| 1 | Checking of all existing rivets, screws and re-fixing the same with new rivets and screws with use of leak proof compound where ever required. It includes cost of removal of defective rivets, screws, cost of new rivets, screws and there replacing by new rivets/screws whenever and wherever report without any extra cost/charges. It includes cost of material, labour or other inputs required for the work. 12 feet long boat |
| 2 | Checking of all existing rivets, screws and re-fixing the same with new rivets and screws with use of leak proof compound where ever required. It includes cost of removal of defective rivets, screws, cost of new rivets, screws and there replacing by new rivets/screws whenever and wherever report without any extra cost/charges. It includes cost of material, labour or other inputs required for the work. 20 feet long boat |
| 3 | Checking of all existing rivets, screws and re-fixing the same with new rivets and screws with use of leak proof compound where ever required. It includes cost of removal of defective rivets, screws, cost of new rivets, screws and there replacing by new rivets/screws whenever and wherever report without any extra cost/charges. It includes cost of material, labour or other inputs required for the work. 25 feet long boat |
| 4 | Complete painting of bottom and upper floors of boats with water proof rubber paint including cost of paint, labour and other inputs involved for the work including preparation of surface etc. complete. 12 feet long boat |
| 5 | Complete painting of bottom and upper floors of boats with water proof rubber paint including cost of paint, labour and other inputs involved for the work including preparation of surface etc. complete. 20 feet long boat |
| 6 | Complete painting of bottom and upper floors of boats with water proof rubber paint including cost of paint, labour and other inputs involved for the work including preparation of surface etc. complete. 25 feet long boat |
| 7 | Fixing of wooden head on the nose end of the boat by removing of rivets from aluminium sheet changing the wooden packing by replacing new packing, making hole in aluminium sheet new wooden packing and wooden head for inserting bolts and nuts of length 6\\" to 8\\" as per requirement for holding wooden head in its position, including making good the aluminium boat by moulding the aluminium sheet to its original position and riveting etc. complete including cost of materials, labour and other incidental inputs involved for carry out this work. 12 feet long boat |
| 8 | Fixing of wooden head on the nose end of the boat by removing of rivets from aluminium sheet changing the wooden packing by replacing new packing, making hole in aluminium sheet new wooden packing and wooden head for inserting bolts and nuts of length 6\\" to 8\\" as per requirement for holding wooden head in its position, including making good the aluminium boat by moulding the aluminium sheet to its original position and riveting etc. complete including cost of materials, labour and other incidental inputs involved for carry out this work. 20 feet long boat |
| 9 | Fixing of wooden head on the nose end of the boat by removing of rivets from aluminium sheet changing the wooden packing by replacing new packing, making hole in aluminium sheet new wooden packing and wooden head for inserting bolts and nuts of length 6\\" to 8\\" as per requirement for holding wooden head in its position, including making good the aluminium boat by moulding the aluminium sheet to its original position and riveting etc. complete including cost of materials, labour and other incidental inputs involved for carry out this work. 25 feet long boat |
| 10 | Painting whole body of boats by aluminium paint including cost of aluminium paint and labour etc. involved for the work. 12 feet long boat |
| 11 | Painting whole body of boats by aluminium paint including cost of aluminium paint and labour etc. involved for the work. 20 feet long boat |
| 12 | Painting whole body of boats by aluminium paint including cost of aluminium paint and labour etc. involved for the work. 25 feet long boat |
| 13 | Lettering the name of department and division with enamel paint on the outer surface of boats including cost of enamel paint, labour and other incidental charges complete. 12 feet long boat |
| 14 | Lettering the name of department and division with enamel paint on the outer surface of boats including cost of enamel paint, labour and other incidental charges complete. 20 feet long boat |
| 15 | Lettering the name of department and division with enamel paint on the outer surface of boats including cost of enamel paint, labour and other incidental charges complete. 25 feet long boat |
| 16 | Removing of old damaged Salwood Gutka and providing new Salwood Gutka with nut boats and washer complete. Scope includes cost of material, labour and other incidental charges complete. 12 feet long boat |
| 17 | Removing of old damaged Salwood Gutka and providing new Salwood Gutka with nut boats and washer complete. Scope includes cost of material, labour and other incidental charges complete. 20 feet long boat |
| 18 | Removing of old damaged Salwood Gutka and providing new Salwood Gutka with nut boats and washer complete. Scope includes cost of material, labour and other incidental charges complete. 25 feet long boat |
| 19 | Replacing damaged aluminium gola on the bottom side of the boats including cost of inner side wood and top side aluminium sheet, labour and other inputs involved in the execution of work.12 feet long boat |
| 20 | Replacing damaged aluminium gola on the bottom side of the boats including cost of inner side wood and top side aluminium sheet, labour and other inputs involved in the execution of work. 20 feet long boat |
| 21 | Replacing damaged aluminium gola on the bottom side of the boats including cost of inner side wood and top side aluminium sheet, labour and other inputs involved in the execution of work. 25 feet long boat |
