|
| 1 | Carriage of followings from ESC BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, required completion of work, distance about to 0 to 70 Km. approx. |
| 2 | STP 9/11 mtr Long from E.S.C Bulandshahr to Site |
| 3 | PCC 11 mtr Long from E.S.C Bulandshahr to Site |
| 4 | PCC 8.5/9 mtr from E.S.C Bulandshahr to Site |
| 5 | CT/PT unit Deffrent spacification from ESC. BSR to site |
| 6 | Piffer ressitant metering cubicle from ESC. BSR to site including loading & unloading with the help of Crane. |
| 7 | Cable 3x70 sqmm 11 KV XLPE from E.S.C Bulandshahr to Site including loading & unloading with the help of Crane. (sutable for one connection) |
| 8 | Carrage 10/16 kva TF |
| 9 | Carrage 25/63/100 kva TF |
| 10 | Carriage of All line Material from store to site or j.e's store at Sub station as ACSR Weasel conductor, GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator & Pin Insulator etc. |
| 11 | Carriage & Erection of 11 KV VCB (Incoming/Outgoing) |
| 12 | Erection of Single support including complete LT/HT fittings as per RESPO PCC 11 mtr long. |
| 13 | Erection of Single support PCC 8.5/9 mrt long/ STP 9 mtr/ STP 11 mtr. including complete LT/HT fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 14 | Erection of Double Pole support including complete fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 15 | Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 16 | Grouting of Double pole support shall be grouted with cement, sand and birck ballast/stone ballast in including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 17 | Grouting of D/P for installation of CT/PT unit & T/F shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 18 | Fixing of Stay rod with Stay wire in proper way with Nozelling. |
| 19 | Mounting & Installation 25/63./100 kva T/F on the double Pole |
| 20 | Grouting of Stay rods. |
| 21 | Fixing of erathing rod. |
| 22 | Laying of 3x70 sqmm 11KV XLPE cable openly from CT PT unit to meter room putting sand around the cable Fixing of bricks in both sides & top and refilling of trench and its proper ramming including providing necessary loop on both sides. |
| 23 | Laying of 3x70 sqmm 11KV XLPE cable putting sand around the cable Fixing of bricks in both sides & top and refilling of trench and its proper ramming including providing necessary loop on both sides. |
| 24 | Laying, sagging. Stringing and binding and jumpering of ACSR weasel, rabbit, dog newly erected poles as per RESPO manual and as per direction of Supervising Engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work. |
| 25 | Mounting CT/PT unit on D/P with the help of Crane. |
| 26 | Providing & Fixing of Cable Box suitable for 3X70 sqmm 11KV XLPE. |
| 27 | Wrapping of Barbed wire |
| 28 | Providing & Fixing Holding Clamps. |
| 29 | Laying and ABC Cable |
| 30 | Providing & Fixing Stay Clamps. |
| 31 | Providing & Fixing Stay Insulator. |
| 32 | Providing Nut & Bolts off-size |
| 33 | Installation & Errection of Piffer ressitant metering cubicle . |
| 34 | Garding of 11 kv line/ road crossing as per site requarment. |
| 35 | Extra Milage charges and carriage from PCC/ST Pole/TF & other material from each 10 Km. |
| 36 | Above work shall be done as per UPPCL/RESPO Rules. Please Enable Macros to View BoQ information |