Sales : +91-777 804 8217
| Sl. No. | Item Title | Item Description |
| 1 | Single Tier Bunks (new). Size : 2000x650 MM Old item to be removed, Provision and fitment of new CRCA powder coated single tier bunk with mattresses , Storage arrangement at bottom, bunk light, bunk fan, magazine pouch, bunk curtains, fall guard. Bunk lights & switches to be Dipole. Separate switches for lights and sockets. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Bunk and drawers load test of 100kgs and 50kgs. Three stiffeners for bunk plank. | Single Tier Bunks (new). Size : 2000x650 MM Old item to be removed, Provision and fitment of new CRCA powder coated single tier bunk with mattresses , Storage arrangement at bottom, bunk light, bunk fan, magazine pouch, bunk curtains, fall guard. Bunk lights & switches to be Dipole. Separate switches for lights and sockets. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Bunk and drawers load test of 100kgs and 50kgs. Three stiffeners for bunk plank. |
| 2 | 02 Tier Bunks cum Sofa : Dimension : 2000x650x1900mm Job description: - Old item to be removed, Provision and fitment of new Cantilever type bunks cum sofa with provision of back resting cushion, each bunk is to be provided with mattresses, a reading light, 230 V power socket, privacy screens , bunk fan, newspaper / magazine holder, bottle holder, name tag plate, ladder. Height of upper bunk should be 1400mm from floor. Mattresses to be made of 32-40 kg /m3 upholstered with removable FR treated fabric, bonding strap with Velcro and buckle. The bunk to be provided with four drawers below (Size – 740x210x1400 mm (02 per bunk) of 1.2 mm thick sheet and drawers should have snap shut arrangement for locking. Cabling/wiring work for all electrical equipment like fan, sockets and light etc also to be undertaken. Removal of existing bunk & locker to be undertaken. Material Specification: CRCA Steel, IS 513D, Thickness 1.2 mm, Powder coated to archive 1000hrs salt spray test. | 02 Tier Bunks cum Sofa : Dimension : 2000x650x1900mm Job description: - Old item to be removed, Provision and fitment of new Cantilever type bunks cum sofa with provision of back resting cushion, each bunk is to be provided with mattresses, a reading light, 230 V power socket, privacy screens , bunk fan, newspaper / magazine holder, bottle holder, name tag plate, ladder. Height of upper bunk should be 1400mm from floor. Mattresses to be made of 32-40 kg /m3 upholstered with removable FR treated fabric, bonding strap with Velcro and buckle. The bunk to be provided with four drawers below (Size – 740x210x1400 mm (02 per bunk) of 1.2 mm thick sheet and drawers should have snap shut arrangement for locking. Cabling/wiring work for all electrical equipment like fan, sockets and light etc also to be undertaken. Removal of existing bunk & locker to be undertaken. Material Specification: CRCA Steel, IS 513D, Thickness 1.2 mm, Powder coated to archive 1000hrs salt spray test. |
| 3 | 03 Tier Bunks: Dimension : 2000x700x2000 mm Job description: - Old item to be removed, Provision and fitment of new Cantilever type bunks cum sofa with provision of back resting cushion, each bunk is to be provided with mattresses, a reading light, 230 V power socket, privacy screens , bunk fan, newspaper / magazine holder, bottle holder, name tag plate, ladder. Height of upper bunk should be 1400mm from floor. Mattresses to be made of 32-40 kg /m3 upholstered with removable FR treated fabric, bonding strap with Velcro and buckle. The bunk to be provided with four drawers below (Size – 740x210x1400 (03 per Bunk) of 1.2 mm thick sheet and drawers should have snap shut arrangement for locking. Cabling/wiring work for all electrical equipment like fan, sockets and light etc also to be undertaken. Removal of existing bunk & locker to be undertaken. Material Specification: CRCA Steel, IS 513D, Thickness 1.2 mm, Powder coated to archive 1000hrs salt spray test. | 03 Tier Bunks: Dimension : 2000x700x2000 mm Job description: - Old item to be removed, Provision and fitment of new Cantilever type bunks cum sofa with provision of back resting cushion, each bunk is to be provided with mattresses, a reading light, 230 V power socket, privacy screens , bunk fan, newspaper / magazine holder, bottle holder, name tag plate, ladder. Height of upper bunk should be 1400mm from floor. Mattresses to be made of 32-40 kg /m3 upholstered with removable FR treated fabric, bonding strap with Velcro and buckle. The bunk to be provided with four drawers below (Size – 740x210x1400 (03 per Bunk) of 1.2 mm thick sheet and drawers should have snap shut arrangement for locking. Cabling/wiring work for all electrical equipment like fan, sockets and light etc also to be undertaken. Removal of existing bunk & locker to be undertaken. Material Specification: CRCA Steel, IS 513D, Thickness 1.2 mm, Powder coated to archive 1000hrs salt spray test. |
| 4 | Wardrobe locker (New). Provision and fitment of CRCA powder coated item with locking arrangements and associated fittings. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Drawer/shelfs load test of 50kgs | Wardrobe locker (New). Provision and fitment of CRCA powder coated item with locking arrangements and associated fittings. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Drawer/shelfs load test of 50kgs |
