|
| 1 | Safe loading Carriage including unloading and proper stacking of following materials from central store Barabanki / JE Store to site of work. |
| 2 | PCC Pole 8.5 Mtr |
| 3 | 11/0.4 KV VCB for O/G CTR 200/100/5 A. (350 MVA 1250 AMP |
| 4 | Polymeric 11 KV Pin Insulator With NB 45 KN |
| 5 | Top Channel 100x50x2240 mm |
| 6 | T-OFF Channel |
| 7 | Dropper Channel 100x50x2240 mm |
| 8 | M.S Angle 65x65x6 mm |
| 9 | Cross Bracing M.S Angle |
| 10 | G.I. Wire 8 SWG |
| 11 | Earthing Set Complete |
| 12 | Transformer 250 KVA |
| 13 | 11 KV XLPE Cable 3x120 Sq.MM Double Circuit |
| 14 | LT PVC Cable 3.5x400 Sq.MM |
| 15 | LT Single Core Aluminium Cable 1x400 Sq.MM |
| 16 | 11 KV 3x120 sqmm O/D, I/D CJ Kit |
| 17 | 11 KV 3x120 sqmm S/TH CJ Kit |
| 18 | 11 KV Pilfer Metering Cubical |
| 19 | 11 KV CT/PT Unit Pole Mounting Unit 30/5A |
| 20 | ACSR Weasal Conductor |
| 21 | 3 Ph 4W TVM 11 KV Meter |
| 22 | Dragging of pole from JE Dump Store to site |
| 23 | Grouting of Pole |
| 24 | Stringing and sagging of 11 KV line with ACSR Weasal Conductor including nuzzling binding and jumpering (weasal conductor will be provided by the department) |
| 25 | Installation of Mounting of Following capacity of Transformer including its connection between 11 KV and LT Line. |
| 26 | Mounting of 250 KVA Tranformer |
| 27 | Erection of Substation type double pole with PCC 8.5 Mtr. Long including mounting of Top Channal, base angle with clamps with nut & bolt 33/11 KV line. |
| 28 | Earthing of pole with MS Earthing. |
| 29 | Fixing of 11/0.4 KV VCB for O/G CTR 200/100/5 A. (350 MVA 1250 AMP |
| 30 | Fixing of 11 KV 3x120 sqmm O/D, I/D CJ Kit |
| 31 | Fixing of 11 KV 3x120 sqmm S/TH CJ Kit |
| 32 | Fixing of 11 KV Pilfer Metering Cubical |
| 33 | Fixing of 11 KV CT/PT Unit Pole Mounting Unit 30/5A |
| 34 | Providing of various type materials. All materials shall be supplied by the contractor. |
| 35 | Nut & Bolt |
| 36 | Clamp for PCC Pole etc. |
| 37 | GI Pipe 4'' DIA |
| 38 | 3 Phase D.O Fuse Set |
| 39 | Alumminium Lug 400 sqmm |
| 40 | L-Piece |
| 41 | Clamp for Cable etc |
| 42 | Danger Board with Clamp |
| 43 | Construction 11 kv metering cubical Room Size 10\\"x10\\"x12\\" with Suitable Door of MS Sheet Size 6.5\\"x1.5\\", Brick, sand etc |
| 44 | LT Protection Unit Box MCB I/C 250 Amp. 650V with 03 No O/G MCCB with Busbar 900x50x6 mm L&T make out door type with Plinth Contruction. |
| 45 | Laying of LT Single Core Aluminium Cable 1x400 Sq.MM |
| 46 | Laying of LT PVC Cable 3.5x400 Sq.MM |
| 47 | Laying of 11 kv XLPE Cable AL. 3x120Sq.MM By Manually |
| 48 | Testing of XLPE Cable all size. |
| 49 | Hosting of Cable all size. |
| 50 | Erection of pipe type earthng for DT with the help of B-Class G.I pipe of size 1.5 inch dia, 40 feet deep boring by providing G.I strip 50x6 MM, 6 meter long attached with clamp L-piece nut & bolt & G.I cap |
| 51 | Construction of retaining wall, fabrication & erection of Wiremesh fancing of size {2x(5+3)}x2 M height around Transformer and with retaining wall & 1 no. gate with locking arrangement made of MS Angle iron of size 35×35×5 mm jointed with nuts and bolts. The panel must be supported with MS Glat of size 50×6 mm. Wirremesh of size 10 SWG rectangle type, its painting as per norms of RESSPO. (All the material will be arranged by the contractor at his own cost). |
| 52 | Construction of masonry type transformer plinth of size 1.5×1.5×1.5 M with brick, cement, Coarse sand, sand & brick ballast, filling of sand in the hollow space, plastering outer surface in ratio 1:4:6 top of the plinth 4” thickness grouting of 2 nos. MS Channel of size 100×50×200 mm on the top of the plinth for placement of transformer. (All the material will be arranged by the contractor) |
| 53 | Other line work Please Enable Macros to View BoQ information |