|
| 1 | Carriage of followings from ESC BSR to pit site on kachcha pakkaa road including loading and unloading chagres at both ends, required completion of work, distance about to 0 to 70 Km. approx. |
| 2 | 11 KV Disc Insulator with Fitting |
| 3 | 11 KV Pin Insulator with Pin |
| 4 | 33 KV Disc Insulator with Fitting |
| 5 | 33 KV Pin Insulator with Pin |
| 6 | 33 KV Cross ARM |
| 7 | 11 KV Cross ARM |
| 8 | ACSR Dog Conductor |
| 9 | ACSR Weasel Conductor |
| 10 | ACSR Rabbit Conductor |
| 11 | Earthing Complete |
| 12 | Guarding Wire 6'8SWG |
| 13 | Guarding Angle |
| 14 | LT AB 3X95 sq mm |
| 15 | LT AB 3X120 sq mm |
| 16 | 11 kv 3*300 SQ MM XLPE CABLE |
| 17 | O/D CABLE JOINTING KIT |
| 18 | DROPER CHANNEL |
| 19 | PCC POLE 11 Mtr Long |
| 20 | PCC POLE 8.5 Mtr Long |
| 21 | Stay Set Complete 33 KV |
| 22 | Stay Set Complete 11 KV |
| 23 | STP POLE 11 Mtr Long |
| 24 | STP POLE 13 Mtr Long |
| 25 | T-off Channel |
| 26 | Top Channel 125x65mm 33 KV |
| 27 | DISTRIBUTION BOX 3 PHASE WITH CLAMP |
| 28 | Top Channel 125x65mm 11 KV |
| 29 | The following material Erection & Fixing as per RESPO manual andas per direction fo Supervising Engineer. It includes the cost of labour, T&P, Carrier etc. required for proper completion of work. |
| 30 | 11 KV Disc Insulator with Fitting |
| 31 | 11 KV Pin Insulator with Pin |
| 32 | 33 KV Disc Insulator with Fitting |
| 33 | 33 KV Pin Insulator with Pin |
| 34 | 33 KV Cross ARM |
| 35 | 11 KV Cross ARM |
| 36 | ACSR Dog Conductor |
| 37 | ACSR Weasel Conductor |
| 38 | ACSR Rabbit Conductor |
| 39 | Earthing Complete |
| 40 | Gaurding Wire 6'8SWG |
| 41 | Guarding Angle |
| 42 | LT AB 3X95 sq mm |
| 43 | LT AB 3X120 sq mm |
| 44 | 11 kv 3*300 SQ MM XLPE CABLE |
| 45 | O/D CABLE JOINTING KIT |
| 46 | DROPER CHANNEL |
| 47 | PCC POLE 11 Mtr Long |
| 48 | PCC POLE 8.5 Mtr Long |
| 49 | Stay Set Complete 33 KV |
| 50 | Stay Set Complete 11 KV |
| 51 | STP POLE 11 Mtr Long |
| 52 | STP POLE 13 Mtr Long |
| 53 | T-off Channel |
| 54 | Top Channel 125x65mm 33 KV |
| 55 | DISTRIBUTION BOX 3 PHASE WITH CLAMP |
| 56 | Top Channel 125x65mm 11 KV |
| 57 | Providing & Fixing of the following material by the Contractor as perUPPCL/RESPO Rules. |
| 58 | Concreting of Pole |
| 59 | Concreting of Stay |
| 60 | Cross Arm Hoding Clamp 33 KV |
| 61 | Cross Arm Hoding Clamp 11 KV |
| 62 | Danger Board with Clamp |
| 63 | CLAMP NUT & BOLT |
| 64 | ROUND POLE CLAMP |
| 65 | CROSS BREACING M.S ANGLE |
| 66 | J Hook |
| 67 | SUSPENTION CLAMP |
| 68 | DEAD END CLAMP |
| 69 | GI PIPE 6\\" DIA |
| 70 | Nut & Bolt All Size |
| 71 | PRC CLAMP |
| 72 | Aluminium Paint |
| 73 | Red Oxide Paint |
| 74 | Stone Pad |
| 75 | Aluminium Binding Wire |
| 76 | Barbed Wire |
| 77 | F Bracket for 11 KV |
| 78 | SUNDRY ITEM |
| 79 | The following material dismantling & carriage from site to ESC BSR including loading and unloading charges at both ends, required completion of work, distance about to 0 to 70 Km. approx. |
| 80 | Old & used Dog Conductor |
| 81 | Old & used Weasel Conductor |
| 82 | Old & used ABC CABLE |
| 83 | MS Iron Scrap |
| 84 | LT ABC CABLE |
| 85 | ST Pole |
| 86 | All work will be done as per UPPCL/RESPO Rules. Please Enable Macros to View BoQ information |