| 5 | Working Table (new). Old item to be removed, Provision and fitment of new CRCA powder coated table with drawers, locking arrangements and computer securing arrangements. Drawers load test of 20 kgs. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC /policy / H-21 / Equipment dated 05 Apr 17. Locks test certificate. Drawer load test of 20kgs. | Working Table (new). Old item to be removed, Provision and fitment of new CRCA powder coated table with drawers, locking arrangements and computer securing arrangements. Drawers load test of 20 kgs. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC /policy / H-21 / Equipment dated 05 Apr 17. Locks test certificate. Drawer load test of 20kgs. |
| 6 | Executive chairs (new). Old item to be removed, Provision and Fitment of new Executive chair with cloth cover and arm rests. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. FR Cloth certificate to be submitted. | Executive chairs (new). Old item to be removed, Provision and Fitment of new Executive chair with cloth cover and arm rests. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. FR Cloth certificate to be submitted. |
| 7 | Non-Executive chairs (new).Old item to be removed, Provision and Fitment of new Non-executive chair with cloth cover and arm rests. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. FR Cloth certificate to be submitted. | Non-Executive chairs (new).Old item to be removed, Provision and Fitment of new Non-executive chair with cloth cover and arm rests. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. FR Cloth certificate to be submitted. |
| 8 | Folding chair (new). Old item to be removed, Provision and Fitment of new SS foldable chairs with cushion. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Folding chair (new). Old item to be removed, Provision and Fitment of new SS foldable chairs with cushion. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 9 | Wash Basin with cabinet (new). Old item to be removed, Provision and fitment of new SS cabinet with SS wash basin, toiletry rack, storage drawer, towel hanger. Necessary arrangements be provided along with FW tank with SS mirror, taps, pipelines and plumping works. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. plumbing press fit, Cu.Ni pipelines pressure test certificate | Wash Basin with cabinet (new). Old item to be removed, Provision and fitment of new SS cabinet with SS wash basin, toiletry rack, storage drawer, towel hanger. Necessary arrangements be provided along with FW tank with SS mirror, taps, pipelines and plumping works. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. plumbing press fit, Cu.Ni pipelines pressure test certificate |
| 10 | Towel Hanger (new). Old item to be removed, Provision and fitment of SS towel hanger rods. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Towel Hanger (new). Old item to be removed, Provision and fitment of SS towel hanger rods. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 11 | Cloth Hook (new). Provision and fitment of new SS double hooks. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Cloth Hook (new). Provision and fitment of new SS double hooks. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 12 | NWT Door (new). Old item to be removed, Provision and fitment of new NWT Door with lock, emergency escape, handles and bulkhead frame double skin CRCA powder coated with 7 lever mortise lock, Door closure and other associated fittings. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Certificate for lock and door closure | NWT Door (new). Old item to be removed, Provision and fitment of new NWT Door with lock, emergency escape, handles and bulkhead frame double skin CRCA powder coated with 7 lever mortise lock, Door closure and other associated fittings. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Certificate for lock and door closure |
| 13 | File Cabinet (new).Old item to be removed, Provision and fitment of new CRCA powder coated file cabinet with lock and sliding door. Approx. dimensions 900 x 300 x 350 mm. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Certificate for lock, Cabinet load test of 50kgs. | File Cabinet (new).Old item to be removed, Provision and fitment of new CRCA powder coated file cabinet with lock and sliding door. Approx. dimensions 900 x 300 x 350 mm. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Certificate for lock, Cabinet load test of 50kgs. |
| 14 | Shoe Rack (new).Old item to be removed, Provision and fitment of new CRCA powder coated 12 pair shoe racks with latching arrangement, holes for ventilation. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Shoe Rack (new).Old item to be removed, Provision and fitment of new CRCA powder coated 12 pair shoe racks with latching arrangement, holes for ventilation. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 15 | SS mirrors (new).Old item to be removed, Provision and fitment of new mirrors SS 304 finish with frame. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | SS mirrors (new).Old item to be removed, Provision and fitment of new mirrors SS 304 finish with frame. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 16 | Sofa Single Seater (new).Old item to be removed, Provision and fitment of new single seater Sofa with required fittings and securing arrangements.Mat: CRCA Powder coated, FR Seat cover Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs | Sofa Single Seater (new).Old item to be removed, Provision and fitment of new single seater Sofa with required fittings and securing arrangements.Mat: CRCA Powder coated, FR Seat cover Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs |
