| 1 | Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in charge, normal dewatering, excluding backfilling, etc. complete by all means. (Bd-A-6/259) |
| 2 | Excavation in earth soil ll types |
| 3 | Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 /14151/12786/13488 with nesessary jointing material like mechanical connector i. e. thread /insert joint/quick release coupler joint /compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading/unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOM in all respect etc. complete.Not :- H.D.P.E. Pipes shall be as per latest IS Specifications Also HDPE pipes upto 110 mm Dia shall be in coil form. |
| 4 | 160 mm (12.50 kg / sqm.) |
| 5 | Lowering, Laying and Jointing H. D.P. E. / M. D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 part II 160 mm (12.50 kg / sqm.) |
| 6 | 110 mm |
| 7 | FABRICATION OF M.S. PIPES & SPECIALS Providing, fabricating and fixing expansion joints for pipelines as per the drawing. The rate to include machining the strakes and steel ring as shown in the drawing and welding on either automatic welding machine or manually, Rate includes plates and flats required for expansion joint and all other materials such as synthetic rubber, rubber ring, etc. including packing as per specifications, grease, bolts and nuts, local handling, excluding GST levied by GOI & GOM in all respect etc. complete |
| 8 | Providing double flange sluice valveconfirming for IS-14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete 150 mm dia |
| 9 | 100 mm dia |
| 10 | Valve Chamber with Precast RCC Covers Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast RCC frame and cover, etc. complete as directed by Engineer-in-charge. As above of 90 x 90 cm internal size and depth upto 1.2 M with precast R.C.C slab. |
| 11 | Hydraulic testing of H. D. P. E./M. D. P. E. pipe line to specified pressure including cost of all materials and labour and water for testing for specified length including cutting, placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting, if necessary and reinstating to originalposition..160 mm dia |
| 12 | 100 mm dia |
| 13 | Providing and filling in sand boxing in pipeline or for foundation with sand of approved quality including watering and compaction, etc. complete. (Bd-A-13/264) |
| 14 | Refilling the strenches with available excavated stuff |
| 15 | READY MIX CONCRETE Providing and laying in situ Ready Mix_Cement Concrete grade of trap /granite /_quartzite / gneiss metal for RCC works in_foundation like raft, grillage, strip foundation and footing of RCC column and_steel stanchions including normal_dewatering, form work, compaction,_finishing and curing including transporting from mixing plant upto distance of 25 km., pouring the concrete at work site for 1.5 M lift above G.L. and 5.0 M lift below G.L., etc. complete. for foundation in rcc m-150 |
| 16 | Royalty for sand Please Enable Macros to View BoQ information |