| 1 | providing and laying 150mm di waterpipeline at chavindra nashik road from mamta esr to zidane tower ward no 2 |
| 2 | Item No. 1 Providing D.I. pipes (push on joints pressure pipes of D. I. of following class and diameters confirming to the I. S. specification inclusive cost of jointing materials (Rubber gasket of EPDM Quality ) excluding GST levied by GOI & GOM in all respect including Third party inspection charges of TPI Agency approved by MJP including Transit insurance, Railway Freight, Unloading from railway wagon, Loading into Truck, Transportation to departmental store, unloading, stacking etc. completed as directed by Engineer in charges (IS 1536/2001 for pipes and IS 158/1969 and IS 12820/1989 or latest edition/revision with amendments for Rubber Gaskets. |
| 3 | Item No. 2 Lowering laying and jointing with SBR ruber gaskets C.I. S/S pipes of various classes with CI / MS specials of following diameter in proper position, grade and alignment as directed by Engineer-in-charge including conveyance of material from stores to site of work, including cost of jointing materials and rubber rings labour etc. complete. Note : Only SBR Rubber gaskets to be used as per IS-5382 and IS-12820. |
| 4 | Item No. 3 Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
| 5 | Item No. 4 Excavation for foundation / pipe trenches by all means in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
| 6 | Item no. 5 Excavation for foundation / pipe trenches by all means in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
| 7 | Item No. 6 :Supply of C. I. Mechanical Compression Collar Coupling suitable for C. I. Spun Pipes ( as per - IS - 1536 /2001) and complete with sealing rubber gasket of SBR,.C.I. follower Glands and M.S. nut Bolts.The whole assembly should be mechanically and hydraulically tested to the provisions as laid down in IS:1538 /1993. |
| 8 | Item No. 7 Supply of C. I. Mechanical Joint Double Socket Bends as dimensionally described in Table-14 of IS-13382/ 1992 complete with sealing rubber gasket of SBR (dimensionally described in IS-12820/1989) with cast iron follower gland and mild steel nut bolts coated or otherwise protected from rusting and suitable for C. I. pipes. |
| 9 | Item No. 8 Supply of C. I. Mechanical Joint Double Socket Bends as dimensionally described in Table-14 of IS-13382/ 1992 complete with sealing rubber gasket of SBR (dimensionally described in IS-12820/1989) with cast iron follower gland and mild steel nut bolts coated or otherwise protected from rusting and suitable for C. I. pipes. |
| 10 | Item No. 9 Cutting and champhering of pipes of following diameters including cost of all materials and labour involved, etc. complete as directed by Engineer-in-charge (for all class of pipes). |
| 11 | Item No. 10 Providing and laying in situ CementConcrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 bags / cum) |
| 12 | Item No. 11 Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. |
| 13 | Item No. 12 Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. (Bd-A-9/261 |
| 14 | G.S.T. 18% Please Enable Macros to View BoQ information |