| 1 | providing and laying 250mm drainage pipeline and chamber work from barf galli rahat hospital to kap ali toilet nala at prabhag samiti 5 |
| 2 | Item No. 1 Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
| 3 | Item No. 2 Excavation for foundation / pipe trenches by all means in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
| 4 | Item No. 3 Excavation for foundation / pipe trenches by all means in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
| 5 | Item No. 4 Providing ISI standard 2 R.C.C pipes in standard lengths of following class and diameter suitable for either collar joints or rubber ring joints, excluding GST lev-ied by GOI & GOM in all respect including inspec- tion charges, transport to departmentaL stores, unloading and stacking etc. complete as per IS-458/1988. |
| 6 | Item No. 5 Lowering, laying andjointinginpropergradeand alignmentR.C.C.pipeswithcollar jointsinC.M.1:1 proportion or socketedR.C.C. pipeswith rubber joints (excluding cost of rubber ring or R.C.C. collar,) includingcostofconveyancefromstoresto siteof work, cost of jointingmaterial, labour, etc. completeasdirectedbyEngineerin-charge(For all classofpipes.)asperIS-783-1985. vi) 250mm Dai |
| 7 | Item no.6 Providing and constructing on sewer, B. B. masonry circular manhole with concentric cone 1.2 M dia. at bottom and 0.5 M dia. at top and upto a depth of 2.00 M with 23 cm brick work in CM 1:4 proportion excluding excavation including foundation concrete 250 mm thick and haunches and channels in C. C. 1:2:4 proportion, finishing channels in smooth rendering, providing C.I. dapuri type steps each weighing 5.5 kg., 1:2:4 coping and providing and fixing approved make and quality S.F.R.C. frame and cover of 56 cm dia. etc. complete as directed by Engineer incharge. |
| 8 | Item No. 7 : Providing and constructing Brick Masonry Inspection Chamber 60cm x 45cm x 90cm including 1:4:8 cement concrete foundation 1:2:4 cement concrete channels half round G.S.W. pipes, Brick Masonry, plastering from inside and airtight C. I. cover of 75Kilogramwith lid and frame fixed in cement concrete. |
| 9 | Item No. 8 Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete.(Cement 5.90 bags / cum) |
| 10 | Item No. 9 Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. |
| 11 | Item No. 10 Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. (Bd-A-9/261) |
| 12 | G.S.T. 18% Please Enable Macros to View BoQ information |