| 1 | Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 meters and lead upto 30 meters and including filling, watering and ramming of excavated earth into the trenches or into the space between the builiding and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 meters from the foundation trenches (SI. No. 251) UPPWD SOR-20221-Coloumn Footing 2-Long Wall3-Short wall |
| 2 | Filling with good quality earth brought from outside approved borrow area, including cost of earth, royalty, loading, transportation, unloading, spreading in layers not exceeding 20 cm thickness, watering, ramming and compaction by manual/mechanical means to achieve desired compaction and level, complete in all respects as directed by the Engineer-in-Charge.\\" |
| 3 | Concrete with 4 cm guage stone ballast, coarse sand and cement in proportion of 8:4:1 in foundation and under floors including supply of all material, labour, T&P etc. required for proper completion of the work. (SI. No. 281 ) 20221-Coloumn Footing 2-Long Wall3-Short wall |
| 4 | R.C.C. work with cement approved coarse sand & 2 cms. Guage approved crushed stone grit in proportion of 1:1.5:3 in Raft foundation windows and sunshades excluding supply of reinforncement and its bending but including its fixing & binding the same with 24 BWGGI binding wire & including necessary centering & shuttering etc. required for proper completion of work. Binding wire is to be supplied by the contractor free of cost. .UPPWD (SI. No. 287) SOR 2022 |
| 5 | R.C.C. work with cement approved coarse sand & 2 cms. Guage approved crushed stone grit in proportion of 1:1.5:3 in Columan windows and sunshades excluding supply of reinforncement and its bending but including its fixing & binding the same with 24 BWGGI binding wire & including necessary centering & shuttering etc. required for proper completion of work. Binding wire is to be supplied by the contractor free of cost. .UPPWD (SI. No. 289) SOR 20221-Upto Ground Floor 2-G.F Slab To F.Floor Slab |
| 6 | R.C.C. work with cement approved coarse sand & 2 cms. Guage approved crushed stone grit in proportion of 1:1.5:3 in Beam windows and sunshades excluding supply of reinforncement and its bending but including its fixing & binding the same with 24 BWGGI binding wire & including necessary centering & shuttering etc. required for proper completion of work. Binding wire is to be supplied by the contractor free of cost. .UPPWD (SI. No. 285) SOR 2022 |
| 7 | M-150 brick work in 1:4 (One part of cement and Four part of coarse sand of 2.75 F.M.) cement mortar in foundation and plinth including supply of all material, labour, T&P etc. required for proper completion of the work. (SI. No. 305) SOR 2022IN |
| 8 | Same as above item No. 4 but in super structure in 1:4 cement & coarse sand etc (SI. No. 305+ 310)PWD SOR 2022 |
| 9 | R.C.C. work with cement approved coarse sand & 2 cms. Guage approved crushed stone grit in proportion of 1:1.5:3 in Beam windows and sunshades excluding supply of reinforncement and its bending but including its fixing & binding the same with 24 BWGGI binding wire & including necessary centering & shuttering etc. required for proper completion of work. Binding wire is to be supplied by the contractor free of cost. .UPPWD (SI. No. 285) SOR 20221-Shopes G.F2-Slabe beam |
| 10 | Mild Steel (Tor steel of plain) in plain work such asR.C.C. or R.B. work including bending for proper shape and including supply of steel and its wastage, bend hooks and authorised overlapping shall be measured UPPWD (SI. No. 504) SOR 2022Slab And Beam As Per RCC 1.5% |
| 11 | 12 mm thick plaster with 1:4 (one part cement and Four parts of Coarse sand of 2.75 F.M.) over brick work minimum thickness not to be less than 1 cms. Including supply of material, labour, T&P etc. required for proper completion of the work. UPPWD(SI. No. 584) SOR 2022 |
| 12 | Finishing walls with Acrylic Smooth exterior paint of required shade New work (Two or more coat applied @ 1.67 Ltr / 10 sqm over and including priming coat of exterior primer applied @ 2.20 KG / 10 Sqm) Item No. 13.46.1 DSR 2021As per Plaster |
| 13 | Distempering Two coat with oil bound distemper of approved brand and manufacture and required shade on and undecorated wall surface to with an even shade over and including a primer coat with cement primer of approved brand and manufacture such as of British, Shalimar asian paint after throughtly brushing the surface free from including preparing the surface even and sand prepared smooth including cost of all materials.(SI No. 649 + 650)SOR/2022As per Plaster |
| 14 | Providing and fixing birla putty plaster of paris of 2mm thick over plastered surface to prepare the surface even and smooth complete Sh. No. 13.26DSR 2021As per Plaster |
| 15 | Providing an laying \\"brick coba\\" 12mm thick laid with M-150 class brick bat coba 7.50 cm thick with gap of 15mm to each other, over 20mm thick base of cement mortar 1:4 cement and coarse sand mixed with water proofing compound spreading cement slurry mixed with aerelic cement concrete water proofing compound filled gaps of coba & top of coba mortar mixed with water proofing compound in 1:4 cement and coarse sand mortar finished smooth & top mashed false square 30cm ×30cm and side wall parapet shall be mono tythic plaster wall upto 30 cm higher and junction and corner shall be rounded by brick ballast cement and coarse sand masonary Coba with top finished plaster mixed with acetic water proofing compound @2% by weight & including S/o all material, labour, T&P etc complete for proper comletion of work. SOR 2022 New item No. 3 |
| 16 | LayingVitrified tiels |
| 17 | item no. Same and 3 But in Dado @ 10% |
| 18 | Providing & fixing of interlocking CC tiels 80 mm thick m-30 grade over 20 to 40 mm sand layer and joint fulled by dry fine sand ncluding all cost |
| 19 | Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters. 80x1.25 mm M.S. laths with 1.25 mm thick top cover |
| 20 | Providing and fixing ball bearing for rolling shutters. |
| 21 | Electric Work and High Mask Light Project Cost @ 7% Please Enable Macros to View BoQ information |