| 1 | (1001)Excavation in foundation in ordinary soil (loam,clay or sand ) including lift up to 1.50 m& lead up to 50 m,refilling,watering and ramming of evcavated earth into the trenches or space betwwen the building and sides of foundation trenches or into the plinth and disposal of surplus earth up to the distance of 50 mfrom the center of the foundation trenches. |
| 2 | (1017) Concrete with 40 mm gauge brick ballast,local sand and cement in proportion in 8:4:1 in foundation including supply of all material,labour T & P etc. required for proper completion of work. |
| 3 | (1031) Ist. Class brick work in 1:4 cement and local mortar in foundation and plinth including supply of all material,labour T & P etc. required for proper completion of work. |
| 4 | (1054) 20 mm thick D.P.C.with cement and approved coarse sand 1:2 including 5% water proofing material or in proportion as specied by the manufactures including supply of all material,labour T & P etc. required for proper completion of work. |
| 5 | (1031+1035+1036) Ist. Class brick work in 1:6 cement and local mortar in super structure including supply of all material,labour T & P etc. required for proper completion of work.Ist. |
| 6 | (1149) Supply and fixing of M.S. angle iron chaukhats of 40 mm x40 mmx5 mm with M.S. sheet door shutter including simple moulding straightg work as in chaukhats and also supply of all material,labour T & P etc. required for proper completion of work. |
| 7 | Fixing of hold fast of doors and windows chaukhats already moulded on chaukhats in P.C.C. 1:2:4 etc.required in all respect to complete the work. |
| 8 | (1019) R.C.C. work with cement,coarse sand and 20 mm gauge approved stone ballast in proportion of 1:1.5:3 in sun shed and lintel on doors and windows excluding supply of reinforcement and its bending but including its fixing and binding the same with 0.50 mm thick binding wire and the cost of binding wire and including necessary centering and shuttering supply of all material,labour T & P etc. required for proper completion of work. |
| 9 | (1024) Same as item no.1017 but in slab of pump house |
| 10 | (1151) M. S. or iron work in plain work such as R.C.C.or R.B. work (when not included in over all rates) brought to required shape as necessary including bending for proper completion of the work including supply of steel and its wastage. |
| 11 | Supply and fixing of Z- Section section window frames and Shutters openable outside as per drawing and design approved by E/I, hinges of approved quality,M.S. or C.I. handles,hold fast 4 nos of M.S. flat25x5 mm and 150 mm long, pegs of M.S. 30 cm long having 4 holes with pagester and brackets welded or riveted to frame complete including the cost of Glass Panes & including supply of all material,labour T & P etc. required for proper completion of work. |
| 12 | (1188) 12 mm thick plaster with cement and local sand mortar I:4 over brick work minimum thickness not to be less than 10 mm including supply of all material,labour T & P etc. required for proper completion of work. |
| 13 | Same as item no. 13 but in 1:4 cement sand mortar but over ceiling including supply of all material,labour T & P etc. required for proper completion of work. (1188+1191) |
| 14 | Supply and fixing of 22 mm wide glass strips in panels including supply of all material,labour T & P etc. required for proper completion of work. |
| 15 | (1202) 25 mm thick 1:2:4 plain cement concrete floor with cement coarse sand and 20 mm gauge stone ballast laid in pannels finished with 3 mm floating coat of neat cement or cement and marble dust in ratio 1:5 as specified and removing any overlaping or mortar at the joints of panels if any and giving them uniform finish including supply of all material,labour T & P etc. required for proper completion of work. including |
| 16 | (1232 & 1233) Painting or varnishing new work or new wood work in small areas with one priming coat and two coat of approved quality paint or varnish including supply of all material,labour T & P etc. required for proper completion of work. |
| 17 | (1253) White washing three coat including supply of all material,labour T & P etc. required for proper completion of work. |
| 18 | (MR) Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all material,labour T & P etc. required for proper completion of work. |
| 19 | (1146 + 1149) Supply and fixing of Girder of 250 mmx125 mm size over the pumt house including its painting with approved quality paint and also one priming coat.ISMB 250x125 @37.30kg/m |
| 20 | (1004) Sand filling in plinth in pumpm house and chloronating room including supply of all material,labour T & P etc. required for proper completion of work. |
| 21 | Supply and lay 4 cm thick insulation layer of sand and clay over R.C.C. roof including supply of all material,labour T & P etc. required for proper completion of work. |
| 22 | Supply cutting and dressing with size and fixing V-Notch of size 90 x90 cm in the by pass chamber as per direction of E/I including supply of all material,labour T & P etc. required for proper completion of work. |
| 23 | Mud Faska on R. B. or R.C.C. Roof with 100 mm thick clay layer on roof and laying of tiles and jointing them with cement and sand mortar including supply of all material,labour T&P etc. complete. |
| 24 | Supply & Fix 110 mm dia P.V.C. down pipes complete with rose & bend and gratings with M.S. clamps 25 X 3 mm fixed on walls & supply of 150 mm long, 6 mm dia nails complete. |
| 25 | Construction of R.C.C. manhole cover 70x70 cm for opening in roof slab and fixing it at opening including supply of all material,labour T&P etc. complete. |
| 26 | Making openig in walls of size 30x30 cm and fixing of R.C.C. jalies and plastering the same including supply of all material,labour T&P etc. complete. |
| 27 | Earth filling in plinth including cartage up to site of work complete. |
| 28 | (1143) Supply and Fixing of oxidised Iron Fitting of Approved Make For Doors and Windows |
| 29 | Site clearance and other unforeseen items |
| 30 | ADD 1% Labour Cess GST Please Enable Macros to View BoQ information |