| 1 | Item Description/ Heading |
| 2 | Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required. above 8.0 metre and upto 10.0 metre |
| 3 | Supplying of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per metre) cross arm for 4 wireover head line complete with clamps, bolts, nuts and washer etc including drilling of holesfor insulator pins etc (as per drawing) and painting with primer and finished paint as required |
| 4 | Supplying of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per metre) cross arm for 2 wireover head line complete with clamps, bolts, nuts and washer etc including drilling of holesfor insulator pins etc (as per drawing) and painting with primer and finished paint as required |
| 5 | Erection of angle iron/ channel iron cross arm on wood/ RCC/ PCC/ steel tubular/ rail poleetc. as required |
| 6 | Supplying and erection of 100 mm X 65 mm pin insulator complete with G. I. Spindle and nuts etc. as required |
| 7 | Supplying and erection of 100 mm X 110 mm shackle insulator with G. I. Bolt, nuts and strapsetc. as required |
| 8 | Erection of LV/MV shackle/pin insulator etc. as required. |
| 9 | Erection of ACSR conductor of 7/2.11 mm to 7/3.00 mm diameter including binding etc, as required |
| 10 | Erection of G.I. Wire No. 8 SWG including binding etc. as required. |
| 11 | Supplying and erection of stay set complete (galvanised) with 19/20 mm dia X 1.8 metreslong stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm, thimble, stay clamps, turn buckle( 20 mm X 60 cm), 7/ 4.00 mm dia G.I. stay wire and strain insulator etc in cement concrete1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size )foundation including excavation and refilling etc. as required. |
| 12 | Earthing with G.I. earth pipe 4.5 metre long, 40 mm dia including accessories, and providingmasonry enclosure with cover plate having locking arrangement and watering pipe etc.with charcoal/ coke and salt as required. |
| 13 | Supplying and laying 25 mm X 5 mm copper strip at 0.50 metre below ground as stripearth electrode, including connection/ terminating with nut, bolt, spring, washer etc. asrequired. (Jointing shall be done by overlapping and with 2 sets of brass nut bolt & spring washer spaced at 50mm) |
| 14 | Erection of cradle guard as required. |
| 15 | Erection of PVC Wire ( From 2.5 sq mm to 10 sq mm) for supplying power through metallic tower, stand poles, stadium towers for illumination. |
| 16 | Erection/Dismantling of 1x1000watt/1 x 400 Watt/1 x 250Watt light fitting on steel pole of length exceeding 8mtrs but not exceeding 10 mtr |
| 17 | Dismantling of over head lines comprising of copper/ aluminium over head conductor, Cl. wire, cross arms, insulators etc. as required |
| 18 | Dismantling of pole/ street light standard/ strut embedded in cement concrete foundation etc. as required |
| 19 | Supply of 8 SWG G.I. Wire |
| 20 | Supply of 10 sq mm Service Wire |
| 21 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC Please Enable Macros to View BoQ information |