Name of Work:- Repairing and maintenance of internal road by hotmix method at SMY Biswan Sitapur.
Sl. No.
Item Description
1
Providing , laying ,spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-0100 kN static roller in stages to proper grade and camber, applying and brooming , crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405
2
Providing and applying tack coat with VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared surface cleaned with hydraulic broom .( By Mechnaical Means)
3
Providing and laying Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder as per job mix , transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 508 complete in all respects.
4
Maintenance cost of 1ndyear @0.00% cost of work ( Item No : 53 to 60)
5
Maintenance cost of 2ndyear @0.25% cost of work ( Item No : 53 to 60)
6
Maintenance cost of 3ndyear @0.50% cost of work ( Item No : 53 to 60)
7
Maintenance cost of 4ndyear @0.75% cost of work ( Item No : 53 to 60)
8
Maintenance cost of 5ndyear @1.00% cost of work ( Item No : 53 to 60) Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.