| 1 | Dismantling & removing cement concrete including stacking the useful materials for re-use & removing the debries with in 50 mtrs lead as per the direction of EIC. |
| 2 | Engaging of 5Hp diesel pump etc for dewatering storm water & accumulated storage water from side with all labour charges carriage, cost |
| 3 | Earth work in slushy soil(In water upto 6.0 m depth requiring the aid of pans & vessels within 50m initial lead & 1.5m initial lift as per the direction of EIC. |
| 4 | Earth work excavation in Hard soil using two cum Bucket Hydraluc Excavator with all leads and lifts and transpotation of ecavated matiral by mechcanical means. and direction of Engg -in-charge. |
| 5 | Conveyance of excavated materials such as rough stone, metal, khoa, chips, sand, surki,quarry rubbish, moorum, laterite stone, washed gravel, flyash and earth away from the work site by mechanical means including loading and unloading and depositing the same within 5km truck lead as per the direction of the Engineer in charge. |
| 6 | Filling in foundation with sand well watered & rammed including cost, conveyance, royalty & taxes etc. complete of all materials to work site as the specification approved by the department and direction of Engineer in charge. |
| 7 | Cement Concrete (1:3:6) with 4cm size Hard Granite Crusher Broken metal including all cost, conveyance, royalty & taxes etc.compete of all materials to work site as per specification approved by the department & direction of Engineer-in-charge. |
| 8 | Fabrication and manufacturing of solid precast concrete element with provisions of shear keys, connecting loops, dowel tubes and proper lifting accessoriesfor walls, beams, slabs, stairs, column etc, of various thickness, shape and size of different concrete grades manufactured in controlled factory environment with approved methodology including moulds (Pallet system, Tilts form, table moulds, battery moulds, vertical moulds, beam moulds, column moulds, staircase moulds, Facade mould, etc.), mixing, transporting and placing of concrete, vibrating, curing, finishing, making necessary cutott/holes of required sizes for services. yard handling & stacking all complete as per IS 11447:1985 and as per approved shop drawings and design mix as per the direction of Engineer-in-Charge (Cost of reinforcement, Mechanical, Electrical and Plumbing inserts will be paid separately). |
| 9 | Erection & Installation of Precast/Prestressed Concrete elements in correct & final position with proper line level and plumb at site making all |
| 10 | C:C: (1:2:4) using 12 mm. size H.G. stone chips including the cost of all materials labour T&P sundries etc completed. Please Enable Macros to View BoQ information |