| 1 | [13.32]Providing and fixing bolts including nuts and washers complete. |
| 2 | Dismantlement of PCC pole 9 Mtr. Long complete in all respect as per UHBVN specification. |
| 3 | NS Item -Supply and Erection of Galvanized steel item (Flat, Angle, Channel) and Nut and Bolts etc. including cutting, bending to the required shape, drilling hole, carriage, loadingunloading complete in all respect up to the entire satisfaction of Engineer-in-charge.(Ex-GST 18%). |
| 4 | NS Item -Supply and Erection of GI D-Strap as per UHBVN design and specifications complete in all respect up to the entire satisfaction of Engineer-In-Charge (Ex-GST 18%) |
| 5 | NS Item -Supply and Erection of shackle insulator as per UHBVN specification complete in all respect (Ex-GST 18%) |
| 6 | S/E and Erection of ACSR PVC Insulated Conductor 30 Sqmm (confirming to IS 398(PART-II)-1976 -1996,4826-1976 , IS: 1521-1972 and IS:1778-1980 with latest amendments and the erection of the same with accessories including stringing and sagging of conductor as well as jointing and binding with insulator at spots complete in all respect up to the entire satisfaction of the engineer –in - charge. |
| 7 | S/E and Erection of ACSR Cond. 50 Sqmm (confirming to IS 398(PART-II)-1976 -1996,4826-1976 , IS: 1521-1972 and IS:1778-1980 with latest amendments and the erection of the same with accessories including stringing and sagging of conductor as well as jointing and binding with insulator at spots complete in all respect up to the entire satisfaction of the engineer –in - charge. ACSR Conductor 50 Sqmm. |
| 8 | S/E of G.S.L. wire 8 SWG conforming to ISS: 280/1978/1963 with latest amendments complete in all respect and erection of the same upto the entire satisfaction of Engineer-In-charge. Ex-GST 18 % |
| 9 | Supply and Erection of L.T. spacer (Poly Poline type) 4 wire line spacer on the existing L.T. line including the cost of all labour required to complete the job in all respect upto the entire satisfaction of Engineer-In-Charge). |
| 10 | Supply and Erection of LT Cradle Guard / Guard Reel made of GI wire of SWG including fixing in 11kV line complete in all respect up to the entire satisfaction of the Engineer-In-Charge. (Ex-GST 18%). |
| 11 | Supply and Erection of Stay set for LT line complete with GSS 7/8 SWG, Egg, insulator/ Disc Insulator, GI rod 20mm dia threaded up to 250mm length with Nut (wt.6.224kg), cross plate 460 mm of Channel 75×40×6mm (wt.5.330kg), Elbow (wt.2.240kg), clamp with Nut-Bolts etc. as per UHBVN specification complete in all respect up to the entire satisfaction of Engineer-in-charge. |
| 12 | Supply, Erection and Transportation up to site including all taxes as per latest Govt. Instruction amended time again of Prestressed cement concrete pole as per IS: 1678/1960. 9 Mtr. Long 105mm x 115mm at top and 105mm x 315m at bottom with working load of 200kg. Buried 1.80 min ground or as per UHBVNL specification complete in all respect up to the entire satisfaction of Engineer-in-Charge(Ex-GST 18%). Please Enable Macros to View BoQ information |