| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 1 Osqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering , all works upto plinth level ( 1 : 5 : 10)1 cement 5 coasre sand 10 stone aggregate grade , with 40mm nominal size . crushed |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering , all works upto plinth level ( 1 : 3 : 6 ) with 20% boulders 1 cement 3 coasre sand 6 stone aggregate grade , with 20mm nominal size .crushed |
| 4 | Brick work with common burnt clay F.P.S (Non-modular) brick of class designation 75 in foundation and plinth in 1:6 (1 cement : 6 coarse sand) |
| 5 | Extra for brick work in Super structure above plinth level upto floor V level (By manual means) |
| 6 | Centering and shittering including strutting propping etc and removal of form work Foundation footing bases of columns etc |
| 7 | 12 mm cement plaster on the rough side of single or half brick wall of mix 1:6 ( 1 cement 6 fine sand ) |
| 8 | Finishing walls with water proofing cement paint of requried shade New work(one or more coat )applied @2.20.kg/10 sqm over priming coat of primer applied @0.80 litres/10 sqm complete including cost of priming coat |
| 9 | Steel work welded in built up section, trusses and framed works including cutting , hoising, fixing in position and applying a priming coat of approved steel primer and painting all complete |
| 10 | Providing and laying in position reinforced cement concrete of specified grade excluding the cost of centering and shuttering , finishing and reinforcement All work upto plinth level 1:2:4 |
| 11 | Reinforcement of RCC work in plinth band incl straightening, cutting, bending , placing in position and binding incl.all carriages complete. |
| 12 | Carriage 0f material by mechanical transport including loading ,unloading and stacking completed sand lead up to 95 KM |
| 13 | Carriage 0f material by mechanical transport including loading ,unloading and stacking completed stone aggregates below 40 mm size lead up to 25 km. |
| 14 | Carriage 0f material by mechanical transport including loading ,unloading and stacking completed brick lead up to 105 km. Please Enable Macros to View BoQ information |