| 1 | Demolishing Reinforced cement concrete or reinforced brick work including stacking of materials as per directed by the of Engineer - in -charge.SOR 2022 S.I N0 694 |
| 2 | Dismantling sundries brick work including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet) SOR 2022 S.I N0 692 |
| 3 | Deduct the cost of old bricks S.I N0-1(A) SOR-2020 |
| 4 | Ded the cost of old bricks /batts S.I N0-1(F) SOR-2020 |
| 5 | Cleaning of silt/sludge in foul condition lift upto 30 m distance etc all completed as per direction of engineer in charge . |
| 6 | Cement Concrete with 4 cm guge approved brick ballast, Fine sand & cement in the proportion of 12:6:1 including supply of all matrials, labour, tools and plants etc. required for proper completion of the work. S.I N0-273 SOR-2022 |
| 7 | RCC work with cement, approved coarse sand and 2 cm gauge stone grit in proportions of 1:1.5:3 in slab wall etc excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWG G.I.binding wire and including necessary centering and shuttering etc and supply of all materials, labour and tool & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. But for Slabs (As per S.I.No. 284) SOR-2022 New item |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and Medium Tensile steel bars DSR 2023 ITEM N. 5.22.1 |
| 9 | Earth Work in Embankment (lead upto 8 km) in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m in depth earth work in embenkment to in 20 cm layers including remming and dressing the surface to required levels and slops also including 1.50 m lift and 30 m lead. The earth form cutting to be used in making in embekment or to be disposited and spoil banks with in 30 M. distance as directed by the engineer in charge etc all complete as per the direction of engineer in charge. RMR |
| 10 | M-150 Brick work in 1:4 one cement and four course sand mortar in foundation and plinth Including suppy of all material labour,T&P etc required for proper completion of the work S.I No 305(a) SOR-2022 |
| 11 | S/L 12 mm thcik plaster (1:4) with cement & coarse sand including all materials,labour,tools, & plant etc all completed as per the direction of engineer -in - charge.SOR 2022 S.I N0-584 New item |
| 12 | S/L of 22.4 to 53 mm gauge stone ballast with stacking for measurement etc all complete as per direction of engineer in charge ( As per PWD SOR 2020 RMR) |
| 13 | Consolidation for above stone ballast &gsb including open stacks sorting into three size compacting by 8 tonn road roller including hire fuel charge including required compaction etc all complete as per the direction of engineer in charge.SOR 2022 S.I No-752 |
| 14 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels,bands, plain window sills, staircases and spiral staircases above plinth level up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand incuding manufactured sand derived from Recycled Concrete Aggregate (RCA) upto 20%: 3 graded stone aggregate 20 mm nominal size Recycled Concrete Aggregate (RCA) upto 20%) DSR 2023 ITEM. N. 5.3A |
| 15 | GST Please Enable Macros to View BoQ information |