| 1 | E/W in excavation in foundation in ordinary soil includingall labour T&P completion of work ,, S.I.No. 251 ,, in S/E |
| 2 | P/L cement concrete in 1:6:12 C:F.Sand:40mm gauge OBB in i/c supply of all material, labour, T&P etc.required for proper completion of work,, S.I.No.273 ,, in S/E |
| 3 | M-150 brick work in 1:4,C.F.Sand mortar fineness modulus 1.25 in foundation on plinth i/c supply of all material, labour, T&P etc. required for proper completion of work.S.I.No.305(b) in S/E |
| 4 | P/L cement concrete in 1:4:8 , (1 cement : 4 sand : 8 blast ) , C:F.Sand:40mm gauge OBB in i/c supply of all material, labour, T&P etc.required for proper completion of work,, S.I.No.275 ,, under cc base |
| 5 | P/L of Polythene (125 microne) sheet below for C C work including all materials,labour etc..complete |
| 6 | Laying of c.c.road slab consisting of 1:2:4 cement, C/sand & approved 20mm gauge Dala stone grite including supply of all material, labour, shuttring & scentring T&P etc. required for proper completion of work S.I.No.282 |
| 7 | 12 mm thick plaster in 1:4,C:F.sand 1.25 F.M.i/c supply of all material, labour, T&P etc. require for proper completion of work.S.I.No.583 in S/W |
| 8 | Construction joint filled with bituminous [email protected]. In lenth complete in all respect.Size (1.00x0.35x.012)met. |
| 9 | RCC Hume Pipe NP3 including collars/spigot joint with stiff mixture of cement in the proportion of 1:2 ( 1 cement : 2 fine sand ) including testing of joints , 350 mm dia Hume Pipe,,complete item..PWD SOR Ch 01 ,Sr No. 26 |
| 10 | Providing of photographs |
| 11 | Providing of signboard Please Enable Macros to View BoQ information |