mechanically anchored to the concrete wall to provide resistance against corrosion and abrasion. The HDPE material shall conform to ASTM D1248 and IS:7328 standards. The reinforcement shall be of high tensile steel conforming to IS:1786 (Fe550 grade) and placed as per IS:458:2021. The rubber rings shall be ISI marked, anti-termite, as required at site, laid in trenches for all depths and laid to correct alignment, gradients and levels including dressing and trimming and cutting of concrete beds and sides of trenches, if required, jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degrees with faces of spigot and socket joints, cutting and finishing the cut surface to a uniform finish etc., as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage, loading and unloading complete in all respects.the internal diametric of the sewer being: 400mm I/d Pipe.. |
| 10 | Providing and insertion of 355.6 mm O/D,7.1mm thick MS casing pipe ( Fe- 330 grade ) fabricated as per IS:3589 of 2001 from steel plates confirming to IS:2062 including cutting , beveling, grinding and jointing with radio graphically welding of pipe as per IS:1182 and testing complete in all respect. (Make: Jindal, Electrosteel, TATA) |
| 11 | Supply of a multi-compartment LT Indoor panel with A/M change over switch for DG and EB power source, independent feeders for pumps, PLC Control panel with high speed PLC 24V DC redundant power supply and 7` ethernet enabled HMI, Provision for remote access via RJ45/RS485 ports, ready for future SCADA integration system, field instruments, including Pump Monitoring Unit (PMU), UPS, for Pump operation VFD panel with a bypass switch and emergency Star/Delta starter, A/M switch for Auto control from PLC, Push buttons for manual operation, status indicating lamps, with reputed make contactors, Volt and Amp meters, cables, MCBs etc. Motor control Panel - having required front surface area, fabricated in fully compartmentalized design from CRCA sheet steel of 2mm thick for frame work and covers, 3mm thick for gland plates i/c cleaning and finishing complete with 10 tank spray based tricationic phosphating treatment process for powder coating in approved shade, PU Foam Gasket without manual pasting, joint less (temperature withstand capacity - 40degC to plus 120degC) for maintaining IP protection, power capacitors etc., complete in all respects to the satisfaction of the Engineer-in-Charge.(designed for (2W plus 1SB) 30HP submerged centrifugal LT pump set for clear water with an additional 25% loading margin for safety)2(W) plus 1(S) 30HP each pumps (New) Combined for 3 Nos pumps |
| 12 | Deduct - NS Item- Less credit to existing outlived submersible cable 6mm2 which are not serviceable. |
| 13 | Supplying, Installation, testing and commissioning of SUBMERGED CENTRIFUGAL LT PUMPSET (Power Driven Submersible pumps primarily designed for handling clear water with End Suction Enclosed Impeller and Volute Casing) sets fitted with pump (ANSI 11.6/HSI), pump imperller directly mounted on extended single rigid robust shaft of motor with submerged squirrel cage induction (as per IEC 60034)- air filled totally enclosed (IP68) self frame water cooled (TESWC), Class-F effective motor, mechanical seal, thermal and moisture sensor, suspension device, anti coupling bracket, guide pipe and Cable From Sump Well to Panel in pump Chamber complete in all respects as per scope of work and specification of SUBMERGED CENTRIFUGAL LT PUMPSET of discharge 1900LPM- 138 cum/hr and 40 m head (30HP) |
| 14 | Supply of a multi-compartment LT Indoor panel with A/M change over switch for DG and EB power source, independent feeders for pumps, PLC Control panel with high speed PLC 24V DC redundant power supply and 7` ethernet enabled HMI, Provision for remote access via RJ45/RS485 ports, ready for future SCADA integration system, field instruments, including Pump Monitoring Unit (PMU), UPS, for Pump operation VFD panel with a bypass switch and emergency Star/Delta starter, A/M switch for Auto control from PLC, Push buttons for manual operation, status indicating lamps, with reputed make contactors, Volt and Amp meters, cables, MCBs etc. Motor control Panel - having required front surface area, fabricated in fully compartmentalized design from CRCA sheet steel of 2mm thick for frame work and covers, 3mm thick for gland plates i/c cleaning and finishing complete with 10 tank spray based tricationic phosphating treatment process for powder coating in approved shade, PU Foam Gasket without manual pasting, joint less (temperature withstand capacity - 40degC to plus 120degC) for maintaining IP protection, power capacitors etc., complete in all respects to the satisfaction of the Engineer-in-Charge.