| 17 | Sofa 2Seater (new).Old item to be removed, Provision and fitment of new two seater Sofa with required fittings and securing arrangements Mat: CRCA Powder coated, FR Seat cover Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs | Sofa 2Seater (new).Old item to be removed, Provision and fitment of new two seater Sofa with required fittings and securing arrangements Mat: CRCA Powder coated, FR Seat cover Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs |
| 18 | Sofa 3Seater (new).Old item to be removed, Provision and fitment of new three seater Sofa with required fittings and securing arrangements Mat: CRCA Powder coated, FR Seat cover Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs | Sofa 3Seater (new).Old item to be removed, Provision and fitment of new three seater Sofa with required fittings and securing arrangements Mat: CRCA Powder coated, FR Seat cover Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs |
| 19 | Sofa 4 Seater (new).Old item to be removed, Provision and fitment of new four seater Sofa with required fittings and securing arrangements Mat: CRCA Powder coated, FR Seat cover Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs | Sofa 4 Seater (new).Old item to be removed, Provision and fitment of new four seater Sofa with required fittings and securing arrangements Mat: CRCA Powder coated, FR Seat cover Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs |
| 20 | Sofa 5 Seater (new).Old item to be removed, Provision and fitment of new Five seater Sofa with required fittings and securing arrangements Mat: CRCA Powder coated, FR Seat cover Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs | Sofa 5 Seater (new).Old item to be removed, Provision and fitment of new Five seater Sofa with required fittings and securing arrangements Mat: CRCA Powder coated, FR Seat cover Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs |
| 21 | Sofa 6 Seater (new).Old item to be removed, Provision and fitment of new six seater Sofa with required fittings and securing arrangements Mat: CRCA Powder coated, FR Seat cover. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs | Sofa 6 Seater (new).Old item to be removed, Provision and fitment of new six seater Sofa with required fittings and securing arrangements Mat: CRCA Powder coated, FR Seat cover. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs |
| 22 | Sofa 7 Seater (new).Old item to be removed, Provision and fitment of new seven seater Sofa with required fittings and securing arrangements Mat: CRCA Powder coated, FR Seat cover Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs | Sofa 7 Seater (new).Old item to be removed, Provision and fitment of new seven seater Sofa with required fittings and securing arrangements Mat: CRCA Powder coated, FR Seat cover Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs |
| 23 | CRCA Panelling (New).Old item to be removed, Provision and fitment of new CRCA powder coated panels with required inspection windows and cut puts for switches, lights, sockets etc. Design as finalised by ship staff. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Material certificate, batch no., Make etc. | CRCA Panelling (New).Old item to be removed, Provision and fitment of new CRCA powder coated panels with required inspection windows and cut puts for switches, lights, sockets etc. Design as finalised by ship staff. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Material certificate, batch no., Make etc. |
| 24 | Bar counter (New).Old item to be removed, Provision and fitment of new bar counter made of CRCA/FR material. Design to be confirmed from SS. Bar counter should have lockers below, drawers, glass cabinets, glass holders, glass hangers, show lights for bar, 06 in nos chairs etc. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. drawers load test and locks to be cycle test certificate | Bar counter (New).Old item to be removed, Provision and fitment of new bar counter made of CRCA/FR material. Design to be confirmed from SS. Bar counter should have lockers below, drawers, glass cabinets, glass holders, glass hangers, show lights for bar, 06 in nos chairs etc. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. drawers load test and locks to be cycle test certificate |
| 25 | Chart table (New).Old item to be removed, Provision and provision and fitment of new CRCA power coated tables with stowage arrangement at bottom. Approx. dimensions: 250x200x150 cm. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Drawers load test of 50 kgs, Locks cycles certificate. | Chart table (New).Old item to be removed, Provision and provision and fitment of new CRCA power coated tables with stowage arrangement at bottom. Approx. dimensions: 250x200x150 cm. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Drawers load test of 50 kgs, Locks cycles certificate. |
