| 1 | fo0[k0 dqjkjk ds xzke tejsgh mij esa t;ukjk;.k lpku ds njokts ls ugj rd lhlh jksM fuekZ.k dk;ZA |
| 2 | Earth work in embankment by cartage of earth from 1.00km by tractor tralley including ramming dressing and watering complete |
| 3 | Coarse Sand filling in blanket coat including supply of necessary qty of sand ,ramming dressing ,watering complete |
| 4 | P.C.C. with 40 gaug G.S.B. with approved Coarse sand and cement in the porportion of 1:6:12 I/e supply of all material labour T&P etc. Required for propar complation of work . |
| 5 | M-150 brickwork in 1:4 cement and fine sand mortor including cost of material , labour, T&P complete |
| 6 | Providing & Laying of Polythene Sheet 125 micron thick before laying the c.c.road for making separation with base coat concrete and prevention of pumping I/e supply of all material labour T&P. |
| 7 | P.C.C. with 20mm. Stone grit with approved Coarse sand and cement in the porportion of 1:1.5:3 I/e supply of all material labour T&P etc. Required for propar complation of work |
| 8 | Making expansion /construction joint and transverse or longitudinal contraction joint in interval of 3 mtr each in c.c.road slab by full depth form at header joint and one third depth saw cuts on other joint with cleaning and sealing with Asphalt I/e supply of all material labour T&P etc. |
| 9 | 12mm. Thick plaster work in 1:4 brick work minimum thickness not less then 10mm. With cement and Fine sand of 1.25 F.m. Mortor. |
| 10 | RCC work in 1:1.5:3 cement c sand and 20mm stone grit in patiya /Slab |
| 11 | M.S. work in RCC |
| 12 | Fixing of sign board & photography |
| 13 | fo0[k0 dqjkjk ds xzke tejsgh mij esa larjke iky ds njokts ls xsankyky iky ds njokts rd lhlh jksM fuekZ.k dk;ZA |
| 14 | Earth work in excavation in foundation and nali |
| 15 | Coarse Sand filling in blanket coat including supply of necessary qty of sand ,ramming dressing ,watering complete |
| 16 | P.C.C. with 40 gaug G.S.B. with approved Coarse sand and cement in the porportion of 1:6:12 I/e supply of all material labour T&P etc. Required for propar complation of work . |
| 17 | M-150 brickwork in 1:4 cement and fine sand mortor including cost of material , labour, T&P complete |
| 18 | Providing & Laying of Polythene Sheet 125 micron thick before laying the c.c.road for making separation with base coat concrete and prevention of pumping I/e supply of all material labour T&P. |
| 19 | P.C.C. with 20mm. Stone grit with approved Coarse sand and cement in the porportion of 1:1.5:3 I/e supply of all material labour T&P etc. Required for propar complation of work |
| 20 | Making expansion /construction joint and transverse or longitudinal contraction joint in interval of 3 mtr each in c.c.road slab by full depth form at header joint and one third depth saw cuts on other joint with cleaning and sealing with Asphalt I/e supply of all material labour T&P etc. |
| 21 | 12mm. Thick plaster work in 1:4 brick work minimum thickness not less then 10mm. With cement and Fine sand of 1.25 F.m. Mortor. |
| 22 | RCC work in 1:1.5:3 cement c sand and 20mm stone grit in patiya /Slab |
| 23 | M.S. work in RCC |
| 24 | Fixing of sign board & photography |
| 25 | GST Extra as per applicable Please Enable Macros to View BoQ information |