| 1 | SUB WORK NO 1- RCC G.S.R ( 21000 Litr ) |
| 2 | A) Material Section |
| 3 | Item No.1:- Providing ISI mark G.I. pipes of following class and diameters including all local and central taxes, octroi, inspection charges, transportation to stores, etc.complete. |
| 4 | 80 mm dia Medium |
| 5 | MJP SSR 23/24, |
| 6 | Item No.2 - Providng and supplying Idouble flange Sluice valves confirming for IS 2906/14846 including worn gear arrangement as per test pressure stainless steel spindle, caps including all taxes transportation etc.complete. |
| 7 | 100 mm dia sluice valve PN 1 |
| 8 | 80 mm dia sluice valve PN 1 |
| 9 | B) Labour Section |
| 10 | Item No.1-Designing (aesthetically), andconstructing RCC ground service reservoirs/ RCC sumps in M-300 mix of required capacityincluding excavation in all types of strata,foundation concrete, container walls, bottom slabtop RCC roof slab / or dome, 20 mm thickcement plaster with water proofing compound inCM 1:3 proportion to inside face of the container,including epoxy paint from inside includingrefilling and disposing of surplus stuff within leadof 50 M, all labour and material charges, forlaying and jointing of pipe assembly for inlet,outlet washout, over flow and bypassarrangement consisting of C.I. M.S. D/F. pipes,specials and valves of given diameters, providingand fixing accessories such as M.S. ladderinside and outside, C.I. Manhole frame andcover, water top slab, B.B. masonry chamber forall valves, ventilating shafts,includinggivingsatisfactory hydraulic test and water tightnesstest as per IS code and providing three coats ofcement paints to all exposed surface of structureincluding roof surface etc. complete as perdesign data, criteria, obligatory requirements anddetailed specifications. Anti-termite treatmentshall be given for underground portion of thestructure. |
| 11 | Kocharewadi GSR 21000 Lit. |
| 12 | SUB WORK NO 2- Distribution System |
| 13 | Item No.1 -Providing & supplying in standard lengths polyethelene Pipes, conforming to IS 4984/14151/12786/ 13488 with necessary jointing material like mechanical connector i.e.thread/ insert joint/ quick release coupler joint, including all local & central taxes, transportation and freight charges inspection charges, loading/unloading charges, conveyance to the departmental stores/ site & stacking the same in closed shade duely protecting from sunrays & rains, etc. |
| 14 | 90 mm dia HDPE pipe PE - 100 - 6 kg/cm2 |
| 15 | 75 mm dia HDPE Pipe PE- 100- 6 kg/cm2 |
| 16 | 63 mm dia HDPE Pipe PE- 100- 6 kg/cm2 |
| 17 | MJP DSR 23/24, 123/1A |
| 18 | Item No.2-Providng and supplying Idouble flange Sluice valves confirming for IS 2906/14846 including worn gear arrangement as per test pressure stainless steel spindle, caps including all taxes transportation etc.complete. |
| 19 | 50mmdia sluice valve PN-1 |
| 20 | MJP DSR 23/24, 145/2 |
| 21 | Item No.3 -Excavation for foundation/ pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 mtrs. and lifts as below, stacking and spreading as directed, normal dewatering,preparing the bed for foundation and excluding backfilling etc.complete. |
| 22 | MJP DSR 23/24, 37/3 |
| 23 | Item No.4 - Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated materialupto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation andexcluding backfilling, etc. complete. |
| 24 | MJP DSR 23/24, 38/7 |
| 25 | Item No.5 - Lowering laying & jointing H.D.P.E. Pipe by heating to the ends of pipe with the help of tefflon coated electrimirror/heater to the required temparature & then pressing the end together against each other to form a monolithic & leak proof joint by thermosetting process. the pressing may be required to be done with Jack/Hydraulicjack/Vutt fusion machine etc. complete. with all maerial,labours as directed by Engineer in charge including given satisfacory hydraulic test. |
| 26 | 90 mm dia HDPE pipe PE - 100 - 6 kg/cm2 |
| 27 | 75 mm dia HDPE Pipe PE- 100- 6 kg/cm2 |
| 28 | 63 mm dia HDPE Pipe PE- 100- 6 kg/cm2 |
| 29 | MJP DSR 23/24, 125/2 |
| 30 | Item No.6 - Hydraulic testing of H.D.P.E. Pipe to specified pressure including cost of all materials and labourand water for testing for specified length incluiding cutting placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to providespecified test pressure gauges and other necessary equipments, labour, operation charges, etc required for testing. The rate under this item shall also include cost of retesting, if necessary and reinstating to origenal position. |
| 31 | 90 mm dia HDPE pipe PE - 100 - 6 kg/cm2 |
| 32 | 75 mm dia HDPE Pipe PE- 100- 6 kg/cm2 |
| 33 | 63 mm dia HDPE Pipe PE- 100- 6 kg/cm2 |
| 34 | MJP DSR 23/24, 126/3 |
| 35 | Item No.7- Lowering, laying and jointing in position following C.I.D./F. sluice valve including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. |
| 36 | 50mmdia sluice valve PN-1 |
| 37 | MJP DSR 23/24, 148/4 |
| 38 | Item No.8 - Giving satisfactory hydraulic testing of following C.I.D / F Reflex Valves, Butterfly valves and Sluice Valves. |
| 39 | 50mmdia sluice valve PN-1 |
| 40 | MJP DSR 23/24, 148/4b |
| 41 | Item No.9-Providing, supplying and fixing Air valves as per IS-10845 amd MJP's standard specifications of approved make and quality of following diameters including all taxes(central and local), railway freight, inspection charges unloading from railway wagons, loading into truck, transportation upto departmental stores/site, unloading, stacking etc.complete. |
| 42 | 12/15 mm dia Air valve 760+149+14.90 |
| 43 | MJP DSR 23/24 |
| 44 | Item No.10 - Providing and laying in situ cement concrete mortar 1:2:4 of trap metal for foundation and bedding including bailing out water manually formwork compacting & curing etc. complete. |
| 45 | MJP DSR 23/24, 47/1b |
| 46 | Item No.11 - Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. |
| 47 | MJP DSR 23/24, 40/15 |
| 48 | Item No.12:- Providing 15 mm dia. Functional Household Tap Connection (FHTC) from water distribution system including 15 mm dia. Pipe of following class ferrule, saddle piece, & other necessary specials like elbow, coupler including necessary excavation in all type of strata, refiling and giving satisfactory test etc.complete. |
| 49 | i) Without Roadcrossing |
| 50 | ii) With Roadcrossing |
| 51 | MJP DSR 23/24, 62/1 |
| 52 | Item No.13 :- Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. complete as per IS-1239/2004. |
| 53 | 80 mm dia Medium 689+132+13.20 |
| 54 | 65 mm dia Medium 524+118+18.80 |
| 55 | MJP SSR 23/24, 93/1 |
| 56 | Item No.14 :- Providing and fixing Name Board of the work showing details of the scheme. etc complete. Please Enable Macros to View BoQ information |