| 26 | Kit Locker (New).Old item to be removed, Provision and fitment of CRCA powder coated kit locker with door and handle. Approx. dimensions 450 x 300 x 300 mm. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Drawers/selfs load test of 50kgs. | Kit Locker (New).Old item to be removed, Provision and fitment of CRCA powder coated kit locker with door and handle. Approx. dimensions 450 x 300 x 300 mm. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Drawers/selfs load test of 50kgs. |
| 27 | Teapoy (New).Old item to be removed, Provision and fitment of new CRCA powder coated tepoy with storage and locker at bottom. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Load test for storage channel | Teapoy (New).Old item to be removed, Provision and fitment of new CRCA powder coated tepoy with storage and locker at bottom. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Load test for storage channel |
| 28 | Book Shelf (New).Old item to be removed, Provision and fitment of new CRCA powder coated book shelf with locking arrangement. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21/Equipment dated 05 Apr 17. Certificate for locks, Shelf load test of 50kgs. | Book Shelf (New).Old item to be removed, Provision and fitment of new CRCA powder coated book shelf with locking arrangement. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21/Equipment dated 05 Apr 17. Certificate for locks, Shelf load test of 50kgs. |
| 29 | Entertainment centre (New).Old item to be removed, Provision and fitment of new CRCA powder coated item with locking arrangement and associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. certificate for locks | Entertainment centre (New).Old item to be removed, Provision and fitment of new CRCA powder coated item with locking arrangement and associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. certificate for locks |
| 30 | Dining table (New).Old item to be removed, Provision and fitment of new SS/CRCA powder coated item with locking arrangement and associated fittings (Size: 2000 x 800 x 800mm). Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21/ Equipment dated 05 Apr 17. | Dining table (New).Old item to be removed, Provision and fitment of new SS/CRCA powder coated item with locking arrangement and associated fittings (Size: 2000 x 800 x 800mm). Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21/ Equipment dated 05 Apr 17. |
| 31 | Dining Chair (New).Old item to be removed, Provision and fitment of new CRCA powder coated item with locking arrangement and associated fittings. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Dining Chair (New).Old item to be removed, Provision and fitment of new CRCA powder coated item with locking arrangement and associated fittings. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 32 | CO Executive Chair (New). Old item to be removed, Provision and fitment of new item with hand rest, back rest, adjustable height, locking arrangement and associated fittings.Firm to land the removed items at dockyard scrapyard by their own transport. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | CO Executive Chair (New). Old item to be removed, Provision and fitment of new item with hand rest, back rest, adjustable height, locking arrangement and associated fittings.Firm to land the removed items at dockyard scrapyard by their own transport. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 33 | Working table for CO (New). Provision and fitment of new item with wooden finish locking arrangement and associated fittings.Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Certificate for locks, drawers/ self load test of 20 kgs | Working table for CO (New). Provision and fitment of new item with wooden finish locking arrangement and associated fittings.Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Certificate for locks, drawers/ self load test of 20 kgs |
| 34 | Bridge CO Chair (New). Old item to be removed, Provision and fitment of new fixed chair with hand rest, back rest, height adjustable, revolving, locking arrangement and associated fittings. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Bridge CO Chair (New). Old item to be removed, Provision and fitment of new fixed chair with hand rest, back rest, height adjustable, revolving, locking arrangement and associated fittings. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 35 | QM Chair (New).Old item to be removed, Provision and fitment of new fixed chair with hand rest, back rest, height adjustable, locking arrangement and associated fittings. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | QM Chair (New).Old item to be removed, Provision and fitment of new fixed chair with hand rest, back rest, height adjustable, locking arrangement and associated fittings. Firm to land the removed items at dockyard scrapyard by their own transport. