| 1 | Providing of protection work at location no. 7 of 220 KV S/C Sarna-Udhampur T/L at Udhampur (complete job) |
| 2 | Construction of protection wall in 1:6 RRM with base pad in 1:4:8 (including dismantling, disposal if any). The Thickness of Base pad is 0.10 mtr. The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 3 | Construction of Drain in 1:6 RRM with base pad in 1:4:8 (including dismantling, disposal if any) .The section of drain is 0.5 MtrX0.5 Mtr. The Thickness of Base pad is 0.20 mtr.The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 4 | Construction of platform sealing in 1:2:4 with thickness 0.05 mtr & base pad in 1:4:8 having 0.10 Mtr thickness (including dismantling, disposal if any).The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 5 | Providing and fixing G.I. Flexible crates of size 6mtr x1.5 mtr x1.5 mtr. including supply of G.I. Flexible crates ,stone,hand packing of stone, binding of crates with crate wire (all materials are to be provided by the contractor).The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, completion in all respect |
| 6 | Providing of protection work at location no. 12 of 220 KV S/C Sarna-Udhampur T/L at Udhampur (complete job) |
| 7 | Construction of protection wall in 1:6 RRM with base pad in 1:4:8 (including dismantling, disposal if any). The Thickness of Base pad is 0.10 mtr. The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 8 | Construction of Drain in 1:6 RRM with base pad in 1:4:8 (including dismantling, disposal if any) .The section of drain is 0.5 MtrX0.5 Mtr. The Thickness of Base pad is 0.20 mtr.The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 9 | Construction of platform sealing in 1:2:4 with thickness 0.05 mtr & base pad in 1:4:8 having 0.10 Mtr thickness (including dismantling, disposal if any).The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 10 | Providing of protection work at location no. 26 of 220 KV S/C Sarna-Udhampur T/L at Udhampur (complete job) |
| 11 | Construction of Drain in 1:6 RRM with base pad in 1:4:8 (including dismantling, disposal if any) .The section of drain is 0.5 MtrX0.5 Mtr. The Thickness of Base pad is 0.20 mtr.The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 12 | Providing and fixing G.I. Flexible crates of size 6mtr x1.5 mtr x1.5 mtr. including supply of G.I. Flexible crates ,stone,hand packing of stone, binding of crates with crate wire (all materials are to be provided by the contractor).The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, completion in all respect |
| 13 | Providing of protection work at location no. 58 of 220 KV S/C Sarna-Udhampur T/L at Udhampur (complete job) |
| 14 | Construction of Drain in 1:6 RRM with base pad in 1:4:8 (including dismantling, disposal if any) .The section of drain is 0.5 MtrX0.5 Mtr. The Thickness of Base pad is 0.20 mtr.The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 15 | Construction of platform sealing in 1:2:4 with thickness 0.05 mtr & base pad in 1:4:8 having 0.10 Mtr thickness (including dismantling, disposal if any).The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 16 | Providing of protection work at location no. 59 of 220 KV S/C Sarna-Udhampur T/L at Udhampur (complete job) |
| 17 | Construction of Drain in 1:6 RRM with base pad in 1:4:8 (including dismantling, disposal if any) .The section of drain is 0.5 MtrX0.5 Mtr. The Thickness of Base pad is 0.20 mtr.The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 18 | Construction of platform sealing in 1:2:4 with thickness 0.05 mtr & base pad in 1:4:8 having 0.10 Mtr thickness (including dismantling, disposal if any).The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 19 | Providing of protection work at location no. 67 of 220 KV S/C Sarna-Udhampur T/L at Udhampur (complete job) |
| 20 | Construction of protection wall in 1:6 RRM with base pad in 1:4:8 (including dismantling, disposal if any). The Thickness of Base pad is 0.10 mtr. The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 21 | Construction of platform sealing in 1:2:4 with thickness 0.05 mtr & base pad in 1:4:8 having 0.10 Mtr thickness (including dismantling, disposal if any).The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 22 | Providing of protection work at location no.215 of 220 KV S/C Sarna-Udhampur T/L at Udhampur (complete job) |
| 23 | Construction of Drain in 1:6 RRM with base pad in 1:4:8 (including dismantling, disposal if any) .The section of drain is 0.5 MtrX0.5 Mtr. The Thickness of Base pad is 0.20 mtr.The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 24 | Construction of platform sealing in 1:2:4 with thickness 0.05 mtr & base pad in 1:4:8 having 0.10 Mtr thickness (including dismantling, disposal if any).The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 25 | Providing of protection work at location no. 298 of 220 KV S/C Sarna-Udhampur T/L at Udhampur (complete job) |
| 26 | Construction of protection wall in 1:6 RRM with base pad in 1:4:8 (including dismantling, disposal if any). The Thickness of Base pad is 0.10 mtr. The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 27 | Construction of platform sealing in 1:2:4 with thickness 0.05 mtr & base pad in 1:4:8 having 0.10 Mtr thickness (including dismantling, disposal if any).The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 28 | Providing of protection work at location no. 316 of 220 KV S/C Sarna-Udhampur T/L at Udhampur (complete job) |
| 29 | Construction of protection wall in 1:6 RRM with base pad in 1:4:8 (including dismantling, disposal if any). The Thickness of Base pad is 0.10 mtr. The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 30 | Construction of platform sealing in 1:2:4 with thickness 0.05 mtr & base pad in 1:4:8 having 0.10 Mtr thickness (including dismantling, disposal if any).The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, farm work, curing and completion in all respect |
| 31 | Providing and fixing G.I. Flexible crates of size 6mtr x1.5 mtr x1.5 mtr. including supply of G.I. Flexible crates ,stone,hand packing of stone, binding of crates with crate wire (all materials are to be provided by the contractor).The job includes exacavation, providing & supply of all constructional material, Mechanical & Manual transport, completion in all respect Please Enable Macros to View BoQ information |