| 1 | Earth work in exacavation in foundation in ordinary soil including lift upto 1.5 m and lead upto 30m. and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer i/c with in a lead of 30 m.,,PWD Sor Ch.No.5, S.No.251 (4.1.1) |
| 2 | Filling with avilable earth in trenches, plinth, sides of foundation, etc.in layers not exceeding 20 cms in depth consolidating each deposited layer by ramming and watering including lead upto 50m and lift upto 1.5m.,, PWD SOR/DSR 2.25 |
| 3 | Providing and laying in cement concrete 1:6:12 (1 cement : 6 fine sand : 12 brick aggregate 40 mm nominal size) and curing complete, including cost of form-work, in foundation and floors.,, PWD Sor Ch.No.6, S.No.274 |
| 4 | R.C.C Works in 1:1.5:3 cement,c/sand & 20mm Stone Gritt all complete for RCC T beam & column including Necessary Centeringand Shuttring etc. an also including supply of all materials required for proper completion of work .PWD Sor Ch.No.6, S.No.288 (B) |
| 5 | M.S. (Mild Steel) Works in Rcc Work in or Rain forcement brick work wrought to Required shape as necessary including bending for proper completion of work and including supply of steel and its westage ,, .PWD Sor Ch.No.10, S.No.504 (10.3.1) |
| 6 | Class 150 brick work in 1:6 cement and c/sand mortar in foundation and plinth including supply of all materials, labour and tools and plants etc.required for proper completion of the work. PWD Sor Ch.No.7, S.No.303(a) |
| 7 | Same as in item no. 7,,but in ratio of 1:4 cement and coarse sand above but in super-structure including necessary cutting and moulding of brick work as required and also including honey combed brick work in thickness of wall one brick thick. PWD Sor Ch.No.7, S.No. 305b+309+310 |
| 8 | Plastering 12 mm thick plaster with cement mortar in proportion of 1:2 cement & coarse sand complete including supply of all materilas .labour and T&P etc. required for proper complete of the work ,, .PWD Sor Ch.No.12, S.No.583 |
| 9 | Putty on the surface of boundary walls .PWD Sor/DSR DSR 13.80 |
| 10 | Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade . Includung supply of all materilas labour and required for proper completion of the work, .PWD Sor Ch.No.14, S.No.660+661+662 |
| 11 | S/F of M.S iron gate wrought to required from including drilling holes,reviting of welding where necessary & their fixing required for proper completion of work .PWD Sor Ch.No.10, S.No.503 (10.2.2) |
| 12 | Painting or Varnishing new iron work in small area of ready mixed priming paint and the one coat of approved superior quality ready mix paint of clear synthetic varnish including supplying of all materials labour and T&P etc,required for proper completion of work ,, PWD Sor Ch.No.14, S.No.641+642 (15.1.1+15.1.2) |
| 13 | Providing of photographs |
| 14 | Providing of photographs Please Enable Macros to View BoQ information |