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 36 | Cap & Coat hook (New).Provision and fitment of new SS/CRCA powder coated item with locking arrangement and associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Cap & Coat hook (New).Provision and fitment of new SS/CRCA powder coated item with locking arrangement and associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 37 | Digital wall clock (New).Provision and fitment of new reputed make item with locking arrangement and associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Digital wall clock (New).Provision and fitment of new reputed make item with locking arrangement and associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 38 | Pistal cupboard/Safe locker (New).Old item to be removed, Provision and fitment of new reputed make item with locking arrangement and associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Certificate for lock | Pistal cupboard/Safe locker (New).Old item to be removed, Provision and fitment of new reputed make item with locking arrangement and associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. Certificate for lock |
| 39 | Commode (New). Degutting of existing Commode and provision and fitment of new commode with flushing tank and flushing valve, required pipelines etc, .As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Commode (New). Degutting of existing Commode and provision and fitment of new commode with flushing tank and flushing valve, required pipelines etc, .As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 40 | NWT Door (new).Degutting of existing door and provision and fitment of new NWT Door with lock, emergency escape, handles and bulkhead frame double skin SS 304 grade with 7 lever mortise lock. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | NWT Door (new).Degutting of existing door and provision and fitment of new NWT Door with lock, emergency escape, handles and bulkhead frame double skin SS 304 grade with 7 lever mortise lock. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 41 | Shower Curtains with rods (new).Provision and fitment of new shower curtains with SS rod. Reputed make. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Shower Curtains with rods (new).Provision and fitment of new shower curtains with SS rod. Reputed make. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 42 | Shower Heads (new).Provision and fitment of new SS shower and heads with taps and mixers (reputed make) with necessary plumbing and pipeline works. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Shower Heads (new).Provision and fitment of new SS shower and heads with taps and mixers (reputed make) with necessary plumbing and pipeline works. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 43 | FW Taps (new). Provision and fitment of new SS FW taps (reputed make) with mixer along with all necessary plumbing work and pipelines. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | FW Taps (new). Provision and fitment of new SS FW taps (reputed make) with mixer along with all necessary plumbing work and pipelines. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 44 | 2 way Bib Cock (new). Provision and fitment of new SS 2 way bib cock (reputed make) along with all necessary plumbing work and pipelines. .As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | 2 way Bib Cock (new). Provision and fitment of new SS 2 way bib cock (reputed make) along with all necessary plumbing work and pipelines. .As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 45 | Towel hanger (new). Provision and fitment of new SS towel hanger rods (set of 3).As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Towel hanger (new). Provision and fitment of new SS towel hanger rods (set of 3).As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 46 | Health Faucet (new). Provision and fitment of new SS health faucet with all necessary plumbing and pipelines. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21/ Equipment dated 05 Apr 17. | Health Faucet (new). Provision and fitment of new SS health faucet with all necessary plumbing and pipelines. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21/ Equipment dated 05 Apr 17. |
| 47 | Soap dispenser (new).Degutting of old dispenser and provision and fitment of new liquid soap dispenser (reputed make).As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Soap dispenser (new).Degutting of old dispenser and provision and fitment of new liquid soap dispenser (reputed make).As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 48 | Soap Tray (new).Provision and fitment of new SS304 grade soap trays. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Soap Tray (new).Provision and fitment of new SS304 grade soap trays. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 49 | Toiletry trays (new). Provision and fitment of new toiletry tray for storage of toiletries SS 304 grade .As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Toiletry trays (new). Provision and fitment of new toiletry tray for storage of toiletries SS 304 grade .As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 50 | SS mirrors (new). Degutting of existing glass mirrors and fitment of new executive mirrors SS 304 finish with frame.\\" | SS mirrors (new). Degutting of existing glass mirrors and fitment of new executive mirrors SS 304 finish with frame.\\" |
