| 1 | Earth work in excavation of foundation of structure as per drawing and technical specifications including setting out construction of shoring and bracing removing of stumps and other deletenous matter dressing of side and bottom and back lifting with approved materialUp to 3 mtr. Depth |
| 2 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mixed using with batch plat, trnsist mixer and concrete pump including supply, carriage laoding and unloading of material from an approved quarry complete as per Drawing and Technical Specifications,placed in foundation and compacted by vibration including curing for 14 days. |
| 3 | Providing and Laying Plain Cement Concrete M-15 in Foundation PCC using with batch plat, trnsist mixer and concrete pump including supply, carriage laoding and unloading of material from an approved quarry complete as per Drawing and Technical Specifications. |
| 4 | Providing and Laying Plain Cement Concrete M-25 in Foundation and plinth using with batch plat, trnsist mixer and concrete pump including supply, carriage laoding and unloading of material from an approved quarry complete as per Drawing and Technical Specifications. |
| 5 | Providing and Laying RCC Grade M-30 in foundation and plinth Using batching plant, transit mixer and concrete pump including supply , carriage, loading and unloading of Material from an approved quarry complete as per drawing and technical specification. |
| 6 | Providing and Laying RCC Grade M-25 in Sub Strucuture height upto 5 m using batching plant, transit mixer and concrete pump including supply , carriage, loading and unloading of Material from an approved quarry complete as per drawing and technical specification. |
| 7 | Providing and Laying RCC Grade M-30 in Sub Strucuture height upto 5 m using batching plant, transit mixer and concrete pump including supply , carriage, loading and unloading of Material from an approved quarry complete as per drawing and technical specification. |
| 8 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specifications. |
| 9 | Furnsihing and Placing RCC Grade M-30 Using batching plant, transit mixer and concrete pump - For Solid slab super strucutre including centering and shuttering height upto 5 m including supply , carriage, loading and unloading of Material from an approved quarry complete as per drawing and technical specification. |
| 10 | FURNISHING AND PLACING REINFORCED/PRESTRESSED CONCRETE RCC GRADE M-40(SUPER STRUCTURE) USING BATCHING PLANT,TRANSIT MIXER , AND CONCRETE PUMP (CSR 22.1( Ei)) |
| 11 | Drainage spouts complete as per drawing and technical specifications |
| 12 | Weaving of MSA wire crates netting 15 cm X 15 cm mesh i/c binding sides and partitions including supply of MSA wire 4mm dia as per Pwd Specifications |
| 13 | Filling stones or spalls into crates and hand packing including supply of Boulder stone and carriage from approved quary, loading, unloading, stacking to stackyard and rehandling from stackyard to site of work |
| 14 | Extra for laying, watering earth/fly ash as per specifications in 20 cm. Layers and dressing but including cost of rolling. |
| 15 | FILLER JOINT : PROVIDING AND FILLING JOINT SEALING COMPOUND INCLUDING ALL MATERIAL AS PER DRAWINGS AND TECHINCAL SPECIFICATIONS WITH COARSE SAND AND 6% BITUMEN BY WEIGHT-10MM DEPTH |
| 16 | EXTRA FOR BITUMEN PAINTING AT THE RATE OF 0.69KG/SQM |
| 17 | Supplying fitting and placing un-coated HYSD bar Reinforcement complete as per drawing and technical specifications. (i) In Foundation |
| 18 | Supplying fitting and placing un-coated HYSD bar Reinforcement complete as per drawing and technical specifications.(ii) In sub structure |
| 19 | Supplying fitting and placing un-coated HYSD bar Reinforcement complete as per drawing and technical specifications.(iii) In Super structure |
| 20 | PROVIDING AND LAYING , JOINTING , FIXING TESTING G.I. PIPES LINES B CLASS INCLUDING COST OF SPECIAL SUCH AS TEES , BENDS, SOCKETS,ELBOWS ETC CUTTING , THREADING AND TESTING IN TRENCHES IN THE GROUND CPMPLETE (CSR 28.36 g) |
| 21 | Any others item Please Enable Macros to View BoQ information |