| 1 | Dismantling of damaged condition of Cement concrete of road including stacking the useful materials for reuse etc all charges and removing these within initial lead of 50.00 mtr etc complete. |
| 2 | Carriage of excavated earth away from work site to out site by mechanical means including loading & unloading and dumping within 5 Km lead etc complete as per direction of Engineer -in- charge. |
| 3 | Supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 200mm thick, watering and ramming including cost, conveyance royalty and taxes of all materials, cost as per the direction of Engineer-In-Charge. |
| 4 | Supplying and providing of Cement concrete of proportion (1:4:8) by using 40mm sized HBHG metal of approved quality including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect as per the direction of Engineer-In-Charge. |
| 5 | Supplying and providing of Cement concrete of proportion (1:2:4) by using 12mm sized CBHG chips of approved quality including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect as per the direction of Engineer-In-Charge. |
| 6 | R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2” to ¾”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion in all respects as per direction of Engineer in charge but excluding cost of M.S rod / Tor steel and binding wires and labour charges for bending, binding wires and labour charges for bending, binding and tying the grills. |
| 7 | Supplying all materials, labour, T&P for smooth centering and shuttering to RCC works etc all complete as per specification and direction of the E.I.C. |
| 8 | Straightening, cutting, bending and binding, welding and jointing (if necessary ) coiled/ bent up MS Rods /Tor Steel/deformed rods etc. including hoisting, placing in position, tying the grills binding with 18 to 20 gauge binding wire required for R.C.C work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete (weight of binding wire will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S rods or Tor steel linear measurements of rod for finished item of works. 5% wastage and lap length are included in the finished rate). |
| 9 | Making Signage board, photos before, during & after execution of the work and other unforseen items etc complete Please Enable Macros to View BoQ information |