| 51 | Cloth Hooks (new). Provision and fitment of new SS cloth hooks with 2 ends. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Cloth Hooks (new). Provision and fitment of new SS cloth hooks with 2 ends. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 52 | Grab rail (new). Provision and fitment of new SS 12\\" grab rail (reputed make).As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Grab rail (new). Provision and fitment of new SS 12\\" grab rail (reputed make).As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 53 | SS Panels (new). Degutting of old panels and fitment of new SS single skin panels 0.9 mm thick SS304 matt finish. Panelling to be detachable. Slots to be made for fitment of ventilation grills and other appliances. Inspection windows to be provided. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | SS Panels (new). Degutting of old panels and fitment of new SS single skin panels 0.9 mm thick SS304 matt finish. Panelling to be detachable. Slots to be made for fitment of ventilation grills and other appliances. Inspection windows to be provided. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 54 | SS Panels (new). Degutting of old panels and fitment of new Sandwich Panelling for Bulkhead 0.9 mm thick SS304 matt finish. Panelling to be detachable. Slots to be made for fitment of ventilation grills and other appliances. Inspection windows to be provided. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | SS Panels (new). Degutting of old panels and fitment of new Sandwich Panelling for Bulkhead 0.9 mm thick SS304 matt finish. Panelling to be detachable. Slots to be made for fitment of ventilation grills and other appliances. Inspection windows to be provided. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 55 | SS Doors (new). Degutting of existing doors and provision and fitment of new 2 leaves double skin SS toilet doors with dual side handles & mortise locks. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | SS Doors (new). Degutting of existing doors and provision and fitment of new 2 leaves double skin SS toilet doors with dual side handles & mortise locks. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 56 | SS Sink (new). Degutting of existing sink and provision of new SS sink with taps, pipelines, plumbing works, bottle trap and garbage compactor. Approx. Dimensions (600 x 600 x 450 mm). As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | SS Sink (new). Degutting of existing sink and provision of new SS sink with taps, pipelines, plumbing works, bottle trap and garbage compactor. Approx. Dimensions (600 x 600 x 450 mm). As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 57 | Urinal (new). Removal of old Urinal and provision and fitment of new western style commode with bellows, connecting elbows, CUNi pipe and associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Urinal (new). Removal of old Urinal and provision and fitment of new western style commode with bellows, connecting elbows, CUNi pipe and associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 58 | Deck drain strainer (New). Provision and fitment of item with associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Deck drain strainer (New). Provision and fitment of item with associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 59 | Crockery/Cutlery locker (New). Provision and fitment of SS locker with locking arrangements and associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Crockery/Cutlery locker (New). Provision and fitment of SS locker with locking arrangements and associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 60 | Plate stand (New). Provision and fitment of SS stand with locking arrangements and associated fittings. Provision for 50 in nos of plates. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Plate stand (New). Provision and fitment of SS stand with locking arrangements and associated fittings. Provision for 50 in nos of plates. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 61 | SS Wash basin (new). Provision and fitment of new wash basin (450x450x400 mm) with flexible pipe, controlling tap, bottle trap and SS cabinet below. Provide require Cu.ni pipelines. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | SS Wash basin (new). Provision and fitment of new wash basin (450x450x400 mm) with flexible pipe, controlling tap, bottle trap and SS cabinet below. Provide require Cu.ni pipelines. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 62 | Towel rod/Towel ring (New). Provision and fitment of New SS item with associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Towel rod/Towel ring (New). Provision and fitment of New SS item with associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| 63 | Serving table/counter (New). Provision and fitment of SS locker with locking arrangements and associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. | Serving table/counter (New). Provision and fitment of SS locker with locking arrangements and associated fittings. As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC / policy / H-21 / Equipment dated 05 Apr 17. |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail