|
| 1 | Construction of granular sub base by providing well graded material spreading in uniform layers with mortar grader on prepared surface,mixing by mix in place method with rotavater at OMC,and compacting with vibratory roller to achieved the desired density complete as per clause. (A.R) |
| 2 | Construction of dry lean cement concrete (DLC) Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing DSR(16.80) |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns, etc. for mass concrete. DSR 5.9.1 |
| 4 | Construction of un-reinforced dowel jointed, plain cement concrete pavement over a prepared sab bas with approve grade cement @ 350 kg per cum, coars and fine aggregate conforming to IS 383 maximum size of coarse aggregate not exceeding 25mm, mixed in a batching and mixing plant as per approved mix desing, transported to site,laid with a fixid form or slip form paver,spread, compacted and finished in a continuous operation including provision of contraction expansion, contraction and longitudinal joints, joint filler, separation membrane,sealant primer, joint sealant, debonding strip, dowel bar,tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing(A.R) |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 6 | making construction joint in cc road with 0.8 kg Maxfalt, 0.01 kg cement @.0025 cum coarse sand including all complete of work. |
| 7 | S/F Sign board etc all complete. Please Enable Macros to View BoQ information |