(designed for (2W plus 1SB) 35HP submerged centrifugal LT pump sets for clear water with an additional 25% loading margin for safety) 2(W) plus 1(S) 35HP each pumps (New) Combined for 3 Nos pumps |
| 15 | Supplying, Installation, testing and commissioning of SUBMERGED CENTRIFUGAL LT PUMPSET (Power Driven Submersible pumps primarily designed for handling clear water with End Suction Enclosed Impeller and Volute Casing) sets fitted with pump (ANSI 11.6/HSI), pump imperller directly mounted on extended single rigid robust shaft of motor with submerged squirrel cage induction (as per IEC 60034)- air filled totally enclosed (IP68) self frame water cooled (TESWC), Class-F effective motor, mechanical seal, thermal and moisture sensor, suspension device, anti coupling bracket, guide pipe and Cable From Sump Well to Panel in pump Chamber complete in all respects as per scope of work and specification of SUBMERGED CENTRIFUGAL LT PUMPSET of discharge 1650LPM- 99 cum/hr and 40 m head (25HP). |
| 16 | Development of tubewell by Over-pumping unithaving suitable submersible pump for development oftubewell to ensure sand free discharge. All the equipmentincluding POL and labour required for carrying out pumpingtests but not limited to the following shall be arranged by thecontractor at his own cost complete in all respect to thesatisfaction of Engineer-incharge:i) A suitable pump and prime mover (since power is notavailable at the well site).ii) Measuring devices for time, discharge and V-Notch orificemethod water level recorder (digital water meter recorder/steel tape engraved).iii) The contractor shall collected water sample in thepresence of SDE/JE. This water samples should be handedover to PHED for further chemical analysis in Public HealthLab. |
| 17 | Rates From DSR Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) :(As per DSR Rate Note- DSR Rate 3065.60 |
| 18 | CC TV CAMERAS Providing and Installing 8 CCTV Cameras (4 Cameras for STP and 2 Camerasfor MPSand 2 cameras for IPS ) complete as per satisfaction of the Engineer– in- Charge, within 96hours of signing the Agreement along with 90 days recording (DVR), 32 inchLED Screen, 16 Channel DVR at STP Site and 8 Channel DVR at MPS Sitewith connectors, cables, poles and power supply with online real-time outputfacility. The cameras at both the sites i.e. MPS and STP shall be synchronizedat STP site.a) i) At STP and MPS Site- 1 No. PTZ speed dome 360 degree 50X zoomcamera, 3 No. 12 mm lens size, 1 Nos. 3.6mm lens size.b) Make: - CP Plus Internet Protocol minimum 5 MP WDR, Night vision colormode 2.4.2 12 mm very focal with extra IR. CCTV Cameras should be installedand commissioned before starting of the work |
| 19 | SEWERAGE TREATMENT PLANT- a) Design, construction, erection, testing and commissioning of 3.00 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including Landscaping, MCC Panel Room, all other contingent i.e. Electrical, Mechanical, Piping and Instrumentation work with PLC and SCADA arrangement for STP integrated with MPS including furniture and laboratory equipment`s as per detail given in the bid document and following components. b) Supply and installation 2 Nos. fine Screens of suitable size for 2.00 MLD average flow with peak factor of 3. c) 2 No. High Mast of 9 mtr GI Octagonal pole of 4 mm thickness (T=100 mm, B=200mm, Base Plate = 320 x 320 x 20 mm), Window at 500 mm from Base Plate with 6 No. LED suitable size, outdoor type energy efficient lamps on each pole, 20 no. LED outdoor light with 7 m. high GI pole along road / path including all accessories complete in all respect. d) Supply and installation of 1 No. 3.65 m wide Main Gate of MS and 1.25 m. wide wicket gate at STP to the entire satisfaction of Engineer-in-charge. (Total weight not less than 500 kg). e) Providing and installing 2 No. centrifuges (1Working plus 1 Stand bye) including centrifuge feed pump, all fittings, instrumentations, electric panel board etc. as per design complete in all respect including packing dry sludge in 20 Kg. bag and supplying the same in market Kisan Sewa Kendra or as directed by Engineer-in-charge within the lead as pointed at clause 4.4.4 of the DNIT. |
