| 1 | Old Interlocking Dismanting |
| 2 | Earth work in cutting or in embankment in ordinary soil,excation to be in the form of regular pits not exceeding 0.5m in depth etc. Asper S.I.No.-253. |
| 3 | Excavation for foundation in ordinary soil including normal lead and lift with all completion of work and including disposal upto three chain minimum. As per SI no-251.Schedule Rate |
| 4 | Concrete with 40mm gauge brick ballast / stone ballast ,f/sand & cement in proportion of 8;4;1 in foundation and under floors including supply of all materials,labour and T & P etc,required for proper completion of the work.As per SI No-275 |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 6 | First class b/w in 1:4 in cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc required for proper completion of work. Asper S.I.No.305(b) |
| 7 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 310 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing |
| 8 | Cement Concrete in 1:2:4 in cement, coarse sand and 20mm guage stoe ballast in foundation and floor including supply of all materials, labours, T&P,etc. required for proper completion of the work.As per SI.no-279.(b) |
| 9 | 12mm thick cement plaster in 1:3 cement and C.sand moltar including supply of all material, labour and T&P, etc. required for proper completion of work as per SI no- 583. Schedule Rate |
| 10 | Providing & laying RC.C.in 1:2:4 cement C/Sand/20mm sg not less than strength M150 (1 cement: 2 approved course sand& course stone grit 20mm nominal size) AS SI NO 284 (a) |
| 11 | M/S work or iron work in R.C.C. work S.I.504 |
| 12 | Supply and fixing of granite stone information board i/c letter writing etc at site Please Enable Macros to View BoQ information |