| 1 | Dismantaling of damage cement concrete including stacking the useful materials for reuse and removing the debrise away from work site etc complete. |
| 2 | Providing cement concrete for unreinforced cement concrete works of proportion (1:4:8) with 40mm size crusher broken hard granite (CBHG) metal of approved quality and from approved quarry in foundation bed and floors including cost of labour, materials (inclusive of cost, conveyance, royalties, taxes, loading and unloading) & equipments for handing, transportation, batching, mixing, placing in position vibrating, curing for __ days complete as per specification drawing and direction of the Engineer-in-charge. |
| 3 | Providing & laying cement concrete of prop. (1:2:4) in road work using 12mm size crusher broken hard granite chips of approved quality & from approved quarry including laying in the layers not exceeding 150mm thick hoisting, lowering, laying, watering and curing etc. complete to the required levels including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&p etc. as required for the work complete and as per direction of Engineer in charge. |
| 4 | providing Cement Concrete forR.C.C works of (M-20) using 20mm size down graded crusher broken hard granite (CBHG) stone chips of approved quality & from approved quarry on the road surface including cost of labour, materials (inclusive of cost, conveyance, royalties, taxes, loading & unloading) & equipments for handing, transportation, batching, mixing, placing in position / layers, vibrating, curing for 28 days complete as per specification drawing and direction of the Engineer-in-charge |
| 5 | Straightening, cutting, bending and binding, welding and jointing (if necessary) coiled/ bent up MS Rods/Tor Steel/deformed rods etc. including hoisting, placing in position, tying the grills binding with 18 to 20 gauge binding wire required for R.C.C work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete (weight of binding wire will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S rods or Tor steel linear measurements of rod for finished item of works. 5% wastage and lap length are included in the finished rate). |
| 6 | Supplying transporting fitting&fixing 12 mm thick Bitumenous expansion joint board (ISI) including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&p etc. as required for the work complete and as per direction of Engineer in charge |
| 7 | Making Signage, Photography and other unforseen items i.e non plastic in between slabs & road and dressing & cleaning etc labour engazed complete |
| 8 | Removal of excavated earth & Dismantaling materials away from work site by mechanical means up to 5km lead and lift etc complete as per direction of Engineer in charge. Please Enable Macros to View BoQ information |