| 20 | ONLINE OUTLET EFFLUENT WATER QUALITY MONITORINGSYSTEM-2...Supply, Installation, Testing, Commissioning, Operation and ComprehensiveAnnual Maintenance of effluent quality monitoring system at 3.00 MLD capacitySTP for online (continuous) measurement of PH, Total SuspendedSolids (TSS), Chemical Oxygen Demand (COD), Biological Oxygen Demand(BOD) by single analyzer with various sensors (spectral measurement in theUV-VIS range 200-720mm) performing reagent and chemical free analysis withautomatic cleaning of censor, signal cables and power cables, local dataacquisition and display of data on continuous basis for up linking the data toCPCB, HSPCB and PHED, TUV approved complete in all respect as perCentral Pollution Control Board (CPCB) guidelines for online continuousmonitoring system for effluents and as contained in scope of work in the DNIT.a) Multi-parameter measuring converter, for connecting up to 18 intelligentsensors Scope including 8 analog inputs / outputs (4 inputs and 4 outputs) (0/4-20Ma), wide- range power supply Optical COD/BOD and TSS probe withspectral processing of the UV-VIS range, for measurement in the outlet /effluent of 3.00 MLD capacity STP with integrated withautomatic cleaning.b) Robust digital pH/ORP sensor for pH/ORP electrodes, with built-in preamplifier and temperature sensor with Automatic Temperature Compensation(ATC) Cable length 100 Meter (minimum).c) Sensor adapter cable for all intelligent sensors, with IP68 water proofconnection to the intelligent Sensor Net system. Cable length 100 meter(minimum)d) Data transfer to CPCB, HSPCB and PHED servers.e) Providing GSM 3G, 4G modem with mobile network connectivity. |
| 21 | ANNEXE BUILDING- Construction of HT / LT Panel room, PLC room, Centrifuge house, blower roomand Lab cum office building including doors, windows and fittings with toiletblock including all Sanitary fittings etc. as per drawings approved by SE at MPSand STP and covered area built up with RCC framed structure and brick workfinished with vitrified glazed tiles flooring, powder coated aluminum frame madewith 10 guage sheet having size 100mm x 45mm for chowkhat, 75mm x 45mmfor door frame and 45mm x 45mm for window frame with 5mm thick glassAIS/Saint Gobain/ Modi Float. |
| 22 | Providing, Supplying, Installation, testing and commissioning of NON CLOG SUBMERSIBLE SEWAGE PUMPSET(Power Driven Submersible pumps primarily designed for handling waste water with End Suction Enclosed Impeller and Volute Casing) sets fitted with effective motor, mechanical seal, thermal and moisture sensor, suspension device, anti coupling bracket, guide pipe and Cable From Sump Well to pump Chamber and Panel including LT PMU auto coupling with integral bend (with auto coupling Pin SS Foundation Bolt Complete with base frame and RCC Foundation) complete in all respects as per scope of work and specification of Non Clog submersible pump set of discharge 1325 LPM and 35m head (20HP). |
| 23 | Providing, Supplying, Installation, testing and commissioning of Air-Cooled ATS (Auto Transformer Starter) Panel with MCCB with rotary handle, 3Nos. Power Contactors (AC3 Duty rated at 60 º AMBIENT), suitable capacity power capacitors, high end electronic relay for UV/OV, SPP, ELR plus CBCT, Ph failure/unbalance, dry run preventor, level controller, A plus ASS, V plus VSS, with selector switch, KWH Meter, LED Indicators for R/Y/B, Motor on/trip, PMU, provision for remote on/off, HRC Fuse-link, DP MCB, PLC, SCADA Compatible, bolted type panel in powder coated finish, shade RAL 7032 with 10 tank process, PU gasket enclosure of 2mm CRCA, mounting plate of 2.5CRCA sheets cable entry from bottom , complete in all respects as per scope of work and specification (designed for a 25 HP non-clog submersible sewage pump set with an additional 10% loading margin for safety) complete in all respect. |
