|
| 1 | Earth work excavation of foundation in ordinary soil including rough dressing breaking the clods & leveling the bed and sides and depositing the excavated materials away from work site with all leads, lifts, delifts, cost of labour, T&P, cess, taxes etc. complete as per direction of Engineer-in-charge. |
| 2 | Filling in foundation and plinth with sand well watered and rammed including cost carriage and royalty of sand & labour charges etc. complete as per the direction of the Engineer-in-Charge |
| 3 | CC work of M-15 grade with 40mm and down graded black hard granite (crusher broken) stone chips including hoisting and laying including cost, carriage, royalty and taxes of all materials etc. complete as directed by the Engineer-in-charge. |
| 4 | CC work of M-20 grade with 20mm and down graded black hard granite (crusher broken) stone chips including hoisting and laying including cost, carriage, royalty and taxes of all materials etc. complete as directed by the Engineer-in-charge. |
| 5 | CC work of M-25 grade with 20mm and down graded black hard granite (crusher broken) stone chips including hoisting and laying including cost, carriage, royalty and taxes of all materials etc. complete as directed by the Engineer-in-charge. |
| 6 | Providing form work for concrete with F2 finish for all permanent exposed surfaces not prominently expose to public views such as in gallaries, adits, bridge and retaining walls etc. with all shutters or ply wood shutters including supply of rigid tie and supports with all labour, materials, cess & T&P etc. complete as per the direction of the Engineer-in-Charge. |
| 7 | Collecting supplying fitting & placing uncoated HYSD reinforcement for RCC work including cutting, bending, binding and tying the grill and placing in position including cost of binding wire 18 to 20 gauge etc. complete as per the direction of the Engineer-in-Charge. |
| 8 | Removing old revetment and approns and re-packing with old sotne including filling the interstices with small stones & wedges as per site requirements and packing the surface to proper lines & level with all leads and lifts & delifts including all labour T&P Cess and all other incidental charges involved for etc. complete as per specification and direction of the Engineer in charge. |
| 9 | Earthwork in excavation in all kind of soil including dressing and levelling the bed and depositing the soil away from the work site with all lead , lifts and delifts etc. complete as directed by the Engineer-in-charge. |
| 10 | Puddle filling with good clay with initial lead 50m and lift of 1.50mtr including digging siff clay, carrying weatehering, pulversing, laying and troding etc. all complete with all cost of labour T&P and all other incidental charges required etc. complete as per specification and direction of the Engineer in charge. Please Enable Macros to View BoQ information |