| 1 | Excavation in foundation in ordinary soil (loam, clay or sand) including lift up to 1.5M and lead up to 50M. and including filling, watering and ramming of the excavated earth into the trenches or into the space between the building and the sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I upto a distance of 50M. from the foundation trenches.(SI NO 251) |
| 2 | Cement concrete with 4cm gauge brick ballast, fine sand of 1.25 FM and cement in proportion of 12:6:1 in foundation & under floors, including supply of all materials, labour & T&P etc. required for proper completion of the work. (SI NO 273) |
| 3 | Providing and laying of cement conrete 1:4:8 (1 cement: 4 fine sand : 8 graded brick aggregte 40 mm nominal size ) including curing, supply of all material, labour, T&P etc complete in all respect required for proper completion of the work. (S.I. No. 273)) |
| 4 | M-150 class brick work in 1:6 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of the work. . (SI NO 303+diff of course sand) |
| 5 | M-150 class brick work in 1:6 cement and coarse sand(2.25 FM) mortar in super structure in one brick thick wall, including necessary cutting and moulding of bricks as required and also including honey comb brick work including supply of all materials, labour and T&P etc. required for proper completion of the work. . (SI NO 310)+ Diff. |
| 6 | M-150 class brick work in 1:4 cement and coarse sand1(.25 FM) mortar in super structure in half brick thick wall, including necessary cutting and moulding of bricks as required and also including honey comb brick work including supply of all materials, labour and T&P etc. required for proper completion of the work. . (SI NO 309 (3)+50 |
| 7 | Supply and fixing of Mild steel Z section openable window with masquto steel jail and beading handel, stay, tower bolt etc and including supply of all materials, labour and T&P etc. required for proper completion of work. SI NO 502 ) |
| 8 | P/L of Plain cement concrete with cement, approved coarse sand and 2cm (3/4\\") gauge approved stone grit in the proportion of 1:2:4 including necessary centering and shuttering etc. and also including supply of all materials labour and T&P etc. required for proper completion of the work. . (SI NO 279 .b) |
| 9 | Providing and fixing glass strips 5.5 mm thick and 35 mm depth in joints of floors.(SlNo.2.f ) hardoi |
| 10 | Scraping old white or colour wash including disposal of refuse as directed by the ingineer-in-charge with in a distance of 60 meters (200 feets) |
| 11 | White cement washing three coats on undercorated wall and ceiling surface to give an even shade including thoroughly brooming the surface to remove all dirt, dust, mortar drop and other foreign matter including supply of all materials labour & T&P etc. required for proper completion of work. (SI NO 673 ) |
| 12 | Dismentlng exiting plaster including disposal of refuse as directed by E/I with in a distance of 60 m. .(SI : 706)Lakhimpur |
| 13 | Antitermite treatment of soil under floors using chemical emulsion @ one litre per hole, 300 mm apart @ 100 Nos Holes per 9.00 Sqm. including drilling 12 mm diameter holes and plugging also to match the floor properly :With Chlorpyriphos / Lindane E.C. 20% with 1 % concentration(SOR 2.35) |
| 14 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 mtr. Lead for thickness of tiles 25 mm and upto 40 mm. |
| 15 | 15 mm CPVC pipe. |
| 16 | Distempering with oil bound distemper two coats of approved brand and manufacture and of required shade on undecorated wall surface to give and even with cement primer of approved brand and manufacture such as berger, J & N Shalimar, Asian paints after thoroughly brushing the surface free from mortar including preparing the surface even with plaster of paris of approved synthetic material and sand papered smooth including cost of all materials. |
| 17 | Making drip course in sunshade or FACIA as per direction as Engineer-In-Charge including supply of all material, labour etc. required for proper completion of work. (DSR 5.30) |
| 18 | Supply and fixing 10 cm. dia C.P jali complete in all respect as per directed LMR |
| 19 | 20 mm CPVC pipe. |
| 20 | Painting or varnishing work in small areas or new wood work withone coat (upto one square metre) ready mixed priming paint and 2 coat of superior quality ready mixed paint or varnish including supply of all materials. Labour tools & plants etc required for proper completion of the work paint to be used should confirm.(SI no 641+642) |
| 21 | Finishing walls with Putty approved brand and manufacture and of required shade on undacorated wall surface to give even shade over including curing and cost of all material, labour, T&P etc. required for proper completion of work. (13.80) |
| 22 | Finishing walls with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undacorated wall surface to give even shade over @ 1.25 Ltr/10sqm including one coat of primer applid @ 0.75Ltr/10sqm coat curing and cost of all material, labour, T&P etc. required for proper completion of work.for two coat. 13.46.1) |
| 23 | Painting two coats over priming coat on new steel or wood surface including priming coat with superior syntheic enamel such as Berger, Asian, Neroluc LUXOL 3,Hi-gloss apcolite superlac, DULUX specified burshing to give an even shade and including cleaning the surface of all dirt, dust and other foreign matter, sand papering and stopping including cost of all materials labour tools and plants etc. required for proper completion of the work. (S.I. No.641+642) |
