| 1 | Excavation in foundation in all kinds of soil to proper section and profile with all leads, lifts and delifts including dressing and levelling the bed to proper slope and level and making it fit for laying concrete and depositing the excavated materials away from the work site with all leads, lifts and delifts including shoring & shuttering, coffer dam, dewatering if necessary from foundation all labour, T & P materials required for the item complete in all respect as directed by the Engineer-in-charge |
| 2 | Filling foundation and plinth with sand including watering and rammeb in layers of 23.5 cm thick etc complete and including cost, conveyance, royalty and taxes of all materials and supply of all labour, T&P required for the work etc. complete in all respect as directed by, dewatering if required for the work the Engineer-in-charge. |
| 3 | Providing CC M-15 (as per design mix) with 20 mm size crusher broken granite course aggregate quarried & free from weathered skin of approved quality, mixing by concrete mixer including hoisting, lowering and laying the concrete in position to proper slope and level and compacting by Vibrators in layers .not exceeding 0.15m depth and finishing exposed surface smooth including watering, curing for required period cost, conveyance, royalty and other taxes of all materials labour, T&P materials required for this item including hire and running charges of the machineries complete as directed by the Engineer-in-charge. |
| 4 | Providing CC M-20 (as per design mix) with 20 mm size crusher broken granite course aggregate quarried & free from weathered skin of approved quality, mixing by concrete mixer including hoisting, lowering and laying the concrete in position to proper slope and level and compacting by Vibrators in layers .not exceeding 0.15m depth and finishing exposed surface smooth including watering, curing for required period cost, conveyance, royalty and other taxes of all materials labour, T&P materials required for this item including hire and running charges of the machineries complete as directed by the Engineer-in-charge. |
| 5 | Supplying, straightening ,cutting,bending and binding of uncoated HYSD Steel (manufacturer /Producer approved by Govt. of Odisha) for concrete works and tying the grills as per approved design & drawing and placing in position including cost, conveyance, royalty and other taxes binding wires of 18 to 20 gauge and MS Rods of approved quality including all leads & lifts from bending yard to placement spot with supply of all labour, taxes as per prvailing norm and T&P required for the work etc, complete in all respect as directed by the Engineer-in-Charge. (Weight of the binding wire will not be considered in the measurement for payment). |
| 6 | Providing Weep Holes of 100mm dia using A.C./ PVC pipe, fixing with cement mortar including cost, conveyance, royality of all materials & cost of all labour etc complete as per approved Drawing & Technical Specifications and Clause -2706 & 2200 of MoRT&H Specifications for Road & Bridge works and all labour, T&P materials required for this item etc. complete as directed by Engineer-in-Charge. |
| 7 | Providing fitting and fixing of 12mm thick salitex board (Bitumenous expansion joint board) in expansion joint and all labour, T&P materials required for this item etc. complete as directed by Engineer-in-Charge. |
| 8 | Rigid smooth centering and shuttering for reinforcement cement concrete work and dismentaling them after casting and removing the debries away from work site with cost, carriage, royality.etc. complete as direct by the Engineer-in-Charge. |
| 9 | Filling the gaps of foundation and plinth with excavated earth with all leads and lifts including breaking clods to maximum 5cm.to 7cm.in size and watering, ramming and all labour, T&P required for the work etc. complete as directed by the Engineer-in-Charge. |
| 10 | Labour charges for laying, fixing and collar jointing RCC spun pipes with necessary twisted and coaltarred hemp yarn including chulking and filling with cement concrete(1:2;4) and finishing the same smooth and curing including cost, conveyance, royalty and taxes all materials with all leads and lifts complete as per the direction of the Engineer-in-charge.(Including cost & conveyance of RCC spun pipes). 150mm dia NP3 RCC Hume pipe Please Enable Macros to View BoQ information |