| 1 | Carriage of PCC Pole 8.5 mtr long From ESC, Sitapur to Dump site |
| 2 | Carriage of ST Pole 11 mtr long From ESC, Sitapur to Dump Site |
| 3 | Carriage of ASCR Weaseal Conductor From ESC, Sitapur to Dump Site |
| 4 | Carriage of AB Cable & XLPE Cable From ESC, Sitapur to Dump Site |
| 5 | Carriage of 25/63/100 KVA Transformer From ESC, Sitapur to work site |
| 6 | Carriage of other line material From ESC, Sitapur to dump Site |
| 7 | Carriage of Metering Cubical From ESC, Sitapur to Work Site |
| 8 | Carriage and Mounting of CT PT Unit From ESC, Sitapur to Work Site |
| 9 | Shifting of PCC Pole 8.5 mtr long From Dump site to work site |
| 10 | Shifting of ST Pole 11mtr long From Dump site to work site |
| 11 | Shifting of ASCR Weaseal Conductor From Dump site to Work Site |
| 12 | Shifting of AB Cable & XLPE Cable From Dump site to Work Site |
| 13 | Shifting of other Line material from Dump site to Work site |
| 14 | Fabrication & erection of single pole for 11 KV line on PCC/STP 8.5/11mtr long Pole with fixing of necessary clamp & other acessories like Channel, cross arm, , Fbracket, etc(Clamp ,Nut bolt Provided by contractor .as per RESPO norms. ( Digram as per tender specification) |
| 15 | S/S Type Double Pole- Fabrication, erection, of double pole FOR TRANSFORMER on 8.5/11 M long PCC/ST pole with fixing of necessary clamps & other accessories like disc insulator, top channel 65×65 mm - 2.8M, Dropper Channel TRANSFORMER BASE ANGLE, ,jumpering by PG clamp etc ( E Bracket ,Clamps, Nut Bolt & Guy Insulator etc material arranged by contractor).as per RESPO norms |
| 16 | Fabrication of Top, T-off, Dropper channel etc |
| 17 | Laying of ACSR Weaseal conductor 3 phase 3 wire |
| 18 | Laying of XLPE Cable |
| 19 | Laying Stringing & Sagging of ABC CABLE off Diferent Size as per RESPO Norms(material arranged by contractor Eye Huk Lt clamp, Suspension clamp,Ded End Clamp, Nut Bolt).as per RESPO norms. |
| 20 | Mounting of 25/63/100 KVA T/F |
| 21 | Well type Earthing |
| 22 | Fixing of Metering Cubical |
| 23 | Fixing and Mounting of CT PT Unit |
| 24 | Earthing of PCC/ST Pole |
| 25 | Fixing of Stay With (Clamps, Nut Bolt & Guy Insulator etc material arranged by contractor).as per RESPO norms |
| 26 | Making T-off arrnagement |
| 27 | Gaurding of Line (Guarding Angle,Clamps, Nut Bolt etc material arranged by contractor).as per RESPO norms |
| 28 | Grouting of pole in depth of 1/6 the length of pole in ratio 1:4:8 in cement sand and brick balast as per RESPO norms. |
| 29 | Construction of pole plinth 300mm x 450 mm above ground level in 1:2:4 in cement, coarse sand and stone gritt as per RESPO norms. |
| 30 | Grouting of Stay |
| 31 | Safe Carriage of Loading & Un Loading Scrap/used line material From work site to JE Store/ESC, Sitapur |
| 32 | Supply & erection C Type Panal with2No 7 fit Angla, Lug, Nut Bolt (All material provided by contractor) |
| 33 | Hosting of Cable At DP/Singal Pole With G I Pipe (All material provided by contractor) Please Enable Macros to View BoQ information |