| 1 | C/o 2.00 mtr span RCC slab culvert at RD 0/210 |
| 2 | Providing and laying mechanically mixed and vibrated concrete for plain/reinforced concrete in open foundations for all types of structure complete of plain cement concrete nominal mix 1:3:6 (one cement :Three sand :Six graded crushed /broken stone aggregate 20 mm (Twenty Millimeters) nominal size on ground or under water including curing complete, pumping or bailing out water ,dewatering removal of slush as required at site which may arise at the time of laying concrete complete for all heights/depths including the cost of form work in drain as per drawings and MORD technical specifications section 800, 900 and 1200 and as per the direction of Engineer-in-Charge including carriage of material within all leads and lifts and other incidentals. The rate is including octrai, royality, Malkana. toll tax, sale tax, GST or other taxes imposed by the Government. |
| 3 | Providing and laying mechanically mixed and vibrated concrete for plain cement concrete in sub-structure for all type of structure complete of plain cement concrete nominal mix 1: 2 ½ :5 ( One cement : two point five sand : five graded crushed/ broken stone aggregate 20mm (Twenty millimetre) nominal size) on ground or under water and curing complete including pumping or bailing out water , dewatering removal of slush as required at site which may arrise at the time of laying concrete complete for all heights/ depths in abutments etcetera and the like including the cost of form work as per drawings and M.O.R.D. technical specification section 800, 900 and 1200 and as per direction of Engineer-in-Charge Including carriage of material within all leads and lifts and other incidental . The rate is including of octroi, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 4 | Providing and laying mechanically mixed and vibrated concrete for plain concrete in open foundation for all type of structure complete of plain cement concrete grade M-15 (M- fifteen) designed mix with cement contents not less than 275 Kg. (Two hundred seventy five kilogram) per cubic metre with crushed stone aggregate 40mm (Forty millimetre) nominal size on ground or under water and curing complete for 14 ( fourteen) days including pumping or bailing out water, dewatering removal of slush as required at site which may arise at the time of laying concrete complete for all heights/ depths including the cost of form work in all type of structure as per drawings and MORTH technical specification section 1500, 1700 and 2100 and as directed by the Engineer-in-charge including carriage of material within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government. |
| 5 | Providing and laying mechanically mixed and vibrated plain cement concrete Grade- M-20 (M-Twenty) nominal mix 1:2:4 (one cement : two sand : four graded crushed stone aggregate 40mm (forty millimeter) nominal size in open foundation in flooring of catchpit as per drawing and M.O.R.D. technical specifications clause 802, 803, 1202 and 1203, including the cost of form work, curing complete and hauling of materials in all kinds of leads, lifts and other incidental and as per the entire satisfaction and directions of Engineer-in-Charge. The rate is including of octroi, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 6 | Providing and laying mechanically mixed and vibrated reinforced cement concrete Grade- M-25 (M-Twenty Five) in open foundation design mix with cement contents not less than 400 kg (Four hundred kilogram) per cubic metre using graded crushed stone aggregate 20mm (twenty millimetre) nominal size complete as per drawings and MORD technical specification section 800, 900 and 1400, including the cost of form work and curing complete including hauling of materials with in all leads, lifts and other incidental and as per the entire satisfaction and directions of Engineer-in-Charge. The rate is including of octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government. |
| 7 | Supplying, fitting and placing HYSD bar reinforcement in sub structure complete with straightening, bending, binding of bars including the cost of binding wire in all heights / depths as per drawing and MORTH technical specification section 1600 and 2300 and as per direction of Engineer-in-Charge including carriage of materials within all leads and lifts and other incidentals. The rate is including of octroi, royality, Malkana, tolltax, GST or other taxes imposed by the government. |
| 8 | Supplying, fitting and placing HYSD bar reinforcement in sub structure complete with straightening, bending, binding of bars including the cost of binding wire in all heights / depths as per drawing and MORTH technical specification section 1600 and 2300 and as per direction of Engineer-in-Charge including carriage of materials within all leads and lifts and other incidentals. The rate is including of octroi, royality, Malkana, tolltax, GST or other taxes imposed by the government. Please Enable Macros to View BoQ information |