| 1 | 132/33 KV Grid Sub station Kishtwar |
| 2 | Construction of protection wall in 1:6 RRM with base pad in 1:4:8 (including dismantling, disposal if any). The Thickness of Base pad is 0.10 mtr. The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 3 | Construction of Drain in 1:6 RRM with base pad in 1:4:8 (including dismantling, disposal if any) .The section of drain is 0.5 MtrX0.5 Mtr. The Thickness of Base pad is 0.20 mtr.The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 4 | Repair of false ceiling of control room building way of |
| 5 | Providing and fixing false ceiling with 12 mm thick plain/ semi perforated or with design ceiling tiles of BWP type phenol formaldehyde syntheticresin bonded pressed particleboard conforming to IS:3087, finished with a coat of aluminum primer on both sides & edges, including two coats of synthetic enamel paint of approved quality on exposedface, fixed to a grid made out of anodized aluminum (with 15 micron anodic coating) Tsections35 x15x1.5 mm size main runners, cross runners 23.5x19x1.5 mm fixed to main runners placed 600 mm centre to centre both ways so as to form a grid of 600 mm square. The framework shall be suspended from ceiling by level adjusting hangers of 6 mm dia M.S rod fixed to roof slab by means of ceiling cleats and dash fastener. The suspenders shall beplaced 600 x 1200 mm centre to centre including fixing to the frame with C.P brass screws and applying a priming coat of zinc chromate yellow primer |
| 6 | Repair of store shed by way of |
| 7 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.10.2.1 Riveted and bolted |
| 8 | Providing corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled withwhite lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface) excluding the cost of purlins, rafters and trusses and including cutting to sizeand shape wherever required. 12.1.1 1.60 mm thick with zinc coating not less than 350gram/m2 |
| 9 | SBA Roof treatment by way of |
| 10 | Demolishing mud phaska in terracing and disposal of material within 50 meters lead |
| 11 | Providing and laying integral cement-based water proofing treatment including preparation of surfaces as required for treatment of roofs, balconies, terraces etc consisting of following operations. a) Applying a slurry coat of neat cement using 2.75kg/sqm of cement admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge over the RCC Slab including adjoining walls upto 300mm height including cleaning the surface before treatment.b) Laying brick bats with mortar using broken bricks/ Brick Bats 25mm to 115mm size with 50% of Cement mortar 1:5 (1 Cement : 5 coarse sand) admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge over 20mm thick layer of cement mortar of mix 1:5 (1 Cement : 5 coarse sand) admixed with water proofing compound conforming to IS 2645 and approved by Engineer in- charge to required slope and treating similarly the adjoining walls up to 300mm height including rounding of Junctions of walls and slabs)c) After two days of proper curing applying a second coat of cement slurry using 2.75kg/sqm of cement admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge. d) finishing the surface with 20mm thick joint less cement mortar of mix 1:4(1 cement: 4 coarse sand) admixed with water proofing compound conforming to IS 2645and approved by Engineer-in-charge including laying glass fibre cloth of approved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300mm/sq 3mm deep) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test. All above operations to be done in order and as directed and specified by Engineerincharge. 23.7.1 With average thickness of 120mm and minimum thickness at khurra as 65 mm |
| 12 | Manufacture, Supply and delivery of Surface mounting LED square (2 feet X 2 Feet) panel light20-24 wattage with inbuilt driver, each assembled on single MCPCB having colortemperature of 6500 K, & having 5000 burning hrs life with minimum @L70 (rated lumenmaintenance life of 70% at 50,000 hours) and should have minimum luminous effeciacy> 100 lm/W. PF 0.95 &THD <10%. The colour rendering index (CRI) of LED light should be more than 80.Housing should be made of CRCA coating with glare free diffused polycarbonate cover.Approved make :- Philips/GE/Crompton Greaves/Osram/Bajaj) |
| 13 | 132/33 KV Grid Sub station Khellani |