| 24 | Supply and fixing 150mm dia hexagonal box type fan hook with 12mm dia round bar complete with all materials labour and T&P etc. required for proper completion of work. DAR 10.17 Lko |
| 25 | 6 mm thick plaster in 1:3 cement and approved coarse sand( FM 1.25) mortar in ceiling and soffits of stairs & beams, including supply of all materials, labour and T&P etc. required for proper completion of work. (DSR NO 13.16.1) LKO |
| 26 | 12 M.M thick cement plaster 1:4 cement and coarse sand mortar over brick work icluding supply of all material labour and T&P etc. required for proper completion of the work. below plinth level (DAR-13.4.1) |
| 27 | Filling of carted earth in trenches, plinth and sides of foundation etc. in lavers not exceeding 20cm. in depth consolidating each deposited layer by ramming & watering and dressing and including cartage of earth upto 5.00km and all taxes required for proper completion of the work. . (AOR) |
| 28 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 110 mm diameter (Chapter_ 23 _Item _31) |
| 29 | Supply and fixing of 10cm internal diameter P.V.C.( 6 kg/cm2) down pipes complete with rose head, bends, shoes and gratings and including supply of necessary M.S. clamps 25mm x 3mm size fixed etc. complete.( Lko SOR ) |
| 30 | 20 mm cement plaster in dado and skirting 1:2consisting of one part of cement and 2 part of approved course sand laid in pannels,finished with 3 mm floating coat of neat cement or cement and marble dust in ratio 5:1 including supply of all materials, labour and T&P etc. required for proper completion of work (SI NO.597) |
| 31 | Providing and fixing ball bearing for rolling shutter. (DAR 10.7)Lko |
| 32 | Supply and fixing of 100 mm nihani trap PVC completed in all respect as per directed LMR |
| 33 | 40 mm thick cement concrete flooring 1:2:4 (1 cement : 2 coarse sand: 4 graded stone aggregate of size 12.5 mm and below) finished with floating coat of neat cement with out base concrete including fixing of glass strips. (Excluding cost of glass strips) (SI. 605) |
| 34 | Providing and fixing C.P. brass stop cock (concealed) of standard design and of approved make conforming to IS:8931. 15 mm nominal bore ( Chapter_23_Item_25 |
| 35 | Providing and fixing C.P. brass long nose bib cock of approved quality conforming to IS standards and weighing not less than 810 gms. CH-23 Si No- 23 |
| 36 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceding of 8 Km. from the site of work and including watering, ramming,dressing etc.Rate includes cost of all of all materials, labour and T&P etc. required for proper completion of work.(Including Royalty) . (SI NO 255) |
| 37 | Supply and fixing of panes of glass panes with Atul or equivalent I.S.I. marked quality putty brads and spring complete.Float glass panes thickness 4 mm. thick. (DSR No.14.5.1) |
| 38 | Dismentling of brick work in cement mortar including supply of all materials, labour and tools & plants etc. required for proper completion of the work. |
| 39 | 40 mm thick cement concrete flooring 1:2:4 (1 cement : 2 coarse sand: 4 graded stone aggregate of size 12.5 mm and below) laid over base concrete and finished with floating coat of neat cement with 15 cm thick base concrete 1;6:12 including fixing of glass strips. (Excluding cost of glass strips) (SI.605+273x0.15) |
| 40 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/sqm including pointing the joints with white cement and matching pigment etc., complete |
| 41 | Providing and laying brick bat coba water proofing treatment with minimum thickness of 75mm at Khurra and minimum top slope of 1 in 80 over the existing cleaned R.C.C. roof slab spread with acrylic polymer cement slurry (mixed with acrylic polymer water proofing compounds) laid over the prepared surface a layer of 100mm thick (minimum-ave.) brick bat coba laid over the mortar layer to get required gradient for adequate drainage. The voids between brick bats are to be kept between 15mm to 20mm wide. These joint are to be filled with acrylic cement, finished with 20mm thick acrylic cement mortar 1:4 (1 cement: 4 coarse sand) including giving guarantee of 10 years. Written guarantee on stamp paper testing etc. all complete as per specification, drawing and instructions of engineer-in-charge.(Chap 22 Lko.7.1) |
| 42 | Providing and fixing ISI marked flush door shutters conforming to IS: 2202 (Part I) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched commercial 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters:35 mm thick including ISI marked Stainless Steel butt hinges with necessary |
| 43 | Supply and fixing rolling shutter of approved make made of 80x1.25 mm (3\\"x18 gauge) cold rolled MS lath interlocked throughout their entire length and joined together at the end by end locks and material on specially designed pipe shaft with bracket side guides and arrangement for inside and cut side licking with push and pull operation complete including cost of Providing and fixing 27.50 cm long wire spring grade-II and 1.25 mm thickTop cover. (DAR 10.6.1)Lko |
| 44 | Providing and fixing water closet squatting pan (Indian type W.C. pan) with 100 mm Sand Cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests. (Chapter_24_Item_1) |
