|
| 1 | Charpoy GI pipe with plytop, FD-220 |
| 2 | Dismantling of all members and Unserviceable plywood top of charpoy GI pipe carefully and segregate the unserviceable members and Stacking it ,complete all as specified in drawing and as directed. |
| 3 | Supply, cutting, threading of GI Pipe 32mm dia medium grade of size as specified for long rail, complete all as specified in drawing and as directed. |
| 4 | Cutting, modifying and threading of the dismantled GI pipe 32mm dia long rail into short rail, complete all as specified in drawing and as directed. |
| 5 | Cutting, threading and modifying of the dismantled GI pipe 32mm short rails into legs as specified in the drawings. Providing flat iron clamps 25 x 3mm 2 Nos made of shape as shown in the drawing to welded in the GI Pipe legs to hold FMN Set, painted with black synthetic enamel paint, complete all as specified in drawing and as directed. |
| 6 | Supply only 3 way elbow of 32mm for charpoy GI pipe The elbow shall not be less than 400 gms in weight with ISI Mark for GI pipe charpoy, complete all as specified in drawing and as directed. |
| 7 | Supply only 32mm dia GI cheeknut for GI pipe charpoy, complete all as specified in drawing and as directed. |
| 8 | Supply only 75mm length GI round headed bolt and nut with Suitable Cut washer, complete all as specified in drawing and as directed. |
| 9 | Removing Unserviceable steel flat iron stiffeners and supply and fix new steel flat iron stiffeners made out of 40 x 3mm and length not less than 0.91 mtr including painting the stiffener with 2 coats of synthetic enamel black paint over a coat of red oxide primer, complete all as specified in drawing and as directed. |
| 10 | Re-assembling the GI charpoy with serviceable members obtained from item No 1.01 & new members made above. Supply & fixing of 12mm thick BWR plywood (7 ply) of size 2.00 mtr x 0.91 mtr make as approved by GE. The edges of the plywood shall be finished with sand paper for smooth surface. The plywood top shall be fixed with 75mm length GI round headed bolt and nut with Suitable Cut washer as per existing arrangement (supplied under item 1.07 above) and complete all as specified in drawing and as directed. |
| 11 | Bed hard top/Charpoy IP hard top Drg No: FD/E6/MAP/08 FD/MAP/SD/07, FD/MAP-II/01, and CE CZ-77 |
| 12 | Scrapping down the rusted portion of Charpoy IP hard top/ Bed hard top with sand paper smoothing the surfaces carrying out repairs such as welding wherever required and applying two coat of synthetic enamel black paint, over one coat of red oxide primer and removing the Unserviceable PVC Bush and S & F New PVC Bush, complete all as specified in drawing and as directed. |
| 13 | Removing the existing Unserviceable Ply wood from Charpoy IP hard top/ Bed hard top and S & F 12mm thick BWR plywood and S & F suitable flat headed nuts and bolt including Suitable Cut Washer, complete all as specified in drawing and as directed. |
| 14 | Head board and footboard of the bed hard shall be made of 18/19mm thick prelaminated MDF board both side, exterior grade (grade-I, type-II) ISI marked with approved walnut colour or shade as approved by GE of (make:- Century prowud from Century ply/Green panel max from Green ply/Action Tessa) with 2mm thick PVC edging of matching colour all round on head board and footboard shall be fixed with strong bonded chemical through hot pressed machine to be provided as per standard workmanship.Note:- Hand pressed/manual pressed beading/edging will not be accepted. |
| 15 | Cot tubular steel |
| 16 | Removing paint by scrapping down old painted surface carrying out repairs such as removing the dents and welding wherever required and applying one coat of synthetic enamel black paint over a coat of red oxide primer on cot tubular Steel, complete all as specified in drawing and as directed. |
| 17 | Removing the existing unserviceable cotton newar from the cot tubular and reweaving with new cotton newar of width 48mm, Superior quality all as approved in sample (14 rows length wise and 34) rows width wise, complete all as specified in drawing and as directed. |
| 18 | Bed plywood top (Drg No. FD-246) |
| 19 | Removing the existing Unserviceable ply wood from the head board and providing new one side teak face plywood 4mm thick of size 900x450mm for both sides including 12mm half cut teak wood beading at the front and back ply wood faces of the head board as shown on drawing. |
| 20 | All as per item No.4.01 here-in-before but for foot board of size 900x300mm |
| 21 | Replacement of long rail with S & F new Ist class Hardwood (teak wood) long rail made to shape fixed in position complete all as shown on drg specified and directed. |
| 22 | Replacement of short rail with S & F new Ist class Hardwood (teak wood) short rail made to shape fixed in position complete all as shown on drg specified and directed. |
| 23 | Removing the existing unserviceable stiffeners and S & F New stiffeners of II nd class hard wood of size 40 x 30mm all as per drg. |
| 24 | Removing existing unserviceable 12mm thick plywood from Bed plywood top and Supply and fixing of new plywood 12mm thick BWR of size 1800 x 900mm conforming to IS 303 and as shown on drg. |
| 25 | Supply & fixing of corner bracket made out of 1st class hard (Teak) wood of size 100 x 100 x 25mm thick to bed hard. Fixing of bracket should be done with fevicol and suitable steel screws. |
| 26 | Tightening the wooden members with bamboo pins where ever required in the bed to made to existing shape all as directed and Preparing the surface of old and new members by smoothly / rubbing with 120 Gde or various sizes sand paper/ abrasive cloth or machine and clean off surface and applying sealer wherever required to fill and smoothen the surface and apply two coat of french polish to the entire external and visible surface complete uniformingly upto glossy mirror finish, including providing of 04 Nos hard PVC shoe of heavy duty to the chair with steel screw and complete all as specified in drawing and as directed. |
| 27 | Charpoy Folding with hard top (FD-388R). |
| 28 | Removing the old Unserviceable plywood and S & F new 12mm thick ply wood top commercial BWR grade,synthetic resin bonded, conforming to IS 303-1989 of suitable size as per drawing in two parts with new stainless steel nut and bolts complete all as specified and as directed.Make:- Kit ply/ century/ National. |
| 29 | Repairs of charpoy folding frame including tightning, replacement of old nut and bolts and rivets and welding wherever required as per trade practice and shown on drawing complete all as specified and as directed. |
| 30 | M & L Painting of frame with two coats of black paint or reqd shade by preparing the surfaces after removing old paints by means of spray painting to all steel surface and provide 06 Nos Hard PVC shoe to the bottom of the leg etc complete all as specified and as directed. Please Enable Macros to View BoQ information |