| 1 | Dismantling of road with labour, T&P, etc., all complete.a) bituminous Road |
| 2 | Excavation of soil mixed with kankar/moorum with labour, T&P, etc., all complete. |
| 3 | Supply of materials: -a) 110 mm HDPE pipe PN – 6 (IS 4984 : 2016) |
| 4 | b) 110 mm TEE |
| 5 | c) 110 mm End Cap (SDR 11 PE – 100) |
| 6 | d) 110 mm Bend (SDR 11 PE – 100) |
| 7 | e) 110 mm Coupler (SDR 11 PE – 100) |
| 8 | Laying, Electro – fusion jointing & testing of 110 mm HDPE pipe, tea end cap, Bend, coupler etc., with labour, T&P, etc., all complete. |
| 9 | Sand filling for bedding & cover on HDPE pipe with material, labour, T&P, etc., all complete. |
| 10 | Provision for inter connection in main water line to existing water line including all labour T&P Completed work. |
| 11 | Making new house connection with 20 mm HDPE pipe up to 5 m in length in 110 mm dia of HDPE distribution main including dismantling of road, excavation of earth supply, carting of specials lowering them into trenches, fixing them including bailing out water necessary excavation for connection, G.I pipe minium class 1 m, water tap ferrule and all other material required heavy duty brass bib cock as per type design. Including all labour, T&P etc. required for proper completion of the works as per design and reinstalment of road and satisfaction of engineer incharge. |
| 12 | Barricading at working site for sefty purpose both side with all labour T&P comp,. |
| 13 | Site Cleaning during work at site |
| 14 | I. Restoration of Bituminous road |
| 15 | I. Supply & filling of GSB for bedding with with material, labour, T&P, etc., complete in all respect. |
| 16 | II. Supply & filling of Sand for bedding with with material, labour, T&P, etc., complete in all respect. |
| 17 | Disposal of Surplus excavated earth over including loading / Unloading & Cartage upto 8 km (5% of excavated earth) Please Enable Macros to View BoQ information |