| 1 | PART-A(Pole and Fittings)Supply, Installation of 9mtr Long 300kg PSC Pole as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in- charge. |
| 2 | Supply, Fabrication and Installation of 11mtr long 150x150mm GI joist pole as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in- charge. |
| 3 | Supply, Fabrication and Installation of 11mtr long 100x116mm RS joist pole as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in- charge. |
| 4 | Supply and Installation of common materials for Construction o of new 11KV Single Pole Cut-Point with double disc arrangement using 11mtr. long 150X150mm RS Joist Pole support. (Excluding cost of Pole) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 5 | Supply and Installation of common materials for Erection of Intermediate Pin Point Pole for 11KV Line using polymer type pin insulator & llmtr. long 150X15Omm RS ]oist Pole support. (Excluding cost of Pole) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 6 | Supply and Installation of common materials for Erection of Intermediate Pin Point Pole for 11KV Line using polymer type pin insulator & llmtr. long 150X15Omm RS ]oist Pole support. (Excluding cost of Pole) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 7 | Supply and Installation of common materials for construction of 11KV HT line using l00mm2 AAA conductor & 11Mtr. Long 150x150mm RSJ pole (40- meter spans) using polymer type insulator & 11mtr long150mmx150mm RS Joist Pole. (Only Cost of Conductor) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 8 | Supply and Installation of Cost of common materials for Erection of Single circuit LT lineliicluding 08nos. NH crossing using 9mm2 3ph5w AB cable, 9mtr., long300Kg PSC Pole & 116x100mm RS joist (11 Mtr long )23.0kg/Mtr (Each 207/253 kg) at the road cross (30-meterspan for the LT Line(excluding Cost of Pole) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 9 | PART-B(Civil Work)Civil Charges for erection Pole forthree pole Structure including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 10 | Civil cost including pole Concreting, Couping & Stay concreting for 11KV Line slngle pole Cut-point. including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 11 | Civil cost including pole Concreting, Couping & Stay concreting for 11KV Line slnglepin point Intermediate pole including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 12 | Civil cost including pole Concreting, Couping & Stay concreting for LT Line including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 13 | Labour Charges for Dismentalling of Existing 3ph 3wire 11KV Bare Conductor |
| 14 | Labour Charges for Dismentalling of Existing 3ph 5wireAB cable LT Line Please Enable Macros to View BoQ information |