Name of Work:- सम्पर्क मार्ग छिबरामऊ से लडैता तक मरम्मत/नवीनीकरण का कार्य (लं0 0.50 किमी0)
Sl. No.
Item Description
1
Providing, laying , spreading and compacting 22.4-53 mm stone aggregates of specific size to water bound macadam specification including spreading in uniform thickness, hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying brooming stone screening/binding materials to fill up the interstices of coarse aggregate watering and compacting to the required density grading 2 as per Technical specification clause 405.
2
Excavation in foundation trenches in ordinary soil( loam, clay or sand ) I/C ligt up tol. 50m lead up to 30m & I/C filling, watering & ramming of excavation earth in to trenches or in to the space between trenches or in to the plinth and removal and disposal of Surplus earth as diverted by the engineer in charge up to a distance of 30m from the foundation trenches.(251)
3
Providing & laying 1:6:12 ( 1 cement : 6 coarse sand : 12 graded brick aggregate 40mm) in position cement concrete. Ch 5 Si No 1(273)
4
M-150 class brick work in 1:4 cement &coarse sand Mortar in foundation and plinth including supply of all material labour, tools and plants required for proper completion of work ch 6 Si No 6.1.1 page No 41
5
Cement concreate in 1:2:4 etc supply of all material labour T&P etc required for proper completion of work Ch 5 Si No 4.1.3
6
Providing and Laying of interlocking concrete block pavement having thickness 80mm as per drawings and techical specification Clause 1504(Excluslve G.S.B)Mord 1500(6.7)
7
Maintenance of bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc.restoration of rain cuts and dressing of side slop standing tree at adjacent to road wherever cutting of branches of tree, shurb and trimming of grass and weeds etc mentioned in GO No. 55 12022/187/23-9-2022-02 Nabard / 2021 Dt 28.04.20022 & Enc lettere no 14 BDD-1 (NH)/40 MT-11/ 2024dated 03.01.2024 subjected to approval from Govt. Maintence of Ist year after completion of work @ Zero % of total work amount of Maintainance of first Year (@ 0.00% of Total Work Amount of PC Area)
8
Maintainance of 4 th Year Total work amount of Interlocking Work
9
Maintainance of 5 th Year Total work amount of Interlocking Work Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.