| 1 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the Engineer-in-charge upto al distance of 30 M. from the foundation trenches. (Where machine can not reach/move).PWD SOR 2022 4.1.1 |
| 2 | Desposal of refused material/malwa distance up to 8 km etc all complete as the direction of engineer in charge. (AS PER PWD SOR 2020 /231(a). |
| 3 | S/L P:C:C (1:6:12) with 40 mm gauge brick ballast fine sand of 1.25 f.m and cement in foundation and under floor including all materials, labour, 3 tools, & plant etc all completed as per the direction of engineer-in-charge. (AS PER PWD SOR 2022 PAGE NO 18 SI NO 5.01 ITEM NO 273 |
| 4 | First class Brick Work in (1:4) cement & four coarse sand 2.20 F.M. morter in foundation and plinth and T&P etc all completed as per the direction of engineer-in-charge. (AS PER PWD SOR 2022 PAGE NO 20 SI NO 6.05 ITEM NO 305 (a) |
| 5 | 12 mm thick plaster with cement and coarse sand of1.25 fineness modules in (1:4) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, tools 5. & plant etc required for proper completion of the work. (AS PER PWD SOR 2022 PAGE NO 36 SI NO 13.11 NEW |
| 6 | Providing wall putty on new surface with approved quality material of Berger/J.K./Birla or 6. similar make 2 coats. AS PER PWD SOR 2022 662 NEW ITEM. |
| 7 | Fihishing wall with weather coat by premium acrylic exterior paint applied @ 3.28 Itr/10 sqm qu or Berger Brand) of approved make and ly on wall with two or more coat to give an even shade including a priming coat with cement primer of approved brand and manufacturer exterior primer applied 2.20kg/10 sqm after thoroughly brushing the surface free from mortar dropping and other foreign matters and sand papered smooth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. AS PER PWD SOR 2022 662 NEW ITEM |
| 8 | Painting or varnishing work in small areas or new wood work with one coat (upto one square metre of ready mixed priming paint and one coat of approved superior quality ready mixed paint or varnish including supply of all 8 materials, labour, Tools & plants etc. required for proper completion of the work. Paint to be used should confirm the Si no. 103-1950. As in item (641) above but for every coat after first coat. |
| 9 | M.S. or iron work of small sizes and section such as holding down bolts, hold fast, tie rods grating etc. wrought to required from including supply of steel bolts, nuts wastage etc. and their fixing required for proper completion of the work PWD SOR 2022.10.21 |
| 10 | Dimantling brick work or stone work in lime or cement mortar and including stacking of 10 materials as directed be the Engineer-in-charge within a distance of 50 meter (200 feet). PWD SOR 2022 17:2.2 |
| 11 | Dismantling reinforced cement concrete or reinforced brick work including stacking of 11 materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet), PWD SOR 2022 17.3 |
| 12 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the 12 sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the Engineer-in-charge upto a distance of 30 M, from the foundation trenches. (Where machine can not PWD SOR 2022/4 1.1 |
| 13 | Desposal of refused material/malwa distance up to 8 km etc all complete as the direction of 12. engineer in charge. (AS PER PWD SOR 2020 /231 a |
| 14 | S/L P:C:C (1:6:12) with 40 mm gauge brick ballast fine sand of 1.25 f.m and cement in foration and under floor including all materials, labour, tools, & plant etc all completed as per the direction of engineer-in-charge. (AS PER PWD SOR 2022 PAGE NO 18 SI NO 5.01 ITEM NO 273 ) |
| 15 | First class Brick Work in (1:4) cement & four coarse sand 2.20 F.M. morter in foundation and plinth and T&P etc all completed as per the direction of engineer-in-charge. (AS PER PWD SOR 2022 PAGE NO 20 SI NO 6.05 ITEM NO 305 (a) |
| 16 | 12 mm thick plaster with cement and coarse sand of1.25 fineness modules in (1:4) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, tools & plant etc required for proper completion of the work. (AS PER PWO SOR 2022 PAGE NO 36 SI NO 13.11 NEW |
| 17 | Earth Work in Embankment (lead upto 8 km) in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m in depth earth work in embenkment to in 20 cm layers including remming and dressing the surface to required levels and slops also including 1.50 m lift and 30 m lead. The earth form cutting to be used in making in embekment or to be disposited and spoil banks with in 30 (AS PER PWD SOR 2022/231(a)+253 (a) SINO-4.03. |
| 18 | S/L of stone ballast 22.4 to 53 mm size with Stacking for measurment etc all complete as per 18 the direction of engineer in-charge. AS PER PWD SOR 2020 RMB |
| 19 | Supply of screening material with stacking for measurment etc all complete as per the 19 direction of engineer in-charge AS PER PWD SOR 2020 RMR |
| 20 | Consolidation of stone aggregates of 45-63 mm/22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable 20 screening to fill-up the interstices of coarse Jaggregate, watering and compacting to the required density Grading 2/3 as per Technical Specification Clause 405. AS PER PWD SOR 2027 20.2.1 |
| 21 | Supply & laying 80 mm thick Precase cernent concrete ishape interlacking paver block (Grey color) with top layer of minimum 8 mm 21 thickness having plan dimension |
| 22 | WALL SCEENARY ETC all complete as per the direction of engineer in-charge |
| 23 | S/L C:C (1:2:4) with 20 mm stone grit, coarse sand & cement etc all complete as the direction 20. of engineer in charge. (AS PER PWD SOR 2022 279 (a). |
| 24 | Less old brick |
| 25 | Less Old Brick BAT |
| 26 | GST Please Enable Macros to View BoQ information |