| 24 | Providing lowering cutting jointing and testing RCC pipe class NP3 having inside HDPE lining as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 600mm I/d Pipe.. |
| 25 | Providing and insertion of 710mm O/D,12.5mm thick MS casing pipe ( Fe- 330 grade ) fabricated as per IS:3589 of 2001 from steel plates confirming to IS:2062 including cutting , beveling, grinding and jointing with radio graphically welding of pipe as per IS:1182 and testing complete in all respect. (Make: Jindal, Electrosteel, TATA) (For 710mm O/D,12.5mm thick M.S pipe as per IS code) |
| 26 | Operation and Maintenance of Entire Scope of CBD complete in all respect : Operation and Maintenance (OandM)-cum-Defect Liability Period (DLP) for a period of 06 years after successful completion of trial run, covering all assets under the DNIT/Entire project including tubewells, UGTs, pumping machinery, water supply network, IPS, MPS, STP, all water works, lawns and horticulture areas, all civil structures, mechanical systems, electrical installations, instrumentation, PLC and SCADA systems, transformer, DG sets, control panels and all allied works: the scope includes deployment of skilled manpower, operation of pumps and treatment units, routine and preventive maintenance as per relevant standards, chlorination of water supply system as well as chlorination/disinfection of treated effluent, operation of STP with required chemical dosing and treatment processes, maintaining prescribed water quality and effluent discharge standards, upkeep of lawns and horticulture , provision of all consumables and chemicals, ensuring uninterrupted services, and rectification or replacement of any defects during the OandM/DLP period, with all systems to be maintained in sound and efficient working condition throughout. Note: 1. The contractor shall quote rates for OandM for the entire project, inclusive of all components and activities specified above. 2. The OandM will be charged to Annual maintenance estimates. |
| 27 | MAIN PUMPING STATIONS Design, construction, erection, testing and commissioning of MPS and following components : 1.RCC Inlet chamber, Screen Chamber, rectangular collecting tank suitable for 3.00 MLD average flow with peak factor of 3.00 landscaping of the campus providing and installing of 5 No. Pumping Set of i.e. 1 no. 6300 LPM (504 cum per hour), 2 no. 2100 LPM (168 cum per hour) and 2 no. 1050 LPM (63 cum per hour) with 22 mtr. Head each suitable LT panel equipped with all safety devices, automatic capacitor bank and submersible cable form LT panel to pump sets complete in all respect. 2.K9 DI pipe of suitable dia at MPS including welding and screwing of flanges, ISI marked D.I. fittings, Sluice valves as per requirements even for bye-pass arrangements complete in all respect. 3.3 Nos. CI Gear Operated Sluice Gate with SS Spindle (SS 410) and seats (SS 304) (2 nos. for screen and 1 no. for partition of collecting tank) as per design. 4.Supply and installation of 2 Nos. mechanical coarse screens of minimum length 6 mtr for 3.00 MLD average flow with peak factor of 3.0:- i) The connecting sewer of same diameter and material of construction, laid at adequate depth between existing sewers to newly constructed structures is included in this scope of work. ii) All the infrastructure except construction of staff quarter, and path ways/ roads required to be executed at site to make the MPS functional is included in the scope of work for lump-sump job. iii) All the pumping machinery, panel board, Level sensor etc shall be controlled by PLC and SCADA and shall be synchronized with PLC panels at MPS and STP site through broadband internet facility. iv) The size and quantities of all the above components will be as per approved structural/ Hydraulic / Mechanical/ Electrical design to be approved by Departmental before actual execution of work etc. complete in all respect. |
| 28 | Entire Scope of works of approved CBD complete in all respect. (HSR items) Please Enable Macros to View BoQ information |