| 1 | Dismentling old existing C.C road. including supply of all material,labour and T&P etc.required for proper completion of work |
| 2 | Disposal of refusse dismantled material up to .3 km. |
| 3 | Dismentling of old and damage drain brick work including supply of all material,labour and T&P etc.required for proper completion of work |
| 4 | Deduction of old and workable brick 40% of item no-3 |
| 5 | Breaking of old brick bets for 4cm guage brick ballast 60% 0f item no-3 |
| 6 | Deduction cost of old brick ballast as per item no-4 |
| 7 | Concrete in 1:4:8 with cement,fine sand and Stone ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work. |
| 8 | M-150 brick work in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work. |
| 9 | 12mm thick Plaster in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work. |
| 10 | 1\\" thick P.C.C in 1:2:4 with cement,coarse sand and stone grit of 2cm guage including supply of all material,labour and T&P etc.required for proper completion of work |
| 11 | WBM Grading 3 (22.4-53 mm Stone ballast) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 12 | WBM Grading 3 (22.4-53 mm Stone ballast) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 13 | Construction of Un-renforced,dowel joint at expension and construction joint only plain cement conrete pavement thickness as per designm over a prepared sub base, with 43 grade cement or any other as per clouse 1501.2.2 M-30 (Grae) coarse and fine Aggregates comfirmng to IS:383 maximum size of coarse aggregate not exeeding 25 mm mixed in a concrete mixer of not less than 0.20 cum capacity and appropriat weight batcher using approved mix design. i/c All Completion of work. |
| 14 | R.C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labour and T&P etc.required for proper completion of work |
| 15 | Supply and fixing of mild steel bars for RCC work and angle for channel including supply of all material,labour and T&P etc.required for proper completion of work. Please Enable Macros to View BoQ information |