| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1,5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.DSR-2023, 2.6. |
| 2 | Provinding and laying cement concrete 1:4:8 (1 Cement: 4 coarse sand derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources).DSR-2023, 4.1.8. |
| 3 | M150 brick work Designation 7.5 in foundation and plinth in: Brick work with common burnt clay F.P.S. (non modular) bricks of class.DSR-2023,6.1.1. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement: 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources. DSR 2023 4.1.5 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete DSR 2023 5.9.1 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers DSR 2023 5.9.5 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts .DSR 2023 5.9.6 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement: 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).DSR-2023, 5.3 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.DSR-2023, 5.22A.6 |
| 10 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.DSR-2023, 10.2 |
| 11 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 Itr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) DSR.2023, 13.47.1 |
| 12 | Excavating, supplying, stacking and filling of local earth (including royalty) b mechanical transport upto a lead of 5km allso including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. DSR 2023 2.25(a) Please Enable Macros to View BoQ information |