| 45 | Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps,32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets,cutting and making good the walls wherever require: White Vitreous China Wash basin size 630x450 mm with a single of 15 mm C. P. brasspillar taps ( Chapter_24_Item_3B) |
| 46 | Providing and fixing white vitreous china flat back half stall urinal of size 580x380x350 mm with white PVC automatic flushing cistern, with fittings, standard size C.P. brass flush pipe, spreaders with unions and clamps (all in C.P. brass) with waste fitting as per IS : 2556, C.I. trap with outlet grating and other couplings in C.P. brass, including painting of fittings and cutting and making good the walls and floors wherever required: Single half stall urinal with 5 litre PVC. automatic flushing cistern (Chapter_24_Item_4A) |
| 47 | Mild steel or iron in plain work such as reinforced cement concrete or reinforced brick work (when not included in an overall rates), wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage, bends, hooks and authorized overlapping shall be measured upto floor two level. (SI NO 504) |
| 48 | Providing and laying in position specified grade of reinforced cement concrete, exculding the cost of centering, shuttering finishing and reinforcement upto plinth level as 1:2:4 (1 Cement: 2 coarse sand: 4 graded aggregate 20mm nominal size. SI 288 |
| 49 | R.C.C. work with cement, approved coarse sand and 2cm (3/4\\") gauge approved stone grit in the proportion of 1:2:4 in lintels of doors & windows excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials labour and T&P etc. required for proper completion of the work. . (SI NO 283) |
| 50 | RCC work with providing and laying in position specified grade of reinforced cement concrete, slab including the cost of centering, shuttering,finishing and exculidng reinforcement as per instructions of Enginner in charge. |
| 51 | R.C.C. work with cement, approved coarse sand and 2cm (3/4\\") gauge approved stone grit in the proportion of 1:2:4 in beam excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials labour and T&P etc. required for proper completion of the work. . (SI NO 285) |
| 52 | R.C.C. work with cement, approved coarse sand and 2cm (3/4\\") gauge approved stone grit in the proportion of 1:1.5:3 in Column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials labour and T&P etc. required for proper completion of the work. . (SI NO 283) |
| 53 | providing and applying tack coat with bitumin emulsion (RS-1)using emulsion distributor at the rate of 0.25kg/sqm on the prepared granular surface treated with primer & cleaned with hydraulic broom as er technical specification clause 503.(Excluding cost of material )(By mechenical means) |
| 54 | providing and applying primer coat with betumin emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of .75kg/sqm using mechenical means as per specification clause 502 (excluding of cost of material ) (By machenical means ) |
| 55 | Extra providing and mixing hardening compound of approved quality as per manufacturers specification in cement concrete.DSR 16.44 |
| 56 | Providing and laying 7.50 cm compacted thickness of stone aggregate of specific sizes 22.4-53 mm of water bound macadam specification incluiding spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 Kn in stage to proper grade and camber applying and brooming stone dust to fill-up the interstices of coarse brooming stone dust to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading-3 as per technical Speicification clause 405 including cost of material, roller, cartage, loading, unloading, labour and all taxes complete or as per direction of Engineer in charge. |
| 57 | Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary including bending for proper completion of the work and excluding the supply of steel and its wastage Bend, hooks and authorized over lapping shall be measured upto floor to level. SI NO 504 |
| 58 | Providing and laying design mix cement concrete of M-30 grade, in roads/ taxi tracks/ run ways, using cement content as per design mix, using coarse sand and graded stone aggregate of 20 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, Cement concrete manufactured in automatic batching plant (RMC plant) i/c transportation to site in transit mixer DSR 16.43.2 |
| 59 | Providing and laying Dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder@ 4.0 to 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor controll to required grade, level and alignment and rolleing with smooth wheeles vibrator and tandem roller to achieve the desired compaction as per MoRT&H specification clauses 507 complete in all respect. |
| 60 | Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder@ 5.40 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor controll to required grade, level and alignment and rolleing with smooth wheeles vibrator and tandem roller to achieve the desired compaction as per MoRT&H specification clauses 509 complete in all respect. |
| 61 | Maintenance cost of 1ndyear @0.00% cost of work ( Item No : 53 to 60) |
| 62 | Maintenance cost of 2ndyear @0.25% cost of work ( Item No : 53 to 60) |
| 63 | Maintenance cost of 3ndyear @0.50% cost of work ( Item No : 53 to 60) |
| 64 | Maintenance cost of 4ndyear @0.75% cost of work ( Item No : 53 to 60) |
| 65 | Maintenance cost of 5ndyear @1.00% cost of work ( Item No : 53 to 60) Please Enable Macros to View BoQ information |