| 22 | Repair of all seat and replacing the broken damaged seat wherever required. It is includes cost of material, labour and all other inputs required for the work. 12 feet long boat |
| 23 | Repair of all seat and replacing the broken damaged seat wherever required. It is includes cost of material, labour and all other inputs required for the work. 20 feet long boat |
| 24 | Repair of all seat and replacing the broken damaged seat wherever required. It is includes cost of material, labour and all other inputs required for the work. 25 feet long boat |
| 25 | Removing of damaged boat handles and fixing new boat handles, with nuts bolts and washer complete and changing of wooden cleats wherever required including making holes in the handles casted including cost of all material andlabour complete. 12 feet long boat |
| 26 | Removing of damaged boat handles and fixing new boat handles, with nuts bolts and washer complete and changing of wooden cleats wherever required including making holes in the handles casted including cost of all material andlabour complete. 20 feet long boat |
| 27 | OBM transom repair with aluminium sheet and wood including cost of labour, material and other incidental charges involved in the work. 20 feet long boat |
| 28 | OBM transom repair with aluminium sheet and wood including cost of labour, material and other incidental charges involved in the work. 25 feet long boat |
| 29 | Repair of buoyancy system of boats (system enables the boats to float at water level in case of drowing) by replacing the old thermacol sheet fixed underneath the seats of boat by new water proofing foam by opening the seats after removing the aluminium sheet and trnsforling it to its original shape after changing the damaged theracol including changing the water proof ply of seats as required with cost of labour and material involved in completion of work etc. complete. 12 feet long boat |
| 30 | Repair of buoyancy system of boats (system enables the boats to float at water level in case of drowing) by replacing the old thermacol sheet fixed underneath the seats of boat by new water proofing foam by opening the seats after removing the aluminium sheet and trnsforling it to its original shape after changing the damaged theracol including changing the water proof ply of seats as required with cost of labour and material involved in completion of work etc. complete. 20 feet long boat |
| 31 | Repair of buoyancy system of boats (system enables the boats to float at water level in case of drowing) by replacing the old thermacol sheet fixed underneath the seats of boat by new water proofing foam by opening the seats after removing the aluminium sheet and trnsforling it to its original shape after changing the damaged theracol including changing the water proof ply of seats as required with cost of labour and material involved in completion of work etc. complete. 25 feet long boat |
| 32 | Replacing 2.5\\" width and I\\" thick sal wood gola on the bottom side of the boats including cost of sal wood gola, labour and other inputs involved in the execution of work. 12 feet long boat |
| 33 | Replacing 2.5\\" width and I\\" thick sal wood gola on the bottom side of the boats including cost of sal wood gola, labour and other inputs involved in the execution of work. 20 feet long boat |
| 34 | Replacing 2.5\\" width and I\\" thick sal wood gola on the bottom side of the boats including cost of sal wood gola, labour and other inputs involved in the execution of work. 25 feet long boat |
| 35 | Repair of border of the boat by removing of damaged aluminium sheet and wooden batten and fixing of new wooden batten and aluminiun sheet with steel screws and nails including cost of materials labour andother incidental charges complete. 12 feet long boat |
| 36 | Repair of border of the boat by removing of damaged aluminium sheet and wooden batten and fixing of new wooden batten and aluminiun sheet with steel screws and nails including cost of materials labour andother incidental charges complete. 20 feet long boat |
| 37 | Repair of border of the boat by removing of damaged aluminium sheet and wooden batten and fixing of new wooden batten and aluminiun sheet with steel screws and nails including cost of materials labour andother incidental charges complete. 25 feet long boat |
| 38 | Providing and fixing Tochen Hook. Providing and fixing Tochen Hook. 12 feet long boat |
| 39 | Providing and fixing Tochen Hook. Providing and fixing Tochen Hook. 20 feet long boat |
| 40 | Providing and fixing Tochen Hook. Providing and fixing Tochen Hook.25 feet long boat |
| 41 | Painting with ready mixed paint of approved brand and manufacture in all shades. Small size trolly |
| 42 | Lettering of following words with enamel paint on each paint on each boat trolly \\"Executive Engineer, Civil Division-III, Irrigation and Flood Control Deptt., Govt. of NCT of Delhi. The size of words/alphabets shall be decided by Engineer-in-charge, according to location of writing place and space available. |
| 43 | Providing and fixing new wheel rim for small size trolley. |
| 44 | Wheel overhauling including changing of bearing, repairing of hub, change of nut bolts complete. |
| 45 | Providing and fixing wooden levelling plate with rubber top fitted with screw in boat carriage trolley including cost of material labour charges and all other incidental charges etc. complete. |
| 46 | Providing and fixing new pipe rollers with nuts and bolts and angles welded in position including cost of material, labour charges etc. complete. |
| 47 | Opening erecting and refitting of Kamanies in position including change of pins, greasing etc. complete, it includes cost of dismembering/repairing and reasembling, cost of labour charges and other incidental charges etc. complete. Please Enable Macros to View BoQ information |