| 1 | Dismantling of damaged Laterite stone masonnary works under 3.00 Mtr. Height including stacking the useful materials for reuse etc all charges and removing these within initial lead of 50.00 mtr etc complete. |
| 2 | Dismantling of damaged condition of Cement concrete of road including stacking the useful materials for reuse etc all charges and removing these within initial lead of 50.00 mtr etc complete. |
| 3 | Dismantling of damaged condition of Cement concrete of road including stacking the useful materials for reuse etc all charges and removing these within initial lead of 50.00 mtr etc complete. |
| 4 | Earth work in excavation of founation in hard soil or gravelly soil including dressing and levelling the bed not exceeding 1.5m initial depth and depositing the soil within initial lead of 50m and as per specification approved by the Department. (F&P) |
| 5 | Carriage of excavated earth away from work site to out site by mechanical means including loading & unloading and dumping within 5 Km lead etc complete as per direction of Engineer -in- charge. |
| 6 | Providing, supplying, filling in foundation and plinth with sand including watering and ramming with cost, conveyance, royalty, taxes of all materials with all labour, T&P etc complete. |
| 7 | Cement concrete of proportion (1:4:8) in F&P using 40mm size HBHG metal of approved quality including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect . |
| 8 | Cement concrete of proportion (1:2:4) using 12mm size cb chips of approved quality including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect. |
| 9 | R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2” to ¾”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion in all respects as per direction of Engineer in charge but excluding cost of M.S rod / Tor steel and binding wires and labour charges for bending, binding wires and labour charges for bending, binding and tying the grills. |
| 10 | Rigid smooth centering and shuttering for R.C.C. works including false works and dismentalling then after casting including cost of materials complete in ground floor. |
| 11 | Straightening, cutting, bending and binding, welding and jointing (if necessary ) coiled/ bent up MS Rods /Tor Steel/deformed rods etc. including hoisting, placing in position, tying the grills binding with 18 to 20 gauge binding wire required for R.C.C work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete (weight of binding wire will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S rods or Tor steel linear measurements of rod for finished item of works. 5% wastage and lap length are included in the finished rate). |
| 12 | Add cost of display board and photographs (Pre, during & post) Please Enable Macros to View BoQ information |