| 14 | Construction of protection wall in 1:6 RRM with base pad in 1:4:8 (including dismantling, disposal if any). The Thickness of Base pad is 0.10 mtr. The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 15 | Construction of Drain in 1:6 RRM with base pad in 1:4:8 (including dismantling, disposal if any) .The section of drain is 0.5 MtrX0.5 Mtr. The Thickness of Base pad is 0.20 mtr.The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 16 | Removal of malba from drain in 33kv yard, control room, around sba quarters and 132kv yard avg lead 850mtr |
| 17 | Control Room Roof leakage Repairment by way of (i) Demolishing brick tile covering In terracing Including stacking of serviceable material and disposal of unserviceable material within 50 meters lead.(ii) Demolishing mud phaska in terracing and disposal of material within 50 meters lead(iii) Providing and laying integral cement-based water proofing treatment including preparation of surfaces as required for treatment of roofs, balconies, terraces etc consisting of followingoperations. a) Applying a slurry coat of neat cement using 2.75kg/sqm of cement admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge over the RCC Slab including adjoiningwalls upto 300mm height including cleaning the surface before treatment.b) Laying brick bats with mortar using broken bricks/Brick Bats 25mm to 115mm size with 50% of Cement mortar 1:5 (1 Cement: 5 coarsesand) admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge over 20mm thick layer of cementmortar of mix 1:5 (1 Cement: 5 coarse sand) admixed with water proofing compound conforming to IS 2645 and approved by Engineer in-charge to required slope and treating similarly the adjoining walls upto 300mm height including rounding of Junctions of walls and slabs) c) After two days of proper curing applying a second coat of cement slurry using 2.75kg/sqm of cement admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge. d) finishing the surface with 20mm thick joint less cement mortar of mix 1:4(1 cement: 4 coarse sand) admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge including laying glass fibre cloth of approved quality in top layer of plaster andfinally finishing the surface with trowel with neat cement slurry and making pattern of 300x300mm/sq 3mm deep.e) The whole terrace so finished shall be flooded with water for aminimum period of two weeks for curing and for final test. All above operations to be done in order and as directeda and specified by Engineer in- charge. 23.7.1 With average thickness of 120mm and minimum thickness at khurra as 65 mm |
| 18 | 132/33 KV Grid Sub station Batote |
| 19 | Construction of protection wall in 1:6 RRM with base pad in 1:4:8 (including dismantling, disposal if any). The Thickness of Base pad is 0.10 mtr. The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 20 | Construction of Drain in 1:6 RRM with base pad in 1:4:8 (including dismantling, disposal if any) .The section of drain is 0.5 MtrX0.5 Mtr. The Thickness of Base pad is 0.20 mtr.The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 21 | Repair of false ceiling of control room building way of |
| 22 | Providing and fixing false ceiling with 12 mm thick plain/ semi perforated or with design ceiling tiles of BWP type phenol formaldehyde syntheticresin bonded pressed particle board conforming to IS:3087, finished with a coat of aluminum primer on both sides & edges, including two coats of synthetic enamel paint of approved quality on exposed face, fixed to a grid made out of anodized aluminum (with 15 micron anodic coating) Tsections 35 x15x1.5 mm size main runners, cross runners 23.5x19x1.5 mm fixed to main runners placed 600 mm centre to centre both ways so as to form a grid of 600 mm square. The framework shall be suspended from ceiling by level adjusting hangers of 6 mm dia M.S rod fixed to roof slab by means of ceiling cleats and dash fastener. The suspenders shall be placed 600 x 1200 mm centre to centre including fixing to the frame with C.P brass screws and applying a priming coat of zinc chromate yellow primer |
| 23 | Removal of malba from drain in 33kv yard, control room, around sba quarters and 132kv yard avg lead 850mtr |
| 24 | Manufacture, Supply and delivery of Surface mounting LED square (2 feet X 2 Feet) panel light 20-24 wattage with inbuilt driver, each assembled on single MCPCB having color temperature of 6500 K, & having 5000 burning hrs life with minimum @L70 (rated lumen maintenance life of 70% at 50,000 hours) and should have minimum luminous effeciacy> 100 Im/W. PF 0.95 &THD <10%. The colour rendering index (CRI) of LED light should be more than 80. Housing should be made of CRCA coating with glare free diffused polycarbonate cover. Approved make :- Philips/GE/Crompton Greaves/Osram/Bajaj) Please Enable